Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel Flange
ML20236K801
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/02/1987
From: Alexion T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8711090364
Download: ML20236K801 (7)


Text

  • *

. November 2,.1987

' Docket No. 50-483 LICENSEE: Union. Electric Company FACILITY: Callaway Plant

SUBJECT:

SUMMARY

OF MEETING WITH UNION ELECTRIC COMPANY REGARDING STUCK.

REACTOR' VESSEL HEAD CLOSURE BOLTS On October 23, 1987, the staff met with Union Electric Company regarding.the  !

stuck reactor vessel head closure bolts at Callaway. . Meeting attendees are )

listed in Enclosure 1. Slides used during the presentations are in Enciosure 2. 1 At the staff's request, the licensee presented the sequence of events',. root; cause, corrective action, action to prevent ~ recurrence, and current plans.-

Included in the presentation were discussions on.the licensee'.s~ technical .

specification interpretation, 10 CFR 50.59 review and safety evaluation for Cycle 3 operation.

The staff agreed to allow the licensee to. enter modes 5, 4 and 3,. but. requested that the licensee formally submit their. safety analysis-for staff review and approval before. proceeding to criticality. In addition to the analysis regarding'.-

one closure bolt not fully tensioned, the staff requested an ~ analysis for three-adjacent closure bolts not fully tensioned. Additionally, the' staff requested that the licensee commit to: (1) a strict leakage limit on the: vessel flanger (i gpm or lower);. (2) report the results of the tensioning; and.(3) remove all>

stuck bolts at the next refueling. outage.-

. hl Thomas: WL Alexion, Project Manager:

, . Project Directorate III-3 Division'of Reactor Projects.

I

Enclosures:

As stated cc: See next page DISTRIBUTION:

(DocketrfilesdL NRC PDR Local PDR PDIII-3 r/f DWigginton

'TAlexion-

] :

! OGC-Bethesda l

! EJordan JPartlow-ACRS(10)

Office: LA/9QIII-3 PM/ PD I I-3 AD ,

Surname: PK 4zer .TA ex -DWigginton GF han 'i Datei , 10 /87 -/87 106 9 87' J6/4 /87 j' 9711090364 DR 871102 'l ADDCK 05000493 l

PDR j u

Mr. D. F. Schnell Ca'llaway Plant j Union Electric Company Unit No. I l cc:

Dr. J. O. Cermack Mr. Bart D. Withers '

CFA Inc. President and Chief I 4 Professional Dr., Suite 110 Executive Officer Gaithersburg, MD 20879 Wolf Creek Nuclear Operating Corporation Gerald Charnoff, Esq. P. O. Box 411 i gm

_._... Thomas A.,Bax_ter, .Burlington..Kansasc66839 _g.

.-m.H Potts ,Esq& W

. ... ._,... ._. . .s. ,

Shaw, Pittman, owbridge j

, 2300 N Street, N. W. Mr. Dan I. Bolef, President  !

Washington, D. C. 20037 Kay Drey, Representative l Board of Directors Coalition: 1 Mr. T. P. Sharkey for the Environment Supervisor, Compliance St. Louis Region ]

Union Electric Company 6267' Delmar Boulevard j Post Office Box 620 University City, Missouri 63130 j Fulton, Missouri 65251 j

i U. S. Nuclear Regulatory Commission l l

Resident inspectors Office RR#1 j

l l Steedman, Missouri 65077 I

Mr. Alan C. Passweter, Manager Licensing and Fuels Union Electric Company f

Post Office Box 149 1 St. Louis, Missouri 63166 Manager - Electric Department j Missouri Public Service Consnission i 301 W. High Post Office Box 360 .

Jefferson City, Missouri 65102

']

Regional Administrator U. S. NRC, Region 111 l 799 Roosevelt Road l Glen Ellyn, Illinois 60137 Mr. Ronald A. Kucera, Deputy Director-Department of Natural Resources

( P. 0. Eox 176 1 Jefferson City, Missouri 65102 J

i b

-t

s &

ENCLOSURE 1 STUCK. HEAD CLOSURE BOLTS MEETING OCTOBER 22, 1987

]

ATTENDANCE LIST l

NAME ORGANIZATION ]1 D. Crutchfield NRC I

. . _ , @ Hplahan _ .. ... . -. - - - - -

- - = --NR L - - -

i. - ww.smer num i J!s'REhirdson NRC D. Dilanni NRC L. Marsh NRC l C. Cheng NRC P. Vuo NRC-K. Wichman NRC R. Emch NRC 4 J. Hinds NRC 'l L. Wheeler NRC l T. Alexion NRC ]

' R. Johnson NRC' 1 A. Lee NRC. I C. Sellers NRC '!

A. Passwater R. Affolter UE UE l

W. Campbell UE T. Hermann ~UE W. Robinson UE L. Benson UE S. Abbott W W. Hielker CE

[

. . - -. . .n.  !,

, ENCLOSURE 2-m.

I. INTRODUCTION II. SEQUENCE OF EVENTS A. REFUEL I OUTAGE J

, 1. STUD #7 COULD NOT BE REMOVED DURING REFUEL I. 'f !

2. STUD #7 WAS SEALED WITH A PROTECTIVE WATERPROOF CAP. Jf l' .,

l B. REFUEL II OUTAGE l i i n.a.mmanme - - mmmm.y. 4%gg 9g.,m.au a ,uaunmuu,.aw.w. - we muumumd e.4

q

. ABOUT HALF THE STUDS CAME OUT VERY EASILY. ]

-q

. OF THE REMAINING HALF, ALL BUT SEVEN CAMEl0UT WITHOUT MUCH DIFFICULTY.-

. 'TWO STUDS (42, 53) CAME OUT USING'A SLUGGING' WRENCH, j

. FIVE STUDS STUCK- j

  1. 2 STUD WAS ATTEMPTED SUBSEQUENT TO REMOVING i f53. IT TURNED.0UT 4-5 INCHES' PRIOR TO' .

STICKING. WE DECIDED NOT TO GO FURTHER TO i PREVENT THREAD DAMAGE.- TURNED IT BACK'INTO I PRESENT POSITION.(4 INCHES OUT).

  1. 4, 5, 7 AND 9 ALL STUCK WHEN FIRST,TRIED TO

~

TURN OUT. . LIMITED FORCE WAS APPLIED WITH ')

SLUGGING WRENCH-BUT STUDS WOULD NOT TURN OUT.  !

STUDS'WERE'LEFT IN,STUCKLPOSITION.- {

l

2. OPTIONS EVALUATED .j

~

l . REMOVE STUCK STUBS NOW OR LATER' 'i 1

- CONTACTED WESTINGHOUSE, CE,iB&W TO DETERMINE' 'l REMOVAL. CAPABILITIES.'ALL HAD CAPABILITY, BUT' COULD NOT SUPPORT FALL 1987 OUTAGE. ESTIMATED A SIX MONTH LEAD TIME TO PROCURE FLANGE INSERT. Lj EQUIPMENT. l

~

I l

CONTACTED OTHER PLANTS TO DETERMIFE HISTORY OR SIMILAR OCCURRENCES.- OTHERS HAVE HAD' STUCK

  • STUDS. SOME HAVE CUT THEM OUT WITH SUCCESS.

SOME HAVE OR ARE OPERATING WITH STUCK STUDS

. ACTION TO. PREVENT ADDITIONAL STUCK STUDS DURING REFUEL III- ~I

- OBTAINED WESTINGHOUSE,,CE' SUPPORT TO' DETERMINE ROOT CAUSE AND CORRECTIVE' ACTIONS.NEEDED. ,

DECISION TO ADD; CLEANING; REPAIR ACTIVITY TO.

CRITICAL PATH SCHEDULE.

-- CLEANED, CAGED, TAPPED -AND.DLESSED STUD HOLES.- h

3 d

f

. .. v .

e-

.1 g- . - ~ III,.eROOT CAUSE -~~-- -- - - M " -"- *M i

i

, A. LUBRICANT l

DETERMINED TO BE EXCESSIVE. l l

B. TIGHT TIT I

1. GO-GAGE WAS NOT COMPLETELY EMPLOYED DURING CONSTRUCTION' E TO ELIMINATE FUTURE BINDING PROBLEMS. "

)

2. GO-GAGE WAS NOT VERIFIED DURING REFUEL I' OPERATIONS TO l ENSURE TOLERANCE. I

( <

C. INSTALLATION j INSTALLATION /kEMOVAL METHOD RESULTED IN TOO MUCH WEIGHT BEING APPLIED TO THE THREADS WHILE INSERTING. STUD IN

. HOLE.

I D. CLEANING  ;

CURRENT INSPECTION / TESTING WITH GO-GAGE INDICATED (HREAD

~

LUBRICANT WAS BAKED 0N:AND WASN'T BEING REMOVED DDRING CLEANING PROCESS.

i

>\

1 1 4

,t d >

. w.. . . ... . .. ._

IV. . CORRECTIVE ACTION

)

A. LUBRICANT- j

]

LESS LUBRICANT EMPLOYED FOR FUTURE OPERATIONS. -]

1 B. TIGHT FIT CORE WAS'0FFLOADED, REFUELING POOL PUMPED:DOWN,' TEMP 0kARY SHIE 1

. -.~. LDING/

.. . PARTITIONS

. .. BUILT AND.ALL RPV STUD HOLES WERE:-

-_-..x= uma., .w, 1 s

1.- CLEANED.WITH MOTOR-OPERATED WIRE BRUSH.

).!

4

2. VISUAI.LY INSPECTED FOR GALI.ING'AND BURRS...
3. .GO-GAGE TESTED F0h GALLING, BURRS AND FIT ,

' TOLERANCES. J

4. HOLES CHASED WITH TAP TO ENSURE FREE OF INTERFERENCES IF DETERMINED UNACCEPTABLE BY:

CO-GAGE! 1 5.. RPV STUD HOLES WERE FILLED WITH HYDRAZINE.AND .  ;

' DEMIN WATER HIXTURE JUST PRIOR TO PLUGGING.'AND , 4 FLOOD UP FOR CONTINUING REFUELINGj0PERATIONS.- 'J

6. ENSURED RPV HEAD' FLANGE HOLES WERELCLEAN TO ELIMINATE ANY THREAD DEBRIS' ACCUMULATION DURING' STUD INSERTION..
7. - REMOVED L 1j THREADLOF RPV FLANGE HOLE (N3)-

h

'(50.59 EVALUATION ~ ALLOWED 6.3; THREADS TO.BE-. M REMOVED). .

C. INSTALLATION MORE PRECISION VEIGHT-SCALES WEkE PROCURED'TO: ENSURE STUD' IS NOT LOWERED ONTO FLANGE THREADS UNTIL STUD IS.. '*

COMPLETELY LOWERED INTO HOLE.

D. CLEANING STUDS, NUTS AND HOLES CLEANED WITH WIRE' BRUSH AND.  !

VERIFIED ACCEPTABLE WITH G0/NO-GO' GAGE. ,

1

'E. REMOVAL'0F $ TUCK RPV STUDS j

1 . .

q THE 5 STUCK RPV STUDS WILL-BE REMOVED DURING: REFUEL III'.- 1 THIS WILL ALLOW PROCUREMENT'0F INSERTS-AND DEDICATION'0F' COMMERCIAL RESOURCES TO PERFORM THE~ TASK.-

F. SAFETY EVALUATION ON RPV STUD / FLANGE BORIC ACID. EXPOSURE. >

50.59 EVALUATION PERFORMED..

'. .'( 5-i r

.I- .a ; , q'

. c a

i V. ACTION TO PREVENT RECURRENCE A. MOR'E PRECISE WEIGHT SCALE FOR. STUD INSERTION / REMOVAL.WILL BE UTILIZED. .;

B. CO/NO-GO GAGE WILL BE UTILIZED TO VERIFY TOLERANCES OF STUDS..

NUTS AND RPV FLANGE HOLES.

C. HYDRAZINE-DEMIN WATER WILL BE UTILIZED TO FILL RPV FLANGE:

HOLES PRIOR TO PLUGGING AND SUBSEQUENT FLOOD UP OF THE.  ;

REFUELING POOL. i i

I I

VI. CURRENT FLANS A. CALLAWAY MODIFICATION PACKAGE '(DESIGN CHANGE)'OEVELOPED.TO ALLOW VESSEL TENSION WITH 53 STUDS.

B. TECHNICAL SPECIFICATION INTERPRETATION THAT " FULLY TENSIONED" REFERS TO THOSE STUDS REQUIRED TO BE TENSIONED TO HEET THE DESIGN.