ML20366A091

From kanterella
Revision as of 02:24, 23 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Mit Nuclear Reactor Laboratory, Duties of Reactor Superintendent
ML20366A091
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/21/2020
From: Foster J
MIT Nuclear Reactor Laboratory
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML20366A091 (1)


Text

MJT' NUCLEAR REACTOR LABORATOR.Y AN MIT INTERDEPARTMENTAL CENTER John P. Foster Mail Stop: NW12-116A Phone: 617 253-4211 Director of Reactor Operations 138 Albany Street Fax: 617 324-0042 Cambridge,. MA 02139 Email: jpfostermit.edu December 21, 2020 U. S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Document Control Desk

Subject:

Duties of Reactor Superintendent

Dear Sir or Madam:

The following is provided as an item of information. Mr. Marshall Wade has been named Interim Reactor Superintendent fur the MIT Research Reactor effective December 7, 2020. He succeeds Ms. Sarah Don who has accepted a position outside of MIT.- Mr. Wade's e4ucation and experience exceed the requirements ofMITR Technical Specification No. 7.1.4 (2).

~

Jolm P. Foster Director of Reactor Operations Cc: USNRC- - Senior Reactor Inspector Research and Test Reactors Section NRR/DRIP/RNRP USNRC ~ Senior Project Manager NRR/DRIP/RNRP