ML20066B900
ML20066B900 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 11/01/1982 |
From: | Rausch T COMMONWEALTH EDISON CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
Shared Package | |
ML20066B902 | List: |
References | |
5364N, NUDOCS 8211090240 | |
Download: ML20066B900 (2) | |
Similar Documents at Quad Cities | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARSVP-99-182, Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A1999-10-12012 October 1999
[Table view]Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A SVP-99-127, Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs1999-07-16016 July 1999 Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability1999-06-29029 June 1999 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months1999-03-30030 March 1999 Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable SVP-99-003, Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process1999-01-21021 January 1999 Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process SVP-98-355, Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days1998-11-30030 November 1998 Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days ML20151X2491998-09-0909 September 1998 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Consent of NRC for Indirect Transfer of Control of Midamerican Energy Co SVP-98-291, Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.61998-08-31031 August 1998 Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.6 SVP-98-252, Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C1998-07-31031 July 1998 Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C ML20196G0161997-05-0101 May 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3231997-04-29029 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Permitting Loading of ATRIUM-9B Fuel in Plant Unit 2 Core for Operational Modes 3,4 & 5 ML20138B3161997-04-21021 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Cycle 15 Operation Scheduled to Begin 970519 ML20137G3801997-03-26026 March 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting to Reconcile Discrepancy in Free Volume for Secondary Containment ML20135F7161997-03-0303 March 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Bases for TS 3/4.9.E to Clarify Purpose of SR 4.9.E ML20138L3641997-02-17017 February 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Correction of Error in Surveillance Requirement 4.9.A.8.h Re Diesel Generator Endurance Test ML17187A7971997-02-17017 February 1997 Application for Amend to Licenses DPR-19 & DPR-25,App A,Tss, Section 3/4.7.K, Suppression Chamber & Section 3/4.8, Ultimate Heat Sink, to Address Issues Re Efforts to Reconstitute Design Basis of Containment Heat Removal Sys ML20113A7761996-06-10010 June 1996 Application for Amends to Licenses DPR-29 & DPR-30,to Reflect Transition of Fuel Supplier from GE to Spc. Nonproprietary EMF-94-219(NP) & Proprietary EMF-94-219(P) encl.EMF-94-219(P) Withheld Per 10CFR2.790 ML20098A3451995-09-20020 September 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising TS Upgrade Program & Improving Plant Submittals ML20082H7181995-04-10010 April 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising SR for HPCI & RCIC Sys ML20080K8021995-02-23023 February 1995 Application for Amends to Licenses DPR-29 & DPR-30,changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc ML20080J0881995-02-21021 February 1995 Application for Amends to Licenses DPR-29 & DPR-30 Re Changes to Name of Iowa-Illinois Gas & Electric Co,25% co- Owner of Plant,To Reflect Results of Merger Between Electric Company,Midwest Power Sys Inc & Midwest Resources Inc ML20078Q6011994-12-12012 December 1994 Application for Amend to License DPR-29,incorporating Corrections to TS Section 3.4/4.4 Re Standby Liquid Control Sys ML20077A4081994-11-21021 November 1994 Application for Transfer & Amend to Licenses DPR-29 & DPR-30 ML20064J3041994-03-11011 March 1994 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Limiting Conditions of Operation & Surveillance Requirements 3.6.1 & 4.6.1,describing Snubber Visual Insp Intervals & Corrective Actions,Per GL 84-13 & GL 90-09 ML20059K7351994-01-14014 January 1994 Application for Emergency Amend to License DPR-30 for NRC Review & Approval of Two USQs Associated W/Interim Mod on Quad-Cities Station Unit 2,to Resolve Concerns Described in NRC Bulletin 93-003 ML20059A7241993-12-20020 December 1993 Application for Amends to Licenses DPR-29 & DPR-30, Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2 ML20059A8211993-10-21021 October 1993 Application for Amends to Licenses DPR-29 & DPR-30,proposing TS to Delete Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint ML20101R7871992-07-0606 July 1992 Application for Amend to License DPR-29,reflecting Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Calculation, GE-NE-901-013-0491, Quad Cities HPCI Turbine Steam Supply Pressure Low Setpoint Calculation Encl.Rept Withheld ML20096F3941992-04-20020 April 1992 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Deletion of Isolation Functions & Surveillance Requirements for CR Ventilation Sys Chlorine & Sulfur Dioxide Analyzers ML20091C4681992-03-31031 March 1992 Application for Amends to Licenses DPR-29,DPR-30,NPF-11 & NPF-18,changing TS to Include Commed Topical Rept NFSR-0085, & Suppls 1 & 2 to Section 6.6 to Describe Improved Analytical Methods Re Core Operating Limits Rept ML20091L7561992-01-21021 January 1992 Application for Amends to Licenses DPR-29 & DPR-30,changing Spec Ref in TS 3.5.C.2 from 4.5.C.3 to 4.5.C.3.a & in TS 3.5.E.2 from 4.5.E.3 to 4.5.E.3.a,in Regard to HPCI & RCIC Sys ML20086E2271991-11-20020 November 1991 Revised Application for Amends to Licenses DPR-29 & DPR-30, Restoring Various Channel Calibr Frequencies from STS Requirements to Current Requirements Re TS Section 3.1/4.1, Reactor Protection Sys, in Ref to ML20085E6071991-10-11011 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,revising TSs Sections 6.1.G to Reflect Position Title Change, 6.1.G.1.b to Reflect Rev of Approval Authority & Adding Sections 6.11 & 6.12 Re Access to High Radiation Areas ML20085D4301991-10-0707 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program. Existing Tech Specs & Environ Protection Plan (Nonradiological) Encl ML20079H0551991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec Section 1.0, Definitions to Reflect Tech Spec Upgrade Program ML20079H2081991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing Tech Spec Section 6.0, Administrative Controls ML20085C7571991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Sections 3.5/4.5, Core & Containment Cooling Sys & 3.6/4.6, Primary Sys Boundary, as Part of TS Upgrade Program ML20079G0411991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing Current License Conditions Re Fire Protection W/New Tech Spec 3.12/4.12, Fire Protection Sys, Per Generic Ltrs 86-10 & 88-12 ML20079F9871991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing TS to Reflect Util Efforts to Upgrade Existing TS 3.8/4.8, Radioactive Effluents & 3.10/4.10, Refueling ML20079G0921991-09-30030 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing TS to Reflect Effort to Upgrade Existing TS Sections: 3.2/4.2, Protective Instrumentation & 3.9/4.9, Auxiliary Electrical Sys ML20083D3541991-09-24024 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec 4.8.H.2.b(2) to Define Differential Temp Criteria for Control Room Emergency Filtration Sys Header ML20082V2021991-09-17017 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,App a, Reflecting Efforts to Upgrade Existing Tech Specs 3.3/4.3, Reactivity Control ML20082M8551991-08-29029 August 1991 Application for Amends to Licenses DPR-29 & DPR-30,deleting Tech Spec 3.11/4.11, High Energy Piping Integrity (Outside Containment). Mods Completed in 1979 for High Energy Piping ML20082H5011991-08-15015 August 1991 Suppl to 910627 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Sections 1.1/2.1, Fuel Cladding Integrity & 1.2/2.2, RCS Changing 800 Psig to 800 Psia in Specs 1.1.A & 1.1.B ML20082H1881991-08-15015 August 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Section 3.4/4.4, Standby Liquid Control Sys. Tech Spec Upgrade Program Encl ML20085B5851991-07-29029 July 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program & TS Section 5.0, Design Features. Quad Cities Nuclear Power Station Tech Spec Upgrade Program Encl ML20076D8771991-07-23023 July 1991 Application for Amends to Licenses DPR-29 & DPR-30, Upgrading Tech Specs Section 3.1/4.1, Reactor Protection Sys ML20077G9951991-06-28028 June 1991 Application for Amend to License DPR-30,reflecting Proposed Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Rept GE-NE-901-013-0491,Rev 1, Quad Cities HPCI Turbine Steam Supply... Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 1999-07-16 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARSVP-99-182, Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A1999-10-12012 October 1999
[Table view]Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A SVP-99-127, Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs1999-07-16016 July 1999 Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability1999-06-29029 June 1999 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months1999-03-30030 March 1999 Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable SVP-99-003, Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process1999-01-21021 January 1999 Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process SVP-98-355, Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days1998-11-30030 November 1998 Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days ML20151X2491998-09-0909 September 1998 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Consent of NRC for Indirect Transfer of Control of Midamerican Energy Co SVP-98-291, Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.61998-08-31031 August 1998 Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.6 SVP-98-252, Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C1998-07-31031 July 1998 Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C ML20196G0161997-05-0101 May 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3231997-04-29029 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Permitting Loading of ATRIUM-9B Fuel in Plant Unit 2 Core for Operational Modes 3,4 & 5 ML20138B3161997-04-21021 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Cycle 15 Operation Scheduled to Begin 970519 ML20137G3801997-03-26026 March 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting to Reconcile Discrepancy in Free Volume for Secondary Containment ML20135F7161997-03-0303 March 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Bases for TS 3/4.9.E to Clarify Purpose of SR 4.9.E ML20138L3641997-02-17017 February 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Correction of Error in Surveillance Requirement 4.9.A.8.h Re Diesel Generator Endurance Test ML17187A7971997-02-17017 February 1997 Application for Amend to Licenses DPR-19 & DPR-25,App A,Tss, Section 3/4.7.K, Suppression Chamber & Section 3/4.8, Ultimate Heat Sink, to Address Issues Re Efforts to Reconstitute Design Basis of Containment Heat Removal Sys ML20113A7761996-06-10010 June 1996 Application for Amends to Licenses DPR-29 & DPR-30,to Reflect Transition of Fuel Supplier from GE to Spc. Nonproprietary EMF-94-219(NP) & Proprietary EMF-94-219(P) encl.EMF-94-219(P) Withheld Per 10CFR2.790 ML20098A3451995-09-20020 September 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising TS Upgrade Program & Improving Plant Submittals ML20082H7181995-04-10010 April 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising SR for HPCI & RCIC Sys ML20080K8021995-02-23023 February 1995 Application for Amends to Licenses DPR-29 & DPR-30,changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc ML20080J0881995-02-21021 February 1995 Application for Amends to Licenses DPR-29 & DPR-30 Re Changes to Name of Iowa-Illinois Gas & Electric Co,25% co- Owner of Plant,To Reflect Results of Merger Between Electric Company,Midwest Power Sys Inc & Midwest Resources Inc ML20078Q6011994-12-12012 December 1994 Application for Amend to License DPR-29,incorporating Corrections to TS Section 3.4/4.4 Re Standby Liquid Control Sys ML20077A4081994-11-21021 November 1994 Application for Transfer & Amend to Licenses DPR-29 & DPR-30 ML20064J3041994-03-11011 March 1994 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Limiting Conditions of Operation & Surveillance Requirements 3.6.1 & 4.6.1,describing Snubber Visual Insp Intervals & Corrective Actions,Per GL 84-13 & GL 90-09 ML20059K7351994-01-14014 January 1994 Application for Emergency Amend to License DPR-30 for NRC Review & Approval of Two USQs Associated W/Interim Mod on Quad-Cities Station Unit 2,to Resolve Concerns Described in NRC Bulletin 93-003 ML20059A7241993-12-20020 December 1993 Application for Amends to Licenses DPR-29 & DPR-30, Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2 ML20059A8211993-10-21021 October 1993 Application for Amends to Licenses DPR-29 & DPR-30,proposing TS to Delete Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint ML20101R7871992-07-0606 July 1992 Application for Amend to License DPR-29,reflecting Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Calculation, GE-NE-901-013-0491, Quad Cities HPCI Turbine Steam Supply Pressure Low Setpoint Calculation Encl.Rept Withheld ML20096F3941992-04-20020 April 1992 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Deletion of Isolation Functions & Surveillance Requirements for CR Ventilation Sys Chlorine & Sulfur Dioxide Analyzers ML20091C4681992-03-31031 March 1992 Application for Amends to Licenses DPR-29,DPR-30,NPF-11 & NPF-18,changing TS to Include Commed Topical Rept NFSR-0085, & Suppls 1 & 2 to Section 6.6 to Describe Improved Analytical Methods Re Core Operating Limits Rept ML20091L7561992-01-21021 January 1992 Application for Amends to Licenses DPR-29 & DPR-30,changing Spec Ref in TS 3.5.C.2 from 4.5.C.3 to 4.5.C.3.a & in TS 3.5.E.2 from 4.5.E.3 to 4.5.E.3.a,in Regard to HPCI & RCIC Sys ML20086E2271991-11-20020 November 1991 Revised Application for Amends to Licenses DPR-29 & DPR-30, Restoring Various Channel Calibr Frequencies from STS Requirements to Current Requirements Re TS Section 3.1/4.1, Reactor Protection Sys, in Ref to ML20085E6071991-10-11011 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,revising TSs Sections 6.1.G to Reflect Position Title Change, 6.1.G.1.b to Reflect Rev of Approval Authority & Adding Sections 6.11 & 6.12 Re Access to High Radiation Areas ML20085D4301991-10-0707 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program. Existing Tech Specs & Environ Protection Plan (Nonradiological) Encl ML20079H0551991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec Section 1.0, Definitions to Reflect Tech Spec Upgrade Program ML20079H2081991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing Tech Spec Section 6.0, Administrative Controls ML20085C7571991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Sections 3.5/4.5, Core & Containment Cooling Sys & 3.6/4.6, Primary Sys Boundary, as Part of TS Upgrade Program ML20079G0411991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing Current License Conditions Re Fire Protection W/New Tech Spec 3.12/4.12, Fire Protection Sys, Per Generic Ltrs 86-10 & 88-12 ML20079F9871991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing TS to Reflect Util Efforts to Upgrade Existing TS 3.8/4.8, Radioactive Effluents & 3.10/4.10, Refueling ML20079G0921991-09-30030 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing TS to Reflect Effort to Upgrade Existing TS Sections: 3.2/4.2, Protective Instrumentation & 3.9/4.9, Auxiliary Electrical Sys ML20083D3541991-09-24024 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec 4.8.H.2.b(2) to Define Differential Temp Criteria for Control Room Emergency Filtration Sys Header ML20082V2021991-09-17017 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,App a, Reflecting Efforts to Upgrade Existing Tech Specs 3.3/4.3, Reactivity Control ML20082M8551991-08-29029 August 1991 Application for Amends to Licenses DPR-29 & DPR-30,deleting Tech Spec 3.11/4.11, High Energy Piping Integrity (Outside Containment). Mods Completed in 1979 for High Energy Piping ML20082H5011991-08-15015 August 1991 Suppl to 910627 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Sections 1.1/2.1, Fuel Cladding Integrity & 1.2/2.2, RCS Changing 800 Psig to 800 Psia in Specs 1.1.A & 1.1.B ML20082H1881991-08-15015 August 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Section 3.4/4.4, Standby Liquid Control Sys. Tech Spec Upgrade Program Encl ML20085B5851991-07-29029 July 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program & TS Section 5.0, Design Features. Quad Cities Nuclear Power Station Tech Spec Upgrade Program Encl ML20076D8771991-07-23023 July 1991 Application for Amends to Licenses DPR-29 & DPR-30, Upgrading Tech Specs Section 3.1/4.1, Reactor Protection Sys ML20077G9951991-06-28028 June 1991 Application for Amend to License DPR-30,reflecting Proposed Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Rept GE-NE-901-013-0491,Rev 1, Quad Cities HPCI Turbine Steam Supply... Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 1999-07-16 |
Text
- [N Commonwe:lth Edison
[ ) One First fationil PLiza Chicago, Illinois
! k7 ) hddress R* ply to: Post Oifice Box 767 *
,/ Chicago, Illinois 60690 November 1, 1982 Mr. Harold R. De n to n , Directo r Of fice o f Nuclear Reactor Regulhtion U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Units 1 and 2 Proposed Amendment to DPR-29 and DPR-30 Technical Specifications Concerning Containment Oxygen Content NRC Docket Nos. 50-254 and 50-265 Re ference (a): T. J. Rausch letter to D. G. Eisenhut dated September 15, 1982.
Dear Mr. Denton:
Pursuant to 10 CFR 50.59, Commonwealth Edison proposes to amend Appendix A, Technical Specification to Quad Cities Station Units 1 and 2 Operating Licenses DPR-29 and OPR-30. The requested change will require drywell oxygen concentrations to be maintained below 4% by volume; current Quad Cities Technical Specifications require 5% by weight (approximtely 4.4% by volume) . ,
This amendment is requested to maintain consistency between the Technical Spec:fications and the analyses submitted in Reference (a), wherein we concluded that the Quad Cities units rely on nitrogen inerting, not' purge /repressurization as the primary means of combus-tible gas control.
At tachment A to this letter provides the change requested.
These changes have received On-Site review and approval and are currently undergoing Of f-Site review.
The change to 4% by volume oxygen concentration is in the conservative direction and can only increase margins of plant safety.
So as to minimize the impact this change has on unit power operation, specification 3.7. A.5.6 is also being changeo to allow additional 2C4)g time from when the mode switch is placed in run and the time at which j *
, 4% must be achieved. It must be emphasized that the time required to reach a given oxygen concentration greatly increases as the VY desired concentration decreases, and that in fact, the unit normally b
0 operates well below the limit.
'4$0 0 In accordance with 10 CFR 170, we have determined that this request consists of a combined Class I and Class III amendment.
Accordingly, a f ee remittance o f $4,400 is enclosed.
~
1 ')
l7821' PDR ADOCK P
090240 821101 05000254 PDR i
H. R. Denton -
2- November 1, 1982 Please address any questions you may have concerning this matter to this_ office.
Three (3) signed originals and thirty-seven copies o f this transmittal are provided for your use.
Very truly yours, h/
Thoma s J. Raus ch W
i4Jclear Licensing Administrator 1m cc: Region III Inspector - Quad Cities SUBSCRIBED and SWORN to befoge me this /td. day of UA a p e fr/ D , 1982 ussh bj$! O_ -
No tary Public l
5364N 1
I 4
.e n- - - - -, ,e e , ,- - - ,- - - - , m -
. , - . -, e