MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] |
Text
B. Whitley UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 24, 2020 Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway, Bin N-226-EC Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 ISSUANCE OF AMENDMENTS RE: TECHNICAL SPECIFICATION 3.3.13 FOR MAIN CONTROL ROOM EMERGENCY HABITABILITY SYSTEM (VES)
INSTRUMENTATION APPLICABILITY CHANGE AND INCLUDE UNDERVOLTAGE ACTUATION (LAR 20-003) (EPID L-2020-LLA-0101)
Dear Mr. Whitley:
In response to your application dated May 7, 2020, as supplemented by letter dated June 22, 2020, the U.S. Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 184 and 182 to Combined License (COL) Nos. NPF-91 and NPF-92 for the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, respectively. The requested amendments consist of changes to COL Appendix A, Technical Specifications (TS) and Updated Final Safety Analysis Report (UFSAR).
Specifically, the amendments authorize changes to the following COL Appendix A, TS: TS 3.3.13, Engineered Safety Feature Actuation System (ESFAS) Main Control Room (MCR)
Isolation, Air Supply Initiation, and Electrical Load De-energization applicability is revised to exclude operability of the MCR Air Supply Iodine or Particulate Radiation - High 2 function when the MCR envelope is isolated and the MCR emergency habitability system (VES) is operating; TS 3.3.13 is revised to include Class 1E 24-Hour Battery Charger Input Undervoltage actuation signals for VES actuation and de-energization of the MCR air supply radiation monitoring sample pumps; and TS 3.8.1, DC Sources - Operating, and TS 3.8.2, DC Sources - Shutdown, are revised to include a Surveillance Requirement to verify each MCR air supply radiation monitoring sample pump de-energizes on an actual or simulated actuation signal. The amendments also authorize certain changes to the UFSAR that involve these TS changes.
B. Whitley A copy of the related Safety Evaluation, which includes the staffs evaluation of the amendments, is enclosed. The notice of issuance of the amendment documents included in this letter will be published in the Federal Register.
Sincerely,
/RA/
Alina Schiller, Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket Nos.: 52-025 52-026
Enclosures:
- 1. Amendment No. 184 to VEGP Unit 3 COL
- 2. Amendment No. 182 to VEGP Unit 4 COL
- 3. Safety Evaluation cc: See next page
ML20237F487 - Package *via e-mail NRO-008 OFFICE NRR/VPO/LA NRR/VPO/PM DSS/SCPB/BC NRR/VPO/PM NAME RButler ASchiller (c) BWittick* CSantos* (c)
DATE 8/25/20 8/25/20 9/3/20 8/31/20 OFFICE OGC/NLO NRR/VPO/BC DSS/STSB/BC NRR/VPO/PM NAME MSpencer* OLopez-Santiago* (c) VCusumano* ASchiller* (s)
DATE 9/23/20 9/4/20 9/2/20 9/24/20 OFFICE DEX/EENB/BC DRA/ARCB/BC DEX/EICA/BC NRR/VPO/BC NAME TMartinez* KHsueh* JJohnston* OLopez-Santiago* (s)
DATE 9/3/20 9/10/20 9/10/20 9/24/20 Vogtle Mailing List (Revised 9/16/2020) cc:
Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 7825 River Road, BIN 63031 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael J. Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road Waynesboro, GA 30830 BIN 63031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Mailing List Email:
ppsena@southernco.com (Peter Paul Sena III) dlmckinn@southernco.com (D.L. McKinney mdmeier@southernco.com (Michael Meier) gchick@southernco.com (Glen Chick) ststimac@southernco.com (Stephen Stimac) patmarti@southernco.com (Patrick A. Martino) myox@southernco.com (Michael J. Yox) asparton@southernco.com (Anthony S. Parton) kroberts@southernco.com (Kelli A. Roberts) tgpetrak@southernco.com (Tom C. Petrak) ctdefnal@southernco.com (Chris T. Defnall) cemorrow@southernco.com (Calvin E. Morrow) x2rlbeil@southernco.com (Robert L. Beilke) sleighty@southernco.com (Steve Leighty) acchambe@southernco.com (Amy C. Chamberlain) jhaswell@southernco.com (Jeremiah C. Haswell) chandu.patel@nrc.gov (Chandu Patel) george.khouri@nrc.gov (George Khouri) nicholas.karlovich@nrc.gov (Nicholas D. Karlovich andrew.lerch@nrc.gov (Andrew Lerch) christopher.even@nrc.gov (Christopher Even) brian.kemker@nrc.gov (Brian J. Kemker) nicole.coovert@nrc.gov (Nicole C. Coovert) christopher.welch@nrc.gov (Christopher Welch) james.gaslevic@nrc.gov (James Gaslevic) victor.hall@nrc.gov (Victor Hall) garry.armstrong@nrc.gov (Garry Armstrong) michael.webb@nrc.gov (Michael Webb) thomas.fredette@nrc.gov (Thomas Fredette) steven.smith@nrc.gov (Steven Smith) cayetano.santos@nrc.gov (Cayetano Santos) marissa.bailey@nrc.gov (Marissa Bailey) steven.rose@nrc.gov (Steven Rose) bradley.davis@nrc.gov (Bradley Davis) jose.vasquez@nrc.gov (Jose Vasquez) jason.eargle@nrc.gov (Jason Eargle) kenya.carrington@nrc.gov (Kenya Carrington) michael.king2@nrc.gov (Michael King) evan.davidson@nrc.gov (Evan Davidson) theodore.fanelli@nrc.gov (Theodore Fanelli) bob.brinkman@opc.com (Robert B. Brinkman) eric.rasmussen@opc.com (Eric Rasmussen) jfuller@meagpower.org (J. E. Fuller) sjackson@meagpower.org (S.M. Jackson) tbundros@dutil.com (T. Bundros) orianil@westinghouse.com (Dr. L. Oriani)
Page 2 of 3
Vogtle Mailing List continued durhamdc@westinghouse.com (D. C. Durham) corletmm@westinghouse.com (M.M. Corletti) harperzs@westinghouse.com (Zach Harper) cowardjl@westinghouse.com (J. L. Coward) swkline@bechtel.com (S. W. Kline) lisa.matis@tetratech.com (Lisa Matis) bill.jacobs@gdassociates.com (Dr. Bill Jacobs) sroetger@psc.state.ga.us (S. Roetger) rtrokey@psc.state.ga.us (Robert L. Trokey) kevin.greene@troutmansanders.com (Kevin C. Greene) sblanton@balch.com (Stan Blanton) g2ndrmdc@southernco.com (SNC Document Control)
Page 3 of 3