Category:CONSTRUCTION PERMITS-APPLICATION & AMENDMENTS TO APP
MONTHYEARML20237H0761987-08-13013 August 1987 Application for Amend to CPPR-107,extending Earliest & Latest Completion Dates to 890501 & 920101,respectively ML20080U3431984-02-27027 February 1984 Application for Amend to CPPR-106 & CPPR-107.Certificate of Svc Encl ML20050B8081982-04-0101 April 1982 Amend 30 to Licenses CPPR-16 & CPPR-17 Consisting of Revised Plant Security Personnel Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21) 1987-08-13
[Table view] Category:CONSTRUCTION PERMITS-APPLICATION TO AMEND EXISTING CP
MONTHYEARML20237H0761987-08-13013 August 1987 Application for Amend to CPPR-107,extending Earliest & Latest Completion Dates to 890501 & 920101,respectively ML20080U3431984-02-27027 February 1984 Application for Amend to CPPR-106 & CPPR-107.Certificate of Svc Encl ML20050B8081982-04-0101 April 1982 Amend 30 to Licenses CPPR-16 & CPPR-17 Consisting of Revised Plant Security Personnel Training & Qualification Plan.Plan Withheld (Ref 10CFR73.21) 1987-08-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20247M6891998-05-14014 May 1998 Amend 128 to License NPF-39,documenting NRC Staff Approval of Implementation of Plant Mod to Support Installation of Replacement Suction Strainers for ECCS at Plant,Unit 1 ML20217Q5001998-05-0404 May 1998 Amend 127 to License NPF-39,revising Minimal Critical Power Ratio Safety Limits for Operation Cycle 8 ML20217M0731998-03-31031 March 1998 Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively, Revising LGS Units 1 & 2 TS Section 4.0.5 & Bases Sections B 3/4.4.8 Re Surveillance Requirements Associated W/Isi & IST ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line 1999-09-27
[Table view] |
Text
~
I I
UNITED STATES OF AMERICA 1 NUCLEAR REGULATORY COMMISSION In the Matter of :
PHILADELPHIA ELECTRIC COMPANY :
(Limerick Generating Station :
Unit 2) :
APPLICATION FOR EXTENSION OF CONSTRUCTION PERMIT COMPLETION DATES On June 19, 1974, the Atomic Energy Commission issued Construction Permits Nos. CPPR 106 and CPPR 10'i to Philadelphia i
Electric Company (" Applicant") for its Limerick Generating Station Units 1 and 2. On May 13, 1975, the Nuclear Regulatory Commission (" Commission") issued an order extending, inter alia, the latest construction completion dates for Unit 1 to April 1, 1981, and for Unit 2 to April 1, 1982. On April 24, 1981, the Commission issued an order further extending the latest construction completion date for Limerick Unit 1 to October 1, 1985 and for Limerick Unit 2 to October 1, 1987. On October 26, 1984 the Commission issued a low power operating license for Limerick Unit 1 and, on Augus+ 8, 1985 issued a full power operating license for Unit 1.
8708170042 870813 PDR ADOCK 05000353 A PDR
Philadelphia Electric Company hereby requests-that, pursuant to Section 185 of the Atomic Energy Act of 1954, as amended, and the Code of Federal Regulations, Title 10, Part 50, Section 50.55, the earliest and latest conpletion dates specified in Construction Permit No. CPPR-107 for Limerick Unit 2 be extended to May 1, 1989 and January 1, 1992, respectively.
The change in the schedule for completion of the construction of Unit 2 results from suspension of construction '
by Applicant in accordance with the terms of an order issued by the Pennsylvania Public Utility Commission (PaPUC) on December 23, 1983. Such order directed the Applicant to: (1) suspend construction of Unit 2 pending operation of Unit 1; or (2) cancel Unit 2 or (3) continue construction of Unit 2 solely with internally generated funding. Applicant advised the PaPUC on January 24, 1984 that of the choices available, it had suspended construction of Unit 2 pending operation of Unit 1.
As a result of this action all activities at the Unit 2 construction site were suspended during the period from January 1, 1984 to February 1, 1986 except essential activities required to protect the site, the public and workers and actions required to allow a prompt resumption of construction.
The PaPUC's order of December 23, 1983 and the subsequent suspension of construction of Unit 2 resulted from an order
4 t.- .
entered by the PaPUC on October 10, 1980, which initiated an investigation into the need for and the economy of the Limerick facility. At the conclusion of this investigation, the PaPUC issued an Opinion and Order on August 27, 1982 that concluded that either cancellation or suspension of construction at Limerick Unit 2 would be in the public interest. Applicant appealed such opinion and Order. After the affirmation of the August 27, 1982 order by the Pennsylvania Supreme Court, the PaPUC entered a further order on June 10, 1983 which required Applicant to comply with its Order of August 27, 1982.
On July 21, 1983 Applicant filed a response to the PaPUC Order which resulted in a series of replies in opposition by several parties, following which the PaPUC entered its December 23, 1983 Opinion and Order discussed above. On January 24, 1984 Applicant filed its response to the PaPUC Order dated December 23, 1983 in which it advised the PaPUC that Applicant had suspended construction of Limerick Unit 2 pending operation of Limerick Unit 1. Thus, by January 1984, essentially all construction activity at Limerick Unit 2 had been suspended.
In an Order entered February 22, 1984 the PaPUC accepted he Applicant's response as being in compliance with the PaPUC Orders of August 27, 1982, June 10, 1983 and December 23, ivoa.
On August 7, 1984, with construction of Unit 2 still suspended, the PaPUC commenced a further investigation of
l I
I Limerick by issuing an Order to Show Cause why the completion of Limerick Nuclear Generating Station Unit 2 would be in the public interest. Following this investigation, the PaPUC entered an Opinion and Order dated December 5, 1985 finding that completion of Limerick Unit 2 is in the public interest if he Applicant accepted certain cost-containment and operation incentive plans set forth in the PaPUC's Opinion and Order. On December 23, 1985, Applicant notified the PaPUC of its plan to complete Limerick Unit 2 and its acceptance of the PaPUC's cost containment and operation incentive programs. On January 2, and 6, 1986, two parties to the PaPUC proceeding filed petitions for review with the Pennsylvania Commonwealth Court challenging the PAPUC Order. On January 17, 1986, the Applicant filed its own petition for review in the nature of a cross-appeal seeking certain modifications of the PaPUC's Order in the event that one or more of the positions of the opposing parties should prevail. On February 18, 1987, the Commonwealth Court affirmed the December 5, 1985 Opinion and Order of the PaPUC in all respects.
On February 1, 1987 Limerick Unit 1 was declared to be in commercial operation and construction of Limerick Unit 2 was resumed later in that month and is continuing. At the time of suspension of construction activities in January, 1984 Unit 2 construction was approximately 30 percent complete and
~
t engineering activity was approximately 82.5 percent complete.
Since the resumption of work on Unit 2, engineering has progressed to the point where it is, as of June, 1987 ]
approximately 91 percent complete and construction activities are approximately 62 percent complete. j 1
The events described above relating to suspension of construction have resulted from conditions which were beyond 1
the control of Applicant and could not have been predicted at the time the construction schedule upon which the present construction completion date of CPPR-107 was established. The completion dates proposed by Applicant are considered reasonable based upon Applicant's present schedule of engineering and construction activities, progress in these areas since resumption of work on Unit 2, and take into account the uncertainties involved in a major construction effort of this type.
This application does not involve any significant hazards ;
l consideration. The grant of the requested extension will result in no substantive change because the design of the facility and construction methods will be the same as provided for in the existing construction permit. The amendment will merely grant the applicant more time to complete construction in accordance with the previously approved construction permit. Texas Utilities Electric Company (Comanche Peak Steam
1 1
Electric Station, Unit 1), CLI-86-4, 23 NRC 113, 121 (1986).
Also, the proposed action does not involve any new l
significant environmental impacts. The environmental impacts l
associated with the construction of Limerick Unit 2 have been previously discussed and evaluated in the Final Environmental L Statement for Limerick Units 1 and 2 (November 1973), as amended. The proposed extension will not allow any work to be ]
l \
l performed that is not already allowed by the existing I construction permit. There are no radiological impacts associated with this action. Continuing construction does not i l
involve non-radiological impacts different from or significantly greater than those previously evaluated. In
. conclusion, the proposed action will not have a significant impact on the environment.
In view of the foregoing, it is requested that the Commission extend the dates for completion of construction of Limerick Unit 2 as set forth above.
Respectfully submitted, PHILADELPHIA ELECTRIC COMPANY By-- , f8C /d,L_ ~
h Schlor Vice President l
i
COMMONWEALTH OF PENNSYLVANIA :
- ss.
COUNTY OF PHILADELPHIA :
J.S. Kemper, being first duly sworn, desposes and says:
That he is Senior Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Application and knows the contents thereof; and that the statements and matters set forth therein are true and correct i
to the best of his knowledge, information and belief. )
$/f /d/'
r
/
I Subscribed and sworn to yn bef ore me this / ~~~ U day