Notice of Violation from Insp on 980518-22.Violation Noted: Design Analysis & Calculations Rept DAC-815-19938-0001,dtd 980120 Documented Existing Rail Stops on Levelator Would Not Prevent Rolling Scale Cart & Carried Cylinder Off End
ML20249B067
Person / Time
Site: 07007001
Issue date: 06/15/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20249B059 List:
References
70-7001-98-10, NUDOCS 9806220029
Download: ML20249B067 (1)


Text

..

NOTICE OF VIOLATION United States Enrichment Corporation - Docket No. 70-7001 Paducah Gaseous Diffusion Plant Certificate No. GDP-1 During an NRC inspection conducted from May 18 through May 22,1998, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

Technical Safety Requirement Design Feature 2.1.5.8, " Hydraulic Lifts - Rail Stops," requires, in part, that the rail stops on the wvelator prevent rolling the scale cart and its carried cylinder off

. the end of the lift. I Contrary to the above, Design Analysis and Calculations Report DAC-815-19938-0001, dated January 20,1998, documented that the existing rail stops on the levelator would not prevent rolling the scele cart and the carried cylinder off the end of the lift. Specifically, the design analysis and calculations determined the rail stops would be inadequate for stopping a sc#e cart carrying a full liquid cylinder traveling at full scale cart velocity (12 inches per second).

This is a Severity Level IV violation (Supplement VI). (VIO 70-7001/98010-01)

The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance will be achieved is already adequately addressed on the docket, in NRC Inspection j Reports 70-7001/97012(DNMS),70-7001/98002(DNMS), and 70-7001/98010(DNMS). However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the l

~ description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a " Reply to a Notice of Violation," and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region lit, and a copy -

to the NRC Resident inspector at the Paducah Gaseous Diffusion Plant of this Notice, within 30 days of the date of the letter transtrJtting this Notice of Violation, if you contest this enforcement action, you should also provide a copy of your response to the Director, Office of Enforcernent, U.S. Nuclear Regulatory Commission, Washington, D.C.

20555-0001.

If you choose to respond, your response will be placed in the NRC Public Document Room (PDR); therefore, to the extent possible, it should not include any personal, privacy, proprietary, er safeguurds information so that it can be placed in the PDR without redaction. Under the )

authority of Section 182 of Act 42 U.S.C. 2232, any response shall be submitted under oath or ,

affirmation. 1 Dated at Lisle, Illinois this 15th day of June 1998 i

9806220029 900615

_PDR ADOCK 07007001 PDR .