ML20206E313

From kanterella
Revision as of 09:20, 11 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Draft Attachment 1 to Facility Full Power License. Item 1 Only Deferred Test Remaining from Preoperational Test Program,Item 2 Identical to Item 2a of Low Power License & Item 2 Rewritten for Clarity
ML20206E313
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/08/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bernero R
Office of Nuclear Reactor Regulation
References
NUDOCS 8704130577
Download: ML20206E313 (2)


Text

r e

cwo u

4 APR e 1987 MEMORANDUM FOR: Robert M. Bernaro, Director, Division of BWR Licensing Office of Nuclear Reactor FROM: Charles E. Norelius, Director, Division'of Reactor Projects

SUBJECT:

ATTACHMENT 1 TO CLINTON FULL POWER Attached is a draft of Attachment 1 to the Clinton full power license.

Item 1 is the only deferred test remaining from the preoperational test program.

Item 2 is the same as item 2a of the low power license and has been rewritten to improve clarity.

ORIGINAL SIGNED BY C. E. NORM.m" Charles E. Norelius, Director Division of Reactor Projects

Attachment:

Attachment 1 to Clinton License cc w/ attachment:

A. B. Davis E. G. Greenman SRI Clinton Y='7 (jd RIII RIII RIII et,s fl/RIII RIII RII p v\

/

  1. A f p q Knop /jp k Tnell Chrissotimos -lus W6(L 7 ,$pi 7 O 4hT[1 G704130577 8704cg +

DR ADOCK 05000461 PDR

9 o

Attachment 1 to NPF-Prior to achieving the milestone indicated, the following items shall be completed to the satisfaction of Region III.

1.

Preoperational test PTP-FH, Fuel Handling System, shall be completed prior to off loading irradiated fuel.

2. IP shall resolve audibility problems encountered on evacuation of l personnel in high noise areas in accordance with IP letter dated July 8, 1986. A survey of high noise areas shall be completed within 30 days after achieving maximum anticipated noise level. All corrective actions required by the survey shall be completed prior to the completion

! of first refueling outage. In the interim for those areas which are identified as having deficient siren audibility, temporary administrative measures required. will be taken to ensure that these areas are evacuated as

{

1