Finding | |
---|---|
Title | Failure to Identify and Correct a Deficient CCW Penetration Seal Configuration that Exacerbates External Piping Corrosion Conditions |
Description | A NRC-identified NCV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified for the licensees failure to promptly identify and correct an adverse condition to quality that led to continued corrosion and significant scaling and pitting of the Unit 4 component cooling water (CCW) 18-inch headers at the penetration seals from the CCW heat exchanger room to the 10-foot pipeway. This issue was entered into the licensees CAP as ARs 2217942, 2227877, 2211843, 2236687, and 2239632. Corrective actions included removing protective boots that were inappropriately installed and not in accordance with design drawings and work order instructions, and were collecting hypersaline water that wetted carbon steel piping.The performance deficiency was determined to be more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the reliability of systems that respond to initiating events to prevent undesirable consequences because corrosion and pipe wastage was ongoing and unmonitored for the Unit 4 CCW headers. In accordance with IMC 0609 Appendix A, The Significance Determination Process for Findings At-Power, the inspectors determined the finding to be of very low safety significance because it did not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant in accordance with the licensees maintenance rule program for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The finding had a cross-cutting aspect in the area of Problem Identification and Resolution, Identification, because the licensee failed to identify the adverse condition that allowed corrosion to continue unmonitored [P.1]. |
Site: | Turkey Point |
---|---|
Report | IR 05000251/2017004 Section 4OA2 |
Date counted | Dec 31, 2017 (2017Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Orr J Reyes A Butcavage P Capehart M Donithan W Loo J Panfel J Rivera T Stephen L Suggs |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XVI |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |