Title | Inadequate Maintenance Rule (a)(4) Risk Assessment for the High Head Safety Injection Pumps |
Description | An NRC-identified NCV of 10 CFR 50.65, Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, paragraph (a)(4), was identified for the licensees failure to adequately assess and manage the Unit 3 and Unit 4 online risk associated with taking both Unit 4 high head safety injection (HHSI) pumps out of service. This issue was entered in the licensees corrective action program as AR 2193584. Corrective actions completed included providing additional training to senior reactor operators (SROs) on the maintenance rule (a)(4) implementation procedure and the definition of unavailability as used in maintenance rule (a)(4) risk assessments. The licensees failure to adequately assess and manage the Unit 3 and Unit 4 online risk associated with taking both Unit 4 HHSI pumps out of service, as required by 0-ADM-225, On Line Risk Assessment and Management, was a performance deficiency. The performance deficiency was more than minor because it adversely affected the equipment performance attribute of the Mitigating Systems Cornerstone. The significance of the finding was determined using IMC 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significant Determination Process. The finding was determined to be of very low safety significance (Green) because the incremental core damage probability deficit for the timeframe the HHSI pumps were unavailable was less than 1E-6 for each unit, prior to, and after, the failure of the Unit 3A 4kV switchgear bus. The finding had a cross-cutting aspect in the area of Human Performance, Training, because the control room SROs did not have an adequate understanding regarding crediting operator actions and the definition of unavailability. The SROs incorrectly considered the Unit 4 HHSI pumps as available to perform their safety functions under the maintenance rule (a)(4) risk assessments [H.9]. |
Site: | Turkey Point |
---|---|
Report | IR 05000250/2017003 Section 1R13 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | J Orr J Reyes R Carrion D Hardage J Nadel P Capehart L Suggs |
Violation of: | 10 CFR 50.65 |
CCA | H.12, Avoid Complacency |
INPO aspect | QA.4 |
' | |