05000275/FIN-2009003-06

From kanterella
Revision as of 19:48, 20 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
06
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2009003 Section 4OA5
Date counted Jun 30, 2009 (2009Q2)
Type: TEV: Severity level IV
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure:
Inspectors (proximate) G Guerra
M Brown
M Peck
V Gaddy
CCA P.2, Evaluation
INPO aspect PI.2
'