Monthly Operating Rept for Oct 1986
ML20212M055
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/31/1986
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
U-600768, NUDOCS 8701290482
Download: ML20212M055 (5)


Text

_

f;

<,. ,s - .

6..l _'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DiTE 10/31/86 COMPLETED BY F. A. Spangenberg TELEPEONE (217) 935-8881 X-3400

. MONTH October, 1986 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 l

16 0 0

.TE94 L '//

  • .r-OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/86 COMPLETED BY F. A. Spanaenberg TELEPHONE (217) 935-8881 X-3400 OPERATING STATUS
1. . REPORTING PERIOD: October 1986 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 144.7 MAX. DEPEND. CAPACITY (MWe-Net): Not Available DESIGN ELECTRICAL RATING (MWe-Net): 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 46.6
4. REASONS FOR RESTRICTION (IF ANY):

Clinton 1 is in the startup testing phase and is limited to 5% of rated reactor power.

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL.. . 0 0 0
6. REACTOR RESERVE SHUTDOWN HOURS......... 0 0 0
7. HOURS GENERATOR ON LINE................ 0 0 0

[. 8. UNIT RESERVE SHUTDOWN HOURS............ 0 0 0

9. GROSS THERMAL ENERGY GENERATED (MWH)... 0 0 0
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0 l
11. NET ELECTRICAL ENERGY GENERATED (MWH)..- 0 0 0
12. REACTOR SERVICE FACTOR................. N/A 0 0
13. REACTOR AVAILABILITY FACTOR............ N/A 0 0 ,
14. UNIT SERVICE FACT 0R.................... N/A 0 0 l 15. UNIT AVAILABILITY FACTOR............... N/A 0 0
16. UNIT CAPACITY FACTOR (Using MDC)....... N/A 0 0
17. UNIT CAPACITY FACTOR (Using Design MWe) N/A 0 0 f

{- 18. UNIT FORCED OUTAGE RATE................ N/A 0 0

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Maintenance Shutdown, 2/4/87, 12 days

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

11/20/86

21. UNITS IN TEST STATUS (PRIOR TO COMKERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY g 12/31/86 INITIAL ELECTRICITY 1/25/87 COMMERCIAL OPERATION 3/30/87

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/86 COMPLETED BY F. a. Spangenberg TELEPHONE (217) 935-8881 X-3400 REPORT MONTH October 1986 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION ,T E REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

No shutdowns during this report period.

SUMMARY

1

. t I e

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month October 1986 (None to be reported this month)

U- 600768 L30-86 (11 -13 )-L 1A.120 ILLINDIS POWER COMPANY CLINTON POWIR STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 November 13, 1986 Docket No. 50-461 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 October 1986 Monthly Operating Report NPF-55

Dear Sir:

Please find enclosed the monthly operating report for Clinton Power l Station, Unit 1, for the period ending October 31, 1986 I

Sincerely yours, s -

F. A. Spa genbe ,

t Manager - Licensing andksafety JLP/bsa Enclosure cc: Regional Administrator, Region III, USNRC f>