MONTHYEARML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes ML24078A2622024-03-26026 March 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML24058A1572024-03-19019 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24017A2092024-03-12012 March 2024 – Issuance of Amendment Nos. 254 and 209 to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage 2024-09-09
[Table view] |
Text
May 20, 2021 Mr. Don Moul Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd Juno Beach, FL 33408
SUBJECT:
NOTIFICATION OF ST. LUCIE PLANT UNITS 1 & 2 DESIGN BASES ASSURANCE INSPECTION (TEAMS)- U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000335/2021010 AND 05000389/2021010
Dear Mr. Moul:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a Design Bases Assurance Inspection (DBAI) at your St. Lucie Plant Units 1 & 2 during the weeks of October 18- 22, and November 1- 5, 2021.
Mr. Geoffrey Ottenberg, a senior reactor inspector from the NRCs Region II office, will lead the inspection team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M, Design Bases Assurance Inspection (Teams), dated December 8, 2016 (ADAMS ML16238A320).
The inspection will evaluate the capability of components that have been modified and risk-significant/low-margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
During a telephone conversation on May 17, 2021, with Mr. Wyatt Godes, we confirmed arrangements for an information-gathering site visit and the two-week onsite inspection. The schedule is as follows:
- Information-gathering visit: Week of September 13- 17, 2021
- Onsite weeks: Weeks of October 18- 22, and November 1- 5, 2021
D. Moul 2 The purpose of the information-gathering visit is to meet with members of your staff to identify components that have been modified, risk-significant components, and operator actions.
Information and documentation needed to support the inspection will also be identified.
Mr. Shane Sandal, a Region II Senior Risk Analyst, will support Mr. Ottenberg during the information-gathering visit to review probabilistic risk assessment data and identify components to be examined during the inspection. Additionally, during the onsite weeks, time may be needed on the plant-referenced simulator in order to facilitate the development of operator action-based scenarios.
The enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II Office by Friday, September 3, 2021.
Additional documents will be requested following the information-gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation. The additional information will be needed in the Region II office by Friday, October 8, 2021, to support the inspection teams preparation week. During the information-gathering trip, Mr. Ottenberg will also discuss the following inspection support administrative details, as applicable: (1) availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; (2) method of tracking inspector requests during the inspection; (3) licensee computer access; (4) working space; (5) arrangements for site access; and (6) other applicable information.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Thank you for your cooperation in this matter. If you have any questions, regarding the information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or contact me at 404-997-4506.
Sincerely,
/RA/
James Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67 and NPF-16
Enclosure:
Notification of St. Lucie Units 1 & 2, Design Bases Assurance Inspection (Teams) cc: Distribution via Listserv
ML21140A090 SUNSI Non-Sensitive Publicly Available Review OFFICE RII:DRS RII: DRS NAME G. Ottenberg J. Baptist DATE 05/17/2021 05/20/2021 INFORMATION REQUEST FOR ST. LUCIE UNITS 1 & 2 DESIGN BASES ASSURANCE INSPECTION (TEAMS)
Please provide the information electronically in .pdf files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),
should have a date range from January 1, 2018, until present.
- 1. *List and brief description of permanent and field work completed plant modifications including permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications. Include an index of systems (system numbers/designators and corresponding names), the safety classification for each modification, and type of modification.
- 2. From your most recent probabilistic safety analysis (PSA) excluding external events and fires:
- a. Two risk rankings of components from your site-specific PSA: one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance
- b. A list of the top 500 cut-sets
- c. A list of the top 500 LERF contributors
- 3. From your most recent PSA including external events and fires:
- a. Two risk rankings of components from your site-specific PSA: one sorted by RAW, and the other sorted by Birnbaum Importance
- b. A list of the top 500 cut-sets
- 4. Risk ranking of operator actions from your site-specific PSA sorted by RAW and human reliability worksheets for these items
- 5. List of time-critical operator actions with a brief description of each action
- 6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design-required output, heat exchangers close to rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and associated evaluations or calculations
- 7. *List and brief description of Root Cause Evaluations performed
- 8. *List and brief description of common-cause component failures that have occurred
- 9. *List and brief description of Operability Determinations and Functionality Assessments
- 10. *List and reason for equipment that has been classified in maintenance rule (a)(1) status Enclosure
2
- 11. *List of equipment on the sites Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list, and summaries (if available) of your plans to address the issue(s) along with dates added or removed from the issues list
- 12. List of current operator work arounds/burdens
- 13. Copy of Updated Final Safety Analysis Report
- 14. Copy of Technical Specification(s)
- 15. Copy of Technical Specifications Bases
- 16. Copy of Technical Requirements Manual(s)
- 17. Copy of the Quality Assurance Program Manual
- 18. Copy of Corrective Action Program Procedure(s)
- 19. Copy of Operability Determination Procedure(s)
- 20. List of motor operated valves and air operated valves in the valve program, and their associated design margin and risk ranking
- 21. Primary AC and DC calculations for safety-related buses
- 22. One-line diagram of electrical plant (Electronic only)
- 23. Index and legend for electrical plant one-line diagrams
- 24. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)
- 25. Index and legend for P&IDs
- 26. Index (procedure number, title, and current revision) of station Emergency Operating Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures
- 27. Copies of corrective action documents generated from previous CDBI
- 28. Copy of any self-assessments performed, and corrective action documents generated, in preparation for current DBAI
- 29. Contact information for a person to discuss PSA information prior to and during the information-gathering trip (Name, title, phone number, and e-mail address)