ML20245D959

From kanterella
Revision as of 18:49, 16 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Environ Operating Rept for 1988 (Nonradiological)
ML20245D959
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/31/1988
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905010247
Download: ML20245D959 (3)


Text

._. . _ _ - _ _ _

p a:

' A1 .. - ..

I? .i p...

i ALABAMA POWER COMPANY

JOSEPH M. FARLEY. NUCLEAR PLANT - UNITS 1 AND.2 NRC DOCKET NOS. 50-348-AND 50-364 i

FACILITY OPERATING LICENSE NOS. NPF-2 AND NPF-8 j C .i II '

ANNUAL ENVIRONMENTAL OPERATING REPORT FOR 1988 (NONRADIOLOGICAL) i I

i i

m. -l l

l i

l

-1 i

3f25 )

^ '

8905010247 881231

' PDR .ADOCK 05000348 R FDC /[/(,

)

L I

1.  ?

.}

JOSEPH M. FARLEY NUCLEAR PLANT - UNITS 1 AND 2 ANNUAL ENVIRONMENTAL OPERATING' REPORT FOR 1988 (NONRADIOLOGICAL)

INTRODUCTION' In accordance~~with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan (Units 1 and 2), Appendix 8 to Facility Operating License Nos. NPF-2 and NPF-8, this report is submitted summarizing implementation of the Environmental Protection Plan for the calendar year 1988.

REPORTING REQUIREMENTS A. Summaries and Analyses of the Results of the Environmental Protection Activities Required by Subsection 4.2 of the Environmental Protection Plan for the Report Period There are no reporting requirements per Subsection 4.2 for the calendar year 1988.

B. Assessment of the Observed Impacts of Plant Operation on the Environment There was no significant adverse environmental impact associated with plant operation during 1988.

C. Environmental Protection Plan (EPP) Noncompliancos Tnd Corrective Actions There were no EPP noncompliance during 1988.

D. Changes in Station Design or Operation, Tests, and Experiments Made in Accordance with EPP Subsection 3.1 which Involved a Potentially Significant Unreviewed Environmental Issue There were no changes in station design or operation, tests, or experiments during 1988 which involved a potentially significant unreviewed environmental question.

E. Nonroutine Reports Submitted in Accordance with EPP Subsection 5.4.2 There were no nonroutine reports submitted during 1988.

I L_________-_.

[ Alabama Power Cornpany 40 inverret Center Parkway 4,A Post OGce Box 1295 Pgrmingharn, Alabama 35201 ~

Telephone 205 SG8 5086 m

J. D. Woodard AlabamaPower Vice Presrdent-Nuclear Fatley Proyect ' the southern doctnc system April 25,1989 Docket Nos. 50-348 50-364 U. S. Nuclear Reg'ulatory Commission 1 Attention: Document Control Desk Washington,'D. C. 20555 Joseph M. Farley Nuclear Plant - Units 1 and 2 1988 Annual Environmental Operatina Report (Nonradioloaical)

Gentlemen:

Enclosed in accordance with Subsection 5.4.1 of the Joseph M. Farley Nuclear Plant Environmental Protection Plan (Units 1 and 2), Appendix B to Facility Operating License Nos. NPF-2 and NPF-8, is the report summarizing implementation of the Environmental Protection Plan during-the calendar year 1988.

Should you have any questions or comments, please advise.

Sincerely,

/

J. . ,

00 ard JDW/ JAM Enclosure l 1 cc: Mr. S. D. Ebneter (w/ enclosure)

Mr. E. A. Reeves (w/ enclosure)

Mr. G. F. Maxwell (w/ enclosure) l i