ML17089A482
From kanterella
Revision as of 16:20, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17089A482 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 01/11/2017 |
Revision: | 0 |
From: | Zalesiak C A Dominion, Virginia Power (Virginia Electric & Power Co) |
To: | Office of Nuclear Material Safety and Safeguards |
References | |
17-059 CE-1399, Addendum #00A, Revision 0 | |
Download: ML17089A482 (17) | |
Similar Documents at North Anna | |
---|---|
Category:Calculation
MONTHYEARML22122A0702022-04-14014 April 2022
[Table view]VPAP-2103N, Revision 30, Offsite Dose Calculation Manual (North Anna) ML19249B7762019-08-29029 August 2019 Enclosure 6 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations ML19249B7812019-08-29029 August 2019 Enclosure 7 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations ML19011A1762019-01-0404 January 2019 Enclosure 7 - Summary of Calculations ML19011A1772019-01-0404 January 2019 Enclosure 7 - Attachment 1 - Calculation RP-18-08, MPS1 Abnormal Rad Release Gaseous EAL Thresholds Based on NEI 99-01, Revision 6. ML19011A1792019-01-0404 January 2019 Enclosure 7 - Attachment 2 - Calculations for Containment High Range Radiation Monitor Responses to a LOCA ML19011A1802019-01-0404 January 2019 Enclosure 7 - Attachment 3 - Detector Response to an RCS Sample ML19011A1812019-01-0404 January 2019 Enclosure 7 - Attachment 4 - Post-Accident Radiation Response for Primary Sample Line ML19011A1822019-01-0404 January 2019 Enclosure 7 - Attachment 5 - Post-Accident Radiation Monitor Response for Core Uncovery ML19011A1832019-01-0404 January 2019 Enclosure 7 - Attachment 6 - Post-Accident Letdown Radiation Monitor Response ML18093B0782017-12-21021 December 2017 Attachment 3: Calculation C-4520-00-03-NP, Rev. 1, Crack Growth Analyses for NAPS Unit 2 Steam Generator Outlet Nozzles. ML17089A4822017-01-11011 January 2017 Redacted - North Anna & ISFSI - Response to Request for Referenced Information: Dominion Calculation CE-1399, Addendum #00A Evaluation of Ageing Effects of Concrete Cask Drop & Tipover Events, Rev. 0 ML15084A4762015-03-0404 March 2015 Calculation Package - Na SWR Breach Analyses 03042015 ML0714103242007-05-0202 May 2007 Calculation 32-9049828-000, North Anna Units 1 & 2 Weld Overlay - Piping Evaluation. ML0714103202007-04-30030 April 2007 Calculation 32-9049384-000, North Anna Units 1 & 2, Pressurizer Surge Nozzle Weld Overlay Engineering Evaluation of Insurege/Outsurge Transients. ML0714103232007-04-30030 April 2007 Calculation 32-9049386-000, North Anna Units 1 & 2 Pressurizer- Spray Nozzle Weld Overlay Analysis. ML0714103282007-04-30030 April 2007 Calculation 32-9049387-000, North Anna Units 1 & 2, Pressurizer Surge Nozzle Weld Overlay Analysis. ML0714103312007-04-30030 April 2007 Calculation 32-9049388-000, North Anna Units 1 & 2 Pressurizer Safety/Relief Nozzle Weld Overlay Analysis. ML0714103132007-04-27027 April 2007 Calculation 32-9049433-000, North Anna Units 1 & 2 Pzr Surge Nozzle Weld Overlay Crack Growth Evaluation. ML0714103172007-04-27027 April 2007 Calculation 32-9049429-000, North Anna Units 1 & 2 Pzr Safety/Relief Nozzle Weld Overlay Crack Growth Evaluation. ML0714103072007-04-26026 April 2007 Calculation 32-9049431-000, North Anna Units 1 & 2 Pzr Spray Nozzle Weld Overlay Crack Growth Evaluation. ML17065A2512002-02-0101 February 2002 ISFSI - Response to Request for Referenced Information: Dominion Calculation NE-1311, Technical Report, Evaluation of the TN-32 Cask with Increased Enrichment and Burnup Fuel, Rev. 0 2022-04-14 Category:Response to Request for Additional Information (RAI) MONTHYEARML24086A4292024-03-25025 March 2024
[Table view]Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23136A8832023-05-16016 May 2023 Responses to Request for Additional Information and Request for Confirmation of Information Regarding Environmental Review of Subsequent License Renewal Application L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23103A2752023-04-13013 April 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request for Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22115A1752022-04-25025 April 2022 ASME Section XI Inservice Inspection Program - Relief Request N2-14-LMT-004 - Fourth Interval Third Period Limited Examinations - Response to Request for Additional Information ML21350A4082021-12-16016 December 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Genera Tor Tube Inspections, Rev 1, Using the Consolidated Line-Item Improvement Process Response to RAI ML21341B4372021-12-0606 December 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application Responses to NRC Request for Additional Information Safety Review - Set 5 ML21258A3542021-09-15015 September 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Confirmation of Information Set 2 Safety Review ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21210A3962021-07-29029 July 2021 (Naps), Units 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 4 and Supplement 3 ML21147A2932021-05-27027 May 2021 (Naps), Units 1 and 2 Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 3 and Administrative Change to SLRA Table A4.0-1, Item 25 ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21126A3152021-05-0606 May 2021 Proposed License Amendment Request to Battery Surveillance Requirements - Response to Request for Additional Information ML21119A2872021-04-29029 April 2021 (Naps), Unit 1 and 2 - Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Safety Review - Set 2 and Flow Accelerated Corrosion Program Enhancement Completion ML21091A1872021-04-0101 April 2021 Response to NRC Request for Additional Information Regarding Safety Review - Set 1 & Clarification to Aging Management of Fire Protection System Lined Ductile Iron Valves ML21084A1822021-03-24024 March 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information for the Safety Review - Set 1 ML21056A5572021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21053A4332021-02-22022 February 2021 (Naps), Units 1 and 2 - Subssequent License Renewal Application (SLRA) Environmental Review - Response to NRC Request for Additional Information ML21042B9042021-02-11011 February 2021 Subsequent License Renewal Application, Response to NRC Requests for Confirmation of Information for the Environmental Review ML21033A3022021-01-25025 January 2021 (NAPS) Units 1 and 2 - Subsequent License Renewal Application (SLRA) - Provides Requested Documents in Response to Environmental Audit. Part 1 of 2 ML21022A1752020-12-16016 December 2020 Steam Generator Tube Inspection Report RAI Response ML20296A6672020-10-22022 October 2020 ASME Section XI Inservice Inspection Program Proposed Inservice Inspection Relief Request N1-I4-LMT-003 Response to Request for Additional Information ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20268B1872020-09-24024 September 2020 ASME Section XI Inservice Inspection Program, Proposed Inservice Inspection Alternative N1-I5-NDE-002, Response to Request for Additional Information ML20156A2872020-06-0404 June 2020 Inservice Testing Program Plan for Pumps, Valves, and Snubbers Fifth 10-Year Interval Update for Units 1 & 2 Request for Alternatives to Requirements of ASME OM Code - Response to RAI ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20140A3362020-05-18018 May 2020 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules - Response to Request for Additional Information ML20021A0052020-01-17017 January 2020 Inservice Testing Program Request for Alternative to Requirements of ASME OM Code Relief Request P-9, Response to Request for Additional Information ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19248B7622019-08-22022 August 2019 Supplement to Proposed License Amendment Request - Flood Protection Dike Modification - Response to Onsite Audit Questions ML19225D1302019-08-0808 August 2019 Response to Request for Additional Information (Follow-Up) Regarding Open Phase Protection Per NRC Bulletin 2012-01 - Proposed License Amendment Request ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19156A2072019-05-24024 May 2019 Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 ML19071A1142019-03-0707 March 2019 Response to 03/12/2012 Information Request, Seismic Probabilistic Risk Assessment Supplement for Recommendation 2.1 ML18267A0682018-09-18018 September 2018 Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests ML18257A2272018-09-14014 September 2018 SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant Response ML18169A2262018-06-13013 June 2018 Attachment 1 - Response to Request for Additional Information ML18169A2272018-06-13013 June 2018 Attachment 3 - Proposed NAPS Emergency Plan Changes ML18093A4452018-03-28028 March 2018 Ad 2, Response to 03/12/2012 Information Request Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML18092A0812018-03-26026 March 2018 Supplement to Proposed License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML18037A7042018-01-31031 January 2018 Response to Request for Additional Information Regarding Proposed License Amendment Request for Spent Fuel Storage and New Fuel Storage ML17354A1602017-12-14014 December 2017 Response to March 12, 2012 Information Request Spent Fuel Pool Seismic Evaluation for Recommendation 2.1 ML17241A0452017-08-24024 August 2017 Proposed ISI Alternatives NI-14-NDE-010 and N2-14-NDE-005 Reactor Pressure Vessel Nozzle Weld Inspections Response to Request for Additional Information ML17171A2302017-06-14014 June 2017 Response to Request for Additional Information ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-009 and N2-I4-NDE-004 ML17065A2502017-02-28028 February 2017 & Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Response to Request for Referenced Information Related to RAIs 2-2, 3-5, and 3-8 2024-03-25 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17089A482&oldid=334762"