Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam Administered on 980901
ML20154J927
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/13/1998
From: Bies M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9810160040
Download: ML20154J927 (322)


Text

{{#Wiki_filter:.. _ .- _ . _ .. . . . _ - - . . _ - UNITED STATES s** 570u9'e NUCLEAR REGULATORY COMMISSION 8 o REGION til

   #           j
  • 801 WARRENVILLE ROAD c LISLE. ILLINOIS 60532-4351
   \,...../

October 13,1998 NOTE TO: NRC Document Control Desk Mail Stop 0-5-D-24 FROM: Mary Ann Bies, Licensing Assistant a ,, Operating Licensing Branch, Rill

SUBJECT:

OPERATOR UCENSING RETAKE EXAMINATION ADMINISTERED ON SEPTEMBER 1,1998, AT CLINTON POWER STATION, DOCKET NO. 50-461 On September 1,1998, an Operator Licensing Retake Examination was administered at the referenced facility. Attached, you will find the following informatica for processing through NUDOCS and distrioution to the NRC staff, including the NRC PDR: ltem #1 - a) Facility submitted outline and initial exam submittal, designated for distribution under RIDS Code A070. b) As-given operating examination, designated for distribution under RIDS Code A070. ltem #2 - Examination Report with the as-given written examination attached, designated for distribution under RIDS Code IE42. l Attachments: As stated 9810160040 981013 PDR ADOCK 05000461 V PDR 1

FINAL AS-RUN WALKTHROUGH JPMS FOR CLINTON RETAKE EXAM - WEEK OF 08/31/98 1 l

                                             )

l I 9

                                           /

070

ES-301 Individual Walk-through Test Outline Form ES-301-2 Facility- Clinton Date of ExaminaUon: -September 1.1998_ Exam Level (Circle): RO./SRO(l) / SRO(U) Operating Test No.: _98-02 System /JPM Title / Type Codes

  • Safety Planned Follow 41p Questions:

Function K/A/G //Importance// Description 1.202001/ Start RR Pump Ain Slow 1 -Reactivity Cont. a. A2.10-3.9-Seal Failure D,S,L b. K4.17 - 3.5 - Fast Speed Pump Start 2.209002/ManuallyInitiate HPCS 2-Inventory Cont. a. K6.01 - 3.6 - Loss of Electrical Power D, S b. G2.1.14 3.3 Sys. Status Req. Notification

3. 223001/Emerg. S/U Standby DWC 5-Cont. Integrity a. K6.11 - 3.0 - Loss of Electrical Power D, S b. G2.1.12 - 4.0 - Not Qualified Equipment 4,264000/ Manually Start DG 1 A 6-Electrical a. K4.08 - 3.7 - Automatic Startup D,A,S b. G2.1.12 - 4.0 - T.S. Requirements 5.239001/ Equalize Around and Open 3-Pressure Cont. a. A2.03 -4.2 - MSIV Closure -

MSIVs D,S,L b. K4.01 - 3.8 - Automatic isol. of Steam Lines

6. 217000/ Shutdown til-Init. Sig.

4 -Heat Removal a. A2.01 -3.7 -Initiation Signal Clear N, S b. A2.17 - 3.4 - High Suppression Pool Lvt. 7.261000/ Purge PC Using VG 9 - Rad. Release a. K4.01 - 3.8 - Auto System Init. N, S b. K6.04 - 3.1 High Rad. Response

8. 241000/Startup Steam Byp. HPU 3-Pressure Cont. a. A2.01 - 3.7 - Pressum Reg. Failure N,P,R b. A2.03 - 4.2 - Failed Open BPV 9.201005/ Respond to a Failed 7-Instrumentation a. K3.02 3.5-Effect on Reactor S/U Transponder N, P b.K1.06 - 3.3 - Bypassed Rod in Gang .

10.400000/ Respond to Abn. Levelin 8- Plant Service a. K3.01 - 3.3 Loads Cooled by CCW CCW Exp. Tk. N,P,R b. A2.01 - 3.4 - Loss of CCW Pump

  • -Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)liemate path, (C)ontrol room, (S)imulator, (L)o[

Power,(P)lant,(R)CA (W*/ E.HA - S/ biff

                                                                       -        .          .   . ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 l TASK TITLE: Start Reactor Recirculation Pumo "A" in Slow Speed l l TASK NUMBER: 011202C004  ! l APPLICABILITY: RO _ SRO X TRAINEE DATE EVALUATOR l METHOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 15 minutes Prepared / Revised by: Date: Reviewed by- Date: Instructor- Operations Approved by: Date: Supervisor- Operations Training i i PaFSIof14

a 1 CLINTON POWER STATION 4 JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Initialize to an IC, similar to IC-5, at approximately 30% power. Shutdown the "A" RR pump by opening the CB1, CB2, CB3 and CB4 breakers and closing the FCV to minimum. Lockout the "A" FCV and restart the "A" RR HPU from the instructor console. Verify the Cavitation Interlock lights on P680 are both ON or both OFF. TASK STANDARDS: Reactor Recirculation Pump "A" is running in slow speed. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAU

REFERENCES:

CPS No. 3302.01, REACTOR RECIRCULATION, section 8.1.1 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: The plant is operating at approximately 30% power in single loop. The "B" loop is operating. The "A" RR pump is stopped and the "A" RR loop is unisolated. The CRS directs you to startup the "A" Recirc Pump in slow speed per section 8.1.1 of CPS 3302.01. START TIME: Page 2 of14 l .

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 l PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. l PERFORMANCE STEPS i JPM TITLE: Start Reactor Recirculation Pump "A" in Slow Speed 8.1.1.1 (Local) Unless checked during drywell close-out, check RR pump motor oil levelsif the drywell is accessible. Reference MS-08.00 for proper RR Pump A(B), IB33 C001 A(B) oil level determination criteria. 1 8.1.1.2 (Local) Verify open 1Cl1-F026A(B), CRD Supp Isol To RR Pump A(B) and verify i

CRD supply to the RR pump seals is 3-5 gpm on flowmeter ICIl-D020A(B). If l required, adjust ICI1-D012A(B), Flow Control Vr.lve to obtain 3-5 gpm. Flow i regulator, ICIl-D012A(B) is used to adjust flow as follows (per K2801-0009)

l [CNMT755' AZM 189*]. a) Loosen locknut and rotate stem until desired flow is attained. (Clockwise for decreasing flow, counter-CW for increasing flow) b) Lock stem in desired position by holding stem steady whil re- , tightening locknut. l STANDARD Directs Area Operator to verify CRD flow to RR p' ump "A" seals at 3-5 gpm. CUE: Flow is 4 gallons per minute. COMMENTS: SAT UNSAT k i l Page 3 of14 i i

     ..                                                                                                              l L                                                CLINTON POWER STATION I
                                                                                                                     )

JOB PERFORMANCE MEASURE WORKSHEET t i JPM NUMBERi NRC 1 REVISION: 0 NOTE When starting pumps at low power / low feed flow conditions, the white light above the Cavitation Interlocks switch will stay on and the pumps will start in slow speed. 8.1.1.3a) Zero the A/B loop SERVO ERROR STANDARD. Adjusts B33-K603A, Recirc Loop A Flow Control, so Servo Erro'r meter indicates 0% on P680

        ~ CUE:

COMMENTS: SAT UNSAT 8.1.1.3 b) Depress following reset buttons to clear interlocks / alarms:

1) FCV A/B MotionInhibit Reset l Verify the lead HPU becomes operational, and FCV motion is longer inhibited. l
2) Pump A/B Vibration Reset. l
3) Cav Intlk A/B Reset / Rx Run Back Reset.  !
4) Low LevelIntik A/B Reset STANDARD.

Depresses "A" Motion Inhibit reset pushbutton and observes WHITE light OFF. Depresses "A" Vibration reset pushbutton. Depresses "A" Cavitation Interlock pushbutton. Depresses "A" Vessel Low Level pushbutton CUE: COMMENTS: Cavitation interlock will not clear when feedwater flow is less than 30%. SAT UNSAT_ Page 4 of14 L

i CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC1 REVISION: 0 l 1 8.1.1.4 Verify RWCU system in operation with flow established through bottom head drain line l to obtain a reliable indication of bottom head drain coolant temperature. STANDARD l 1 Verifies RWCU system in operation with flow established through bottom head drain line. i i CUE: COMMENTS:  ; SAT _ UNSAT l 8.1.1.5 Within 15 min. orior to starting the A(B) RR pump, Verify following ITS SR 3.4.11.3/4 temperature limits and GEK-75635A Thermal Shock limits (use table below for data point locations) are met, and log data in the MCR Journal. a) Difference between bottom head coolant temperature and the RPV coolant temperature is s 100*F. (ITS/GEK) b) Difference between the RPV coolant temperature in the RR loop to be started and the RPV coolant temps.ature is s 50 F. (ITS/GEK) c) Difference between idle RR loop to be started and the other RR loop is s 50 F. (GEK-75635 only: verifies Bkr 5A(SB) Thermal Interlock item satisfied. I Page 5 of14

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC1 REVISION: 0 RPV Coolant Bottom Head RPV Coolant Temperature Coolant Temperature Temperature in the RR i Loop to be Started l MODES 3/4 with RHR SDC in operation: Use RHR Hx inlet temperature from recorder E12-R601 at lH13-P601 MODES 2-4 with RR 1000 in Use Point 4 (Bottom Head Drain Use RR pump suction operation and RHR SDC Temp) on recorder 1B21-R643 temperature for the idle RR loop secured: at lH13-P614, pLr computer from recorder B33-R604 at Use Recirc Pmp A/B Suction points B22DA002/017 (valid lH13-P614. i Temp from B33-R604 at 1H13- when > 214 F). P614. MODES 1-3 with Rx coolant > 1 214*F: Use Steam Dome Temperature computer point B21NA006. l STANDARD Verifies s 100 F difference between bottom head and RPV coolant Verifies s 50 F difference between "A" RR loop and RPV coolant Verifies s 50 F difference between "A" RR loop and other loop CUE: COMMENTS: May simulate logging information in CRO log. SAT UNSAT Page 6 of14

                   ~. _ _ _. _               _ .-       .   . _ _ _ . _ . _.. _. _ . _ _ _ _ . . _ _ . .        __ _ . . . _

r .. CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 8.1.1.6 Verify annunciators 5003-2C/2J, Recirc Pmp A/B Temp Intlk Actuated are extinguished (verifies GEK-75635A Bkr SA(SB) pump start loop to loop thermal interlock in effect) (annunciator only valid when > 214 F.) STANDARD: Verifies annunciators 5003-2C/2J are extinguished.- CUE: COMMENTS: l SAT UNSAT

        '8.1.1.7          Place 1B33-F060A(B), Recirc FCV in minimum open position.

l STANDARD. Verifies "A" Flow Control Valve in minimum open position. CUE: I I COMMENTS: i t SAT UNSAT l l I i~ 2 L Page 7 of14 L

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC1 REVISION: 0 l 8.1.1.8 Verify CRD supply and seal staging flow has been in operation for at least one hour prior to pump start to ensure pump seals are vented. STANDARD: Requests information for CRS CUE: It has been I hour. COMMENTS: SAT UNSAT CAUTION Do not simultaneously start both RR pumps.

        '8.1.1.9      Close the following P680 breakers in order:

l a) Recirc Pump A(B) Mtr Bkr 3A(3B). b) Recirc Pump A(B) Mtr Bkr 4A(4B). STANDARD. Closes 3A then 4A breakers and observes RED light ON for each breaker. CUE:- l COMMENTS: The annunciator RECIRC PMP A MTR BRKR TRIP will clear. '~ SAT UNSAT a I l l Page 8 of14 i l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 NOTE If FW flow is < 30% (~ 3.74 mlbm/hr, then: a) RR pump will accelerate on the 60 cycle source. b) The I A(IB) breaker will close at the same time the SA(5B) breaker closes c) When pump speed is > 95% (1691 rpm), the SA(5B) breaker will close d) When pump speed drops to 20-26% (356 - 463 rpm), the 2A(2B) breaker l will close. If FW flow is > 30% (~ 3.74 mlbm/hr), then RR pump speed will accelerate directly to 100% (1780 rpm). i 8.1.1.10 Notify security that perimeter lighting may go out for ~ 2 to 6 minutes due to the pump start, l STANDARD.

Requests that security be notified.

l CUE: Security has been notified. I COMMENTS: SAT UNSAT l l 4 Page 9 of14

                   -              .          -                .   -    -.        ..               .     - . - ~ - . -

CLINTON POWER STATION l-JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 l 8.1.1.11 Monitor reactor power and RPV water level during the starting of a RR pump.

     '8.1.1.12       Start RR pump A(B) by closing Recirc Pump A(B) Drive Motor Bkr SA(5B).

i STANDARD Closes RR pump "A" 5A breaker and observes RED light ON, pump amps and loop flow increasing. Monitors reactor power and RPV water level during pump start. CUE: COMMENTS: SAT UNSAT 1 8.1.1.13 If RR pump startup was directed from section 8.2.6, Idle RR Loop - restart (step l 8.2.6.6), return to step 8.2.6.7. Otherwise continue in this sec: ion. STANDARD Continues in this section CUE: COMMENTS: i ! SAT UNSAT l t [ l Page 10 of14 I~ l

   . - .                              - - - - -      - - - . _ . . - - . . .     ~ - .   . . - - - - - . . . - . . . .

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 NOTE A 40 sec incomplete sequence timer stans when the CB-5 breaker is closed. If after 40 sec, pump speed is not 20-26% or CB-2 is not shut, the incomplete sequence relay will trip CB-1 & CB-5.

          *8.1.1.14    After the RR pump is in service on the LFMG, open the FCV to full open position.

OK to inhibit FCV motion per CPS No. 3302.02, REACTOR RECIRCULATION FLOW CONTROL HYDRAULIC SYSTEM while in slow speed RR pump operation to prevent inadvertent FCV runbacks. OK to restan RR HPUs per CPS No. 3302.02 after a short shutdown. STANDARD: Opens "A" recirc loop FCV to full open. CUE: COMMENTS: SAT UNSAT l 1 l I l Page11 of14 4

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET ' l JPM NUMBER: NRC1 REVISION: 0 8.1.1.15 Monitor Table 1, RR Pumo Seal Key Parameters. (page 26). If they approach or reach the maximum allowable, corrective action should be taken. STANDARD. As a minimum seal staging pressure, Cooling Water (CCW) temperature, and injection water temperature should be checked. CUE: 1 COMMENTS: SAT UNSAT TERMINATING CUES: Reactor Recirculation Pump "A" is running in slow speed. STOP TIME: l Page 12 of14 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 K/A REFERENCE NUMBERS i Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 2020002 A4.07 3.2 i l l Page 13 of14

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER:'NRC1_ REVISION: 0 QUESTION NO.: 1 _ You are the CRS on shift with the plant operating at near rated conditions for the past several weeks. l The reirc pumps are operating at Fast Speed with the Flow Control Valves at 96 and 92% respectively. i CROA reports the following recirc parameters:

                             "A"                                                  "B" Seal 1 dP                1020 psig                                           1015 psig Seal 2 dP                 510 psig                                            500 psig Seal I cavity             110 F                                               110 F                                 ;

Seal 2 cavity 125*F 125*F Four hours later, the CROA reports the following:

                             "A"                                                  "B" Seal 1 dP                1020 psig                                           1015 psig Seal 2 dP                 510 psig                                            500 psig Seal I cavity             115*F                                                112*F Seal 2 cavity             125*F                                                125 F What action should be taken by the operating crew?

ANSWER: l Direct NSED to prepare an evaluation to determine if continued plant operation is warranted. REFERENCE (S): CPS No. 3302.01 Step 8.3.1.5 CPS No. 3302.01 Table 1

RESPONSE

l l l l SAT UNSAT i 4 Page1 of1 l

CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET I l JPM NUMBER: NRC1 REVISION: 0 l l QUESTION NO.: 2 1 The plant is operating at 100% reactor power when the 'A' Reactor Recirculation (RR) pump trips. AAer taking the proper , actions, the problem is determined to be a faulty overcurrent relay on breaker SA. The relay is replaced and the operators l prepare to start the ' A' RR pump. The following conditions exist: l Loop *B' flow 14,950 gpm Bottom Head Drain temperature 444'F Loop 'A' suction temperature 481'F l Loop 'B' suction temperature 510'F Steam Dome temperature 540*F-Loop 'A' Flow Control Valve Min. position (0) Loop 'A' Unisolated What operator action must be performed prior to returning the idle loop to senice? ANSWER: Slowly throttle open the idle 'A' loop Flow Control Valve ( to increase loop ' A' temperature). l REFERENCE (S): CPS No. 3302.0I section 8.2.6.4

RESPONSE

i i SAT UNSAT l

                                                                                                                                           )

l' Page 2 ofI

   -  ..    .   - .. . . ~  .        - . . - - -              .               . - . .        _ . - _ .    -._-.   -

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET i i i JPM NUMBER: NRC1 REVISION: 0  ! 1 I

                              -                                                        Importance Rating
     - K/A SYSTEM NUM'BER                                         K/A NUMBER                  RQ            SRO     j 202001                                                 A2.10                                        3.9 202001                                                 K4.17                                       3.5 JTA:

TASK NUMBER ANSWER TIME: Min l ORIGINATED / REVISED BY: / REVIEWED BY: / ! APPROVED BY: / Supervisor - Requalification and l Operations Training l I l f I Page 3 ofI l l

4 CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET I

                                                                     #,                                     \

JPM NUMBER: NRC2 REVISION: 0 TASK TITLE: Manually Initiate the High Pressure Core Spray System (HP) - Initiation Lonic Available Der CPS 3309.01 TASK NUMBER: 015200C617 APPLICABILITY: RO .__ SRO X i I TRAINEE DATE I EVALUATOR METHOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 3 minutes l Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: Supervisor - Operations Training l Page 1 of 8 i s

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: _NRC2 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: s Initialize to any suitable IC with HPCS in Standby. Suppression Pool Level is < 19' 11.5" RCIC Storage Tank Level is > 2200 gal. Level 8 is clear on HPCS. Override MANUAL INITIATION PUSIIBUTTON TASK STANDARDS: The High Pressure Core Spray (HPCS) System is manually initiated and is injecting into the reactor vessel. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAI/

REFERENCES:

CPS No. 3309.01, HIGH PRESSURE CORE SPRAY EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: The CRS directs you to manually initiate and inject with HPCS. Transient annunciator response is in effect. START TIME: Page 2 of 8 s

          - _. . _ = . - - -                 .. -    - ..       _.      _.    -.          ..        __= -. . .-        . . . _

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC2 REVISION: 0 PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence ofsteps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Manually Initiate High Pressure Core Spray (HP) - Logic Operable . 8.1.3a) During HPCS operation, verify as appropriate that IE22-F012, HPCS Pump Min Flow to Suppr Pool: Opens whenever HPCS flow is < 625 gpm with HPCS discharge pressure > 145 Psig, aM Shuts whenever HPCS flow is 2 625 gpm.

                  *b)        Arm and Depress HPCS MANUAL INITIATION pushbutton.

STANDARD i HPCS Manual Initiation pushbutton is armed and depressed and observes NO response on HPCS. Reports failure to CRS. CUE: Acknowledge failure and direct manual initiation ofHPCS COMMENTS: l SAT UNSAT Page 3 of 8 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 8.1.4a) During To SupprHPCS Pool: operation, verify as appropriate that IE22-F012, HPCJ Pump Min Flow Opens whenever HPCS flow is , 625 gpm with HPCS discharge pressure < 145 psig, and Shuts whenever HPCS flow is 2 625 gpm. b) Start HPCS Pump,1E22-C001. STANDARD Takes handswitch for 1E22-C001 to START and verifies RED light ON. CUE: l COMMENTS: I SAT UNSAT c) Verify 1E22-F012, HPCS Pump Min Flow To Suppr Pool opens. STANDARD. l Verifies RED light ON lE22-F012 CUE: l l COMMENTS: l 1 i SAT UNSAT { l i 4 d e I Page 4 of 8 l l -l I J

                         .              _         -    .    - _ - - _ ._.     ~ . ~      _      ._           _

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET  ; JPM NUMBER: NRC2 REVISION: _ 0 ) d) Verify HPCS Pmp Rm Sply Fans, IVY 08CA and B start. i l STANDARD. I I Verifies RED light ON for IVY 08CA and B l CUE: COMMENTS: l l On vertical section ofpanel P-800 I SAT UNSAT 1 NOTE i To open 1E22-F004 that has closed on Level 8, the RX WTR LEVEL HI l SEAL IN RESET push-button must be depressed (when > level 2). 3 e) Open IE22-F004, HPCS To CNMT Outbd Isin Valve i l STANDARD. Takes handswitch for IE22-F004 to OPEN and verifies RED light ON. Verifies RED and OREEN light ON for IE22-F012 CUE:

l. COMMENTS:

i l Min. Flow valve may be in mid position based on pressure and flow. ! Red and green lights for the injection valve may be ON at the same time due to the long valve stroke ! time. SAT UNSAT i i u Page 5 of 8 i

CLINTON POWER STATION JOB PERFORMANCE hGASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 1 f) Restore and maintain level using IE22-F004, HPCS To CNMT Outbd Is!n Valve. I STANDARD: . i Operates handswitch for IE22-F004 to adjust HPCS flow to restore and maintain RPV level. CUE:  ! l COMMENTS: l SAT UNSAT  ! t c TERMINATING CUES: ' The HPCS system is injecting water into the reactor vessel. STOP TIME: l i i Page 6 of 8 i I

                                    ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: _NRC2 REVISION: a K/A REFERENCE NUMBERS ImDortance Rati K/A SYSTEM NUMBER _K/A NUMBER RO 209002

                                                       ~

E A4.05 3.8 Page 7 of 8

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSIEET JPM NUMBER: NRC2
. REVISION
0 l

! K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO ERO 209002 A4.05 3.8 i ( i i l-Page 7 of 8

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 1 4 The plant was at 100% power when 4.16 KV Bus IB locked out due to an overcurrent con loss of the 4.16 bus resulted in a trip of the reactor feed pumps with the resulting level tran decreased below level 2 before recovering. Diesel Generator 1C automatically started d transient. What caused the auto start ofDiesel Generator IC? ANSWER: Actuation of High Pressure Core Spray (HPCS) logic REFERENCE (S): E02-lHP99, Sheet 5

RESPONSE

SAT UNSAT I Page1of3

i CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUEGTION NO.: 2 The High Pressure Core Spray (HPCS) System is in standby and reactor power is 75 havejust been informed that during the performance of a surveillance, it was found th Pool Water Level- High setpoint was 15 inches. What action, with regard to HPCS, must this condition? ANSWER: The allowable value is s 12 inches. Declare HPCS System inoperable within I hour and channel in trip within 24 hours OR align the !?CS pump suction to the suppression po REFERENCE (S): ITS 3.3.5.1, Actions D.1, D.2.1 and D.2.2 ITS Table 3.3.5.1-1, Function 3.e RESPONSE; 4 SAT UNSAT f-Page 2 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION Importance Rating K/A SYSTEM NUMBER K/A NUMBER RQ SRQ 209002 209002 K6.01 3.6 G2.1.14 3.3 HA: TASK NUMBER ANSWER TIME: Min ORIGINATED / REVISED BY:

                                                               /

REVIEWED BY:

                                                              /

APPROVED BY:

                                                              /

Supervisor- Requalification and Operations Training Page 3 of 3 1.

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY t: Page1or]

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: _NRC3 REVISION: 0 TASK TITLE: Emergency Startuo of Standby Drywell Coolina System i TASK NUMBER: 011222C506 1 1 APPLICABILITY: RO _ SRO _ X I TRAINEE I DATE EVALUATOR METHOD OF TESTING:

                                                                                                     )

Simulated Performance  : Actual Performance X Classroom Simulator - X Plant APPROXIMATE TIME FOR COMPLETION: 6 minutes Prepared / Revised by: Date: Reviewed by: - Date: Instructor - Operations Approved by: Date: Supervisor- Operations Training Page1of10 l

l CLINTON POWER STATION [ JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide When you complete the task successfully, the objective of this Job Performance Measu SIMULATOR SET-UP CONDITIONS: Initiate to any suitable IC that has a VP in standby. TASK STANDARDS: Operator actions performed per CPS No. 3320.01, Step 8.2.2 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAI1

REFERENCES:

CPS No. 3320.01, DRYWELL COOLING SYSTEM, Step 8.2.2 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the IPM steps. INITIAL CONDITIONS AND INITIATING CUE: An Emergency Condition Exists; the CRS directs you to perform an emergency startup of the 'A' Drywell Cooling System per CPS No. 3320.01. Transient annunciator response is in efTect. START TIME: l I l Page 2 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 l REVISION: 0 i ! PERFORMANCE INFORMATION l Critical steps are denoted with a asterisk (*) to the left of the step number and appear in B letters. Failure to meet the standards for a critical step constitutes failure of the Job Perfor Measure. The sequence of steps is assumed unless denoted in the comments section of

                                                                                                          - = = _

PERFORMANCE STEPS JPM TITLE: Emergency Stanup of Standby Dgwell Cooling System 8.2.2.1 At lH13-P801, start the standby Dgwell Cooling System as follow:

         *8.2.2.1.1 Start Drywell Cooling Fans IVP01CB and IVP01CD (IVP01CA and IVP01CC).

STANDARD Takes handswitches for Drywell Cooling Fans IB and ID to START and observes RED l each fan. CUE: COMMENTS: If an area operator is dispatched to the chiller, cue that an area operator is on his way to the SAT UNSAT l l i l \ l l I 1 Page 3 of10 4

I CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET i JPM NUMBER: __ NRC 3 REVISION: 0

       '8.2.2.1.2 Start Chill Water Pump IVP03PB (IVP03PA) without first closing discharge valve.

l STANDARD-Takes handswitch for Dywell Chill Water Pump IB to START and observes RED ligh Observes RED no flowlight ON. CUE: COMMENTS: Low flow chilled water annunciator clears. SAT UNSAT 8.2.2.1.3 Verify / Place ISX020B(A), Drywell Chiller 1B(I A) Inlet Valvein AUTO AFTER OPEN. STANDARD: Verifies ISX020B in AUTO AFTER OPEN CUE: COMMENTS: SAT UNSAT l l 4 i Page 4 of10 l

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET I JPM NUMBER: NRC3  : REVISION: 0  !

       '8.2.2.1.4 Start standby Drywell Chiller IVPO4CB (IVPO4CA) using the START pushbutton on 1H13-P801.

STANDARD: Depresses START pushbutton for standby Drywell Chiller IB and observes RED light ON. l CUE: COMMENTS: SAT UNSAT 8.2.2.1.5 Send an area operator to the Drywell Chiller to monitor performance and load the chiller as required in accordance with steps 8.1.1.5.7 and 8.1.1.5.8. i STANDARD. Dispatches area operator to monitor and load the chiller as required. CUE: As area operator, report that the chiller is loaded and operating normally. COMMENTS: SAT._ UNSAT ! Page 5 of 10 i

i CLINTON POWER STATION i lI t JOB PERFORMANCE MEASURE WORKSHEET I i I JPM NUMBER: NRC3 REVISION: 0 8.2.2.1.6 !- If IVP01CA, IVP01CC, and iVP01CB,1VP01CD are all going to be leR running open IVP10Y and IVP12Y at PNL IPL43JA and JB.

- STANDARD j

_ Notifies area operator to open the dampers as required. CUE: Dampers have been opened. COMMENTS: SAT UNSAT l. (- 8.2.2.2 At lH13-P800-65, transfer Supplemental Drywell Cooling Coil Units IVP02SE and IVP02SF to the operating Drywell Cooling System as follows:

       *8.2.2.2.1 Close Supplemental Drywell Cooling Coil Units Supply and Return Isol Valves i

IVP090A/1VP091 A (IVP090B/1 VP091B). STANDARD Takes handswitch for IVP090A/91 A to CLOSE and observes GREEN light ON for both valves l CUE: COMMENTS: l SAT UNSAT 1 d Page 6 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: -. NRC 3 REVISION: 0 .

      *8.2.2.2.2 Open Supplemental Drywell Cooling Coil Units Supply and Return Isol Valves i VP090B/l VP091 B (I VP090A/1 VP091 A).

STANDARD Takes handswitch for i VP090B/91B to OPEN and observes RED light ON for both valves  ! 4 CUE: COMMENTS: i 4 SAT UNSAT 8.2.2.2.3 Verify WO system lineup to supplemental drywell cooling coil units IVP02SG and 1VP02SH. STANDARD Verifies WO system lineup by observing RED light ON for the following: IWO551 A/552A CH WTR OUTBD ISOL VLVS IWO551B/552B CH WTRINBD ISOL VLVS CUE: COMMENTS: SAT UNSAT Page 7 of10

CLINTON POWER STATION l* JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0 . 8.2.2.3 \ Locally monitor Drywell Chiller I A for proper operation.

                                                                                                                     -{

STANDARD i Notifies area operator to monitor the Dywell Chiller I A for proper operation ' CUE: Drywell Chiller 1 A is operating properly COMMENTS: I SAT UNSAT TERMINATING CUES: i Startup ofdrywell cooling system is complete. STOP TIME: Page 8 of10

CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC3 REVISION: 0 l K/A REFERENCE NUMBERS i Importance Rating I' K/A SYSTEM NUMBER K/A NUMBER RO SRO ' 295024 EA1.14 3.5 l l l l I l l l Page 9 of10

CLINTON POWER STATION i l JOB PERFORMANCE MEASURE OPERATOR COPY l QUESTION NO.: 1 l A small break LOCA has occurred and drywell pressure has increased to 2.5 psig. Describe l of the Drywell Cooling System (VP) components as a result of the event. i ANSWER: , Drywell~ Chillers, Chill Water Pumps, and Fans trip. The Containment Isol. Vivs IVP004A& 14A&B,15A&B,1WO551 A&B and 552A&B isolate. (These components / valves cannot be restarted / reopened until the condition clears) 1 Supplemental Drywell Cooling Fans (IE, IF, IG, and lH) ' shunt trip' (These components can be restarted at the local breakers) REFERENCE (S): 4 CPS No. 3320.01 l RESPONSE:  ! l i SAT UNSAT l ( Page1of1

l . CLINTON POWER STATION 1 i JOB PERFORMANCE MEASURE OPERATOR COPY QUESTION NO.: 2  ! The Plant is operating at 100 % power. A CR hasjust been delivered to the Control Roo identified the oil coolers for the Drywell Purge Compressors as being Non-Q . What actioJ taken due to this condition? , i Follow-up question: What constitutes the Hydrogen Control Function? ANSWER: I The Drywell Function. Purge Compressors must be declared INOP and verify the status of the At least ONE (1) Division ofHydrogen Igniters are OPERABLE. REFERENCE (S): ITS 3.6.3.3 Action B.1 and Bases

RESPONSE

s SAT UNSAT Page 2 of1

CLINTON POWER STATION i JOB PERFORMANCE MEASURE i OPERATOR COPY i Importance Rating K/A SYSTEM NUMBER K/A NUMBER R_Q SRQ  ! 223001-l K6.11 223002' 3.0 G2.1.12 4.0 JTA: TASK NUMBER ANSWER TIhE: Min ORIGINATED / REVISED BY:

                                                                           /

REVIEWED BY:

                                                                          /

APPROVED BY:

                                                                          /

Supervisor- Requalification and Operations Training i l l l-i I r Page 3 ofI

o

                            ,               CLINTON POWER STATION                                                 ;

I JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0 TASK TITLE: Manually Start Emergency Diesel Generator 1 A l l TASK NUMBER: 011264C526 APPLICABILITY: RO __ SRO X TRAINEE f DATE I EVALUATOR i METHOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 20 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: l Supervisor - Operations Training l l Page1of10

                                                                                                                     )

1 CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Any suitable IC in which DG 1 A is in standby with support systems available. Insert Instructor Override 05A1 ASS 19_X DG 1 A Voltage Regulator switch disabled. TASK STANDARDS: Diesel Generator I A running at rated frequency, DG 1 A Voltage Regulator identified as malfunctioning and all post-start verifications are completed. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3506.01, DIESEL GENERATOR AND SUPPORT SYSTEMS, Section 8.1.3 and 8.3. CPS No. 3506.01C001, DIESEL GENERATOR OPERATING LOGS CPS No. 3506.01C002, DIESEL GENERATOR START LOG EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: The CRS directs you to manually start Diesel Generator l A per CPS 3506.01 starting at 8.1.3.7. An A/C Area qcalified operator is standing by in the DG Room and prestart checks have been completed. START TIME: Page 2 of 10

CLINTON POWER STATION , l I JOB PERFORMANCE MEASURE WORKSHEET l 1 JPM NUMBER: NRC 4 REVISION: 0 F 1 i i PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED, CAPITAL letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The segn=e of steps is assumed unless denoted in the comments section of the JPM. ) I PERFORMANCE STEPS 1 l l JPM TITLE Manual Start Emergency Diesel Generator I A 8.1.3.7 Notify operator in Diesel Generator I A(1B)(IC) Room ofimpending diesel start, and ensure the respective Diesel Generator HVAC Room is clear of personnel.

i STANDARD j Notifies C-Area operator ofimpending diesel start. Dispatches operator to verify DG 1 A HVAC Room is clear ofpersonnel.

CUE: l , As C-Area operator, acknowledge that a start of DG) A is impending and DG 1 A HVAC Room is clear. I COMMENTS: SAT UNSAT l l l Page 3 of10 l

L - ,, j CLINTON POWER STATION i JOB PERFORMANCE hEASURE WORKSHEET l l l JPM NUMBER: NRC4 REVISION: 0 {

         *8.1.3.8      Start Diesel Generator 1 A (IB) (IC) with the DG 1 A (IB) (IC) Control switch on l                       IH13-P877 (P601).

i STANDARD. Starts DG 1 A using Control switch on 1H13-P877 and observes DG 1 A light ON. i CUE: i COMMENTS: i SAT UNSAT 8.1.3.9 Verify the Fuel Oil Transfer Pump starts at 1H13-P877 (P601), or locally. STANDARD: Observes RED light ON for IDO0lPA. ' CUE: COMMENTS: SAT UNSAT t Page 4 of10

     . - .          ..     -      -- ---               .   . - . -     - . - . - ~ -       .  -      _ - ~ -
CLINTON POWER STATION  !

1-

l. JOB PERFORMANCE MEASURE WORKSHEET i

! JPM NUMBER: _NRC 4 REVISION: 0 l l l l 8.1.3.10 Verify DG 1 A (IB) (IC) Room Ventilation Fan running on 1H13-P801 (P800), l or locally. l 1 STANDARD: Observes RED light ON for 1VD01CA. CUE: 1 COMMENTS: SAT UNSAT o 1 l 8.1.3.11 Verify DG 1 A (IB) (IC) Hx Outlet Viv ISXM3 A(B) (ISX006C) open. j l 1 STANDARD j Observes RED light ON for ISX063 A. CUE:

                                                                                                             )

COMMENTS: SAT UNSAT Page 5 of 10

                                                                                                      \
                                           - CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4                                                          REVISION:   0 8.1.3.12     IE SX pump ISX0lPA(B)(C) starts, THEN Verify Plant Service Water (WS) to Shutdown Service Water (SX) header isolation valve ISX014A (B) (C) closed.

STANDARD. . I Verifies GREEN light ON for 1SX014A if ISX0lPA starts.. i i CUE: I l COMMENTS: ISX0lPA should not start due to this evolution. SAT UNSAT i 8.1.3.13 Verify DG 1 A (1B) (1C) frequency 58.8-61.2 Hz. STANDARD Verifies DG 1 A frequency 58.8 to 61.2 on Output Frequency meter. CUE:

     ' COMMENTS:

SAT UNSAT l ( Page 6 of10 l l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0 l L 8.1.3.14 Verify (using one of the following indications) DGI A (IB) (IC) voltage, panel meter j 4000 (4000) (4000), computer point 4015 (4015) (4015), GETARS 3911 l (3911)(3902) to < 4200 volts. l l STANDARD. Verifies DG 1 A voltage < 4200 volts using panel meter 4000, computer point 4015, or GETARS 3911. CUE: l COMMENTS: SAT UNSAT

     '8.1.3.15      Verify remote speed control by varying DG 1 A (IB) (IC) frequency with                   DG 1 A (IB) (IC) Governor control switch on 1H13-P877 (P601) l STANDARD Alternately selects " RAISE" and " LOWER" on the Governor Control Switch. Observes frequency increase and decrease.

CUE: COMMENTS: SAT UNSAT l Page 7 of10

  • 1 1

CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0

    $8.1.3.16      Verify remote voltage control by varying DG 1 A (IB) (IC) voltage with DG 1 A (IB) (IC) Generator Voltage Regulator control switch on 1H13-P877 (P601)

STANDARD Alternately selects " INCREASE" and " DECREASE" on the voltage regulator control switch. Observes no change in voltage and reports to CRS that the voltage regulator is malfunctioning (not responding to manual control). CUE: As CRS, acknowledge the malfunctioning voltage regulator and direct that the diesel remain mnning until EC&I can investigate the problem. COMMENTS: 1 SAT UNSAT 8.1.3.17 Locally check cylinder test valves and handhold covers for leakage and tighten as necessary. STANDARD. Directs C Area operator to check cylinder test valves and handhole covers for leakage. CUE: COMMENTS: SAT UNSAT Page 8 of10

CLINTON POWER STATION 9 JOB PERFORMANCE hEASURE WORKSIEET JPM NUMBER: NRC4 REVISION: 0 TERMINATING CUES: i

      - DG 1 A is operating at rated frequency and post-start verifications are complete.

i STOP TIME:  ! l l i I ( l l l l l [ I [. t l Page 9 of10

1 CLINTON POWER STATION JOB PERFORMANCE hEASURE WORKSHEET JPM NUMBER: NRC 4 REVISION: 0 i K/A REFERENCE NUMBERS I 1 1 Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RO SRO I 264000 A4.04 3.7 i i i l l 4 Y l Page 10 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY THIS IS A CLOSED BOOK QUESTION QUESTION NO.: 1 Diesel Generator I A has been started and paralleled wih the RAT. The ERAT is tagged out. A small leak has caused drywell pressure to increase to 2.3 psig. Subsequently,4160 vac bus l Al experiences a momentary (approximately 3 seconds) voltage drop to 3100 volts. Describe the response of diesel generator I A to this sequence of events ANSWER: The diesel generator output breaker would OPEN on the LOCA signal but would remain running. The momentary drop in bus voltage WOULD NOT ca'use the output breaker to reclose on the bus. (There is a time delay of15 seconds) i REFERENCE (S): CPS No. 3506.01

RESPONSE

SAT UNSAT l 4 s l Page1of1 l

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY I QUESTION NO.: 2 1 The plant is at 100% power with all equipment normal except that I A Diesel Generator is tagged out for turbocharger repair. Annunciator "HIGH/ LOW TEMP DG ROOM IB"(5052-4A) alarms. The i operator notes that the temperature in the IB Diesel Generator room is 48*F and decreasing at approximately 1*F. per minute. What action (s) must be taken by the control room operators? ANSWER: Declare the IB Diesel Generator inoperable and attempt to restore DG Room Make Up Heater. REFERENCE (S): CPS ITS Section 3.8.1 Action E l CPS No. 5052.04, page 1 (4A) i CPS No. 3403.01

RESPONSE

I I' SAT UNSAT i I l i i Page 2 of1

l. ', CLINTON POWER STATION l JOB PERFORMANCE MEASURE OPERATOR COPY l l Imoortance Rating K/A SYSTEM NUMBER K/A NUMBER R3 SRO 264000 K4.08 3.7 264000 G2.1.12 4.0 I JTA: TASK NUMBER ANSWER TIM __E: Min ORIGINATED / REVISED BY: / l REVIEWED BY: / APPROVED BY: / Supervisor - Requalification and Operations Training i l Page 3 of I

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0 TASK TITLE: Eaualize Around and Open MSIVs per CPS No. 4411.09 TASK NUMBER: 015200C643 APPLICABILITY: RO _ SRO X TRAINEE  ! DATE EVALUATOR METHOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant . APPROXIMATE TIME FOR COMPLETION: 30 minutes Prepared / Revised by: Date:

Reviewed by: Date:

Instructor- Operations Approved by: Date: Supervisor- Operations Training Page1 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER. NRC 5 REVISION. O READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Any IC with the reactor shutdown, RPV pressurized, and MSIVs/MSL drains shut. Establish / verify a condenser vacuum pump is lined up and running on the Main Condenser. Reset the Main Turbine and close Turbine Drains. TASK STANDARDS: Operator actions performed per CPS No. 4411.09 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAIJ

REFERENCES:

CPS No. 4411.09, RPV PRESSURE CONTROL SOURCES EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: A !c:s ofIA resulted in closure of the MSIVs. IA has been recovered and EOP-1 has been entered. The CRS directs you to reopen the MSIVs per CPS No. 4411.09 to assist in RPV pressure control START TIME: Page 2 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0 PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Equalize Artund and Open MSIVs per CPS No. 4411.09 NOTE Additional guidance for normal operating modes is in CPS No. 3101.01, MAIN STEAM (MS,IS & ADS). 2.2.2 a IF This step was entered from EOP-2, EOP-3, or EOP-4, THEN1) OK to defeat isolations per CPS No. 4410.00C007, DEFEATING RPV PRESSURE CONTROL SYSTEM INTERLOCKS.

2) OK to exceed 100 F/hr cooldown.

2.2.2b Reset any cleared GROUP 1 isolations. STANDARD ' Determines that no pressure control system interlocks need to be defeated and that Group 1 isolation is reset. CUE: COMMENTS: l l SAT UNSAT l l Page 3 of10

      -                  ..             . . . - - - . . _ _ . _ - . -      -       .-    . . - . . . . - . - _ ~ ~ _ .

CLINTON POWER STATION

                                                                                                                               )

JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC5 REVISION: 0 2.2.2 c Regardless if Cire Water (CW) is available or not: e OK to position Div 1(2,3,4) Condenser Low Vacuum Bypass switches to BYPASS to clear Gr 1 interlocks.

1) Establish vacuum per CPS No. 3112.01, CONDENSER VACUUM (CA), or
2) Ifvacuum cannot be established, open ICA007, Condenser Vacuum Breaker Valve.

2.2.2 d To avoid inadvertent bypass valve, operation, maintain Pressure Set Point at least 50 psig

                        > RPV pressure.

STANDARD: Determines that Condenser vacuum is already established CUE: l i COMMENTS: SAT UNSAT i l l l Page 4 of10

 ,. I

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0

      *2.2.2 e     Open IB21-F098A(B, C, & D), Main Steam Shutoff Valves.

STANDARD: Takes handswitches for IB21-F098A(B,C,&D) to OPEN and observes RED light ON for each valve. CUE: COMMENTS: SAT UNSAT

      *2.2.2f      Open IB21-F028A(B, C, & D), Main Steam Line Outbd MSIVs.

e OK to open following drains to assist in the attempt. IB21-F067A(B, C, & D), MSI' Outbd MSIV Before Seat Drn Vivs. IB21-F068, Outbd MSIV Before Seat Warmup Drn Viv. IB21-F069, Outhd MSIV Before Seat Norm Drn Viv. STANDARD. Takes handswitches for IB21-F)28A(B, C, & D), to OPEN and observes RED light ON for each valve. CUE: COMMENTS:

May open drain valves to assist in equalizing SAT UNSAT l

l Page 5 of10 l l

CLINTON POWER STATION

   .                                                                                                   1 JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5                                                   REVISION:        0
        *2.2.2 g    Equalize around the MSIVs by opening:
1) IB21-F016, MS Drn & MSIV Byp Inbd Isol Valve.
2) IB21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
3) IB21-F020, MSIV Byp Viv For MS Line Warm Up. ,

i STANDARD. Takes handswitches for IB21-F016,19, and 20 to OPEN and observes RED light ON for each valve. CUE: COMMENTS: l SAT UNSAT l l l 4 i l l l l Page 6 of 10

CLINTON POWER STATION l JOB PERFORMANCE MEAS'URE WORKSHEET 1 I JPM NUMBER: NRC 5 REVISION: 0

       *2.2.2 h      Establish a AP s 200 psid across the MSIVs.
                     *-       OK to shut follow' m g drains to assist in the attempt.

IB21-F015, MS Low Points Drn Shutoff Valve. , IB21-F021, Inbd MSIV Before Seat Warmup Drn Valve. l 1B21-F033, Inbd MSIV Before Seat Warmup Drn Valve. IB21-F068, Outbd MSIV Before Seat Warmup Drn Viv. IB21-F069, Outbd MSIV Before Seat Norm Drn Vlv. IB21-F070, MS Low Point Warm Up Drn Viv. 1 IB21-F071, MS Low Point Normal Drn Viv. ITD-SVl(3,5,7), Mn Turb Stop Viv #1(2,3,4) Drn Viv , (TG needs to be reset to shut). i i STANDARD  ! Establishes < 200 psid across MSIVs. Shuts drain valves as necessary. l l CUE: l COMMENTS: SAT UNSAT Page 7 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM " TIMBER: NRC5 REVISION: 0

       *8.2.2.2 i   Open IB21-F022A(B, C, & D), Main Steam Line Inbd MSIVs.
     -STANDARD.

Takes handswitches for IB21-F022A(B, C, & D) to OPEN, and observes RED light ON for each valve. CUE: COMMENTS: SAT UNSAT TERMINATING CUES: MSIVs are reopened. i STOP TIME: l I l l 1 Page 8 of10

l . l CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET l i . JPM NUMBER: NRC5 REVISION: 0 l l ' 1 i K/A REFERENCE NUMBERS ! Imoortance Ratina l l 1 K/A SYSTEM NUMBER K/A NUMBER RO SRO i 239001 A4.01 4.0 l l l i

                                                                                 )

i 1 l Page 9 of10

CLINTON POWER STATION , i

JOB PERFORMANCE MEASURE OPERATOR COPY l l

! QUESTION NO.: 1 ! 1 l The plant operating at 96% power. A C&I tech is performing a surveillance on Group One closure l signals and currently has one of the channels tripped to perform the surveillance. The plant experiences a  ; transient that results in the other channel tripping and causing an MSIV closure and a resultant SCRAM.

                                                                                                                            )

The operators perform the immediate actions for the SCRAM When the turbine generator tripped off  ; line, one of the bypass valves came open about 50% and stuck open. The MSL pressure dropped quickly l l (<300 psig), while reactor vessel pressure is being controlled by the relief valves SIC and 51D.  ! l Determine how you would recover (unisolate and open MSIVs) from this situation. 1 l ANSWER: Shut the open bypass valve, Open all the MSIVs except the inboards, Bypass the Inboard MSIVs and reduce dP to less than 100 psid, open Inboard MSIVs REFERENCE (S): CPS No. 3101.01, MAIN STEAM (MS, IS & ADS)

RESPONSE

l SAT UNSAT i i i t Page1of1 l

L. CLINTON POWER STATION JOB PERFORMANCE MEASURE f OPERATOR COPY i  : QUESTION NO.: 2 You are the CRS and the plant has been operating at near rated power for several weeks. Earlier in the shift, the BCRO announced that temperatures in the main steam line tunr;els were approximately 140 F and slowly increasing. He now reports that main steam line tunnel temp:rature is 160 F and still slowly  ; increasing. What action (s) should the control room crew take as a re., ult of this condition? j l I ANSWER: l Initiate a reactor scram Initiate Group 1 (MSLs and Drains) and Group 4 (RWCU)isolations.

        . (A Group 1 and 4 isolation should have occurred at 156 F)

REFERENCE (S): 1

        ' CPS No. 5067.01D                                                                                                             l I                                                                                                                                       1 CPS No. 5067.02F

RESPONSE

SAT UNSAT l l l r i Page 2 of1

                      ,       -    .-~             _ . - -      . . . . - . -           .-       . - .    .-. . - . _ .

F CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RQ SRO l 239001 A2.03 4.2 239001 K4.01 3.8 i JTA: I TASK NUMBER ANSWER TIME: Min ) ORIGINATED / REVISED BY: / < REVIEWED BY: / APPROVED BY: / Supervisor - Requalification and 1 Operations Training l 1 Page 3 of I

L , CLINTON P'OWER STATION p. JOB PERFORMANCE MEASURE WORKSHEET

    - JPM NUMBER: NRC6                                                         REVISION:   0 TASK TITLE: Shutdown RCIC - Initiation Signal Clear TASK NUMBER: 011217C005 APPLICABILITY: RO __ SRO X I

l TRAINEE DATE EVALUATOR METHOD OF TESTING: , Simulated Performance Actual Performance X 1 X Classroom Simulator Plant l APPROXIMATE TIME FOR COMPLETION: 5 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations

    ' Approved by:                                                       Date:

j Supervisor - Operations Training l l Page1 of10

l CLINTON POWER STATION l

 +                                                                                                                  l JOB PERFORMANCE MEASURE WORKSHEET                                                l l

JPM NUMBER: NRC 6 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: 100% power with RCIC operating in the tank to tank mode. TASK STANDARDS: RCIC shutdown per CPS No. 3310.01, Section 8.1.6 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3310.01, REACTOR CORE ISOLATION COOLING (RI), Section 8.1.6 EVAI.UAYOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: RCIC is currently operating in tank to tank mode. The CRS directs you to. shutdown RCIC per CPS No. , 3310.01. START TIME: 1 l Page 2 of 10

CLINTON POWER STATION l . JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 6 REVISION: 0 l PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Shutdown RCIC - Initiation Signal Clear NOTE Do not secure or place RCIC in manual override unless directed to per the EOPs, or by at least two independent indications: a) misoperation in automatic mode is confirmed, b) adequate core cooling is assured. Minimize time on RCIC Min flow per Limitation 6.2.5. 8.1.6.1 If necessary, depress RCIC SEAL IN RESET push-button. STANDARD Determines RESET is not necessary. WHITE light is extinguished. CUE: COMMENTS: SAT UNSAT Page 3 of 10

               =.           --                  --             --         _   - -  ..     .
   .                                                                                           i CLINTON POWER STATION l

JOB PERFORMANCE MEASURE WORKSHEET l  ! l JPM NUMBER: NRC6 REVISION: 0 l

       *8.1.6.2    Shut (if open) 1E51-F022,                                                   l RCIC Pmp First Test Valve To Stor Tank.                                 l STANDARD.

l Takes handswitch for IE51-F022 to CLOSE and observes GREEN light ON. j CUE: COMMENTS:  ! SAT UNSAT

       '8.1.6.3    Shut IE51-F095, RCIC Turb Stm Supp Bypass Valve.

STANDARD. Takes handswitch for IE51-F095 to SHUT and observes GREEN light ON. CUE:

     ~ COMMENTS:

SAT UNSAT l t l Page 4 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC6 REVISION: 0 i

         '8.1.6.4       Trip RCIC turbine from III13-P601 by depressing the RCIC TURBINE REMOTE TRIP push-button.

STANDARD l Trips the RCIC turbine by depressing the trip pushbutton and observes GREEN light ON for trip / throttle ! valve, turbine speed decreasing 1 CUE: i COMMENTS: SAT UNSAT

         *8.1.6.5       Shut (if open) 1E51-F059,
                                                                                                                 )

RCIC Pmp Second Test Valve To Stor Tank. i STANDARD Takes handswitch for IE51-F059 to close and observes GREEN light ON. , 1

      ' CUE:

COMMENTS: SAT UNSAT Page 5 of10

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC6 REVISION: 0 i

        '8.1.6.6         Shut / verify shut 1E51-F045, RCIC Turb Stm Supp Shutoff Valve.

I STANDARD. Takes handswitch for IE51-F045 to CLOSE and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT NOTE. 1E51-F005 is normally closed and opens as required by a level signal from the 3 turbine exhaust drain pot. 8.1.6.7 After IE51-F045 closes, verify the following valves open automatically: a) lE51-F004, RCIC Turb Exh Drn To RF First Isol Viv. b) lE51-F025, RHR & RCIC Stm Supp First Drn Isol' Valve.  ; c) lE51-F026, RHR & RCIC Stm Supp Second Drn Isol Valve. 1 STANDARD. After IE51-F045 is SHUT, verifies IE51-F004, F025, and F026 OPEN by observing RED light ON for each valve. CUE: COMMENTS: SAT UNSAT i l Page 6 of10

CLINTON POWER STATION l' JOB PERFORMANCE MEASURE WORKSHEET 1 l JPM NUMBER: NRC6 REVISION: 0 l

                                                                                                        )

8.1.6.8 Verify following valves shut- 1 1 ! a) 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve. ' b) lE51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool. STAND /dD: Verifies IE51-F013 and IE51-F019 SHUT by observing GREEN light ON for each valve. CUE: l COMMENTS: SAT UNSAT l 8.1.6.9 Reset the RCIC Turbine Trip & Throttle Valve as follows: , a) Place IE51-C002, RCIC Turbine Trip Viv Opr switch to CLOSE to reset the RCIC Turbine Trip & Throttle Valve. b) Open IE51-C002, RCIC Turbine Trip Viv Opr (Stem). STANDARD: l Takes handswitch for IE51-C002 to CLOSE and verifies GREEN light ON. Takes handswitch for IE51-C002 to OPEN and verifies RED light ON.

CUE:

COMMENTS:

SAT UNSAT l

f 4 l l Page 7 of10 l

   ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 6 REVISION: 0 , l I 8.1.6.10 Stop the Gland Seal Air Compressor  ; l STANDARD. l Takes handswitch for Glt.nd Seal Compressor to STOP and observes GREEN light ON. ! CUE: COMMENTS: l SAT UNSAT 8.1.6.11 Shut IE51-F046, RCIC Pmp Supp To Turb Lube Oil Cir, STANDARD: Takes handswitch for lE51-F046 to CLOSE and verifies GREEN light ON. CUE: COMMENTS: SAT UNSAT 8.1.6.12 Verify RCIC Pump Flow Cont,1E51-R600 set to 600 gpm/ AUTO. STANDARD: , 1 Verifies lE51-R600 set to 600 gpm and in AUTO. CUE: COMMENTS: SAT UNSAT l Page 8 of10

_ . . .- . . . ~ . - ~ . - . - . ~ . . - . . . _ . - - . - . . - = . . . - . . . - . . - . - - . CLINTON POWER STATION I l JOB PERFORMANCE MEASURE WORKSHEET l' l l

           'JPM NUMBER: NRC6                                                                        REVISION:      0 l-TERMINATING CUES:

i RCIC is shutdown STOP TIME: i l j Page 9 of10

     .                                                                              i CLINTON POWER STATION l

JOB PERFORMANCE MEASURE WORKSHEET l l JPM NUMBER: NRC 6 REVISION: 0 I 1 K/A REFERENCE NUMBERS ) Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 217000 A4.04 3.6 l l l 1 1 j 1 I l I Page 10 of10 l l

CLINTON POWER STATION JOB PERFORMANCE MEASURE  ! OPERATOR COPY QUESTION NO.: I' The plant was operating at ~54% power with the 'B' TDRFP having been shutdown for troubleshooting; A small break LOCA occurred causing drywell temperature and pressure to increase to the point of a

         - reactor scram. ' Current plant conditions are as follows:

RPV Pressure 800 psig Slowly decreasing RPV Level - 50 inches Slowly decreasing Drywell Pressure 2.5 psig Slowly increasing -

                  -- Drywell Temperature        160 F           Slowly increasing During this transient, RCIC tripped and isolated.' Why did RCIC trip and isolate AND what caused the              I condition that led to the trip and isolation?

ANSWER: RCIC isolated on a high area temperature which caused the trip. The high temperature was caused by the failure of the gland seal air compressor to auto start on an initiation signal because it had been shunt  ; tripped on the high drywell pressure signal. REFERENCE (S): CPS 3310.01

RESPONSE

l i SAT UNSAT l l i '+ i t , l l l l Page1 of1 L i' $c

   .                                                                                                                     l CLINTON POWER STATION                                                         l JOB PERFORMANCE MEASURE                                                          l OPERATOR COPY THIS IS A CLOSED BOOK QUESTION                                                               l QUESTION NO.:                  2 The plant is operating at rated conditions. RCIC has been operating and aligned in the CST to CST mode. Current conditions are as follows:

RCIC Steam Tunnel temperature 125 F Slowly increasing RCIC Steam Tunnel delta T 30 F Slowly increasing RCIC Equip. Area temperature 140 F Slowly increasing RCIC Equip. Area delta T 22 F Slowly increasing Suppression Pool temperature 87 F Slowly increasing Suppression Poollevel feet Slowly increasing i What is the affect on RCIC due to these conditions? f ANSWER: RCIC suction should have realigned to the Suppression Pool. RCIC Suppr Pool Suction Valve, opens RCIC Storage Tank Suction Valve, closes RCIC Pmp First Test Valve to Stor Tank, closes RCIC Pmp Second Test Valve to Stor Tank, closes Pump mns on minimum flow REFERENCE (S): CPS No. 3310.01 i

RESPONSE

i t SAT UNSAT

Page 2 ofI
l. CLINTON POWER STATION i.. i

! JOB PERFORMANCE MEASURE OPERATOR COPY t l Importance Ratina i

   , K/A SYSTEM NUMBER                           K/A NUMBER                RQ          SRO        l 217000                                   A2.01                                    3.7 217000                                    A2.12                                   3.4 JTA:

l TASK NUMBER ANSWER TIME: Min ORIGINATED / REVISED BY: / l REVIEWED BY: / APPROVED BY: / Supervisor- Requalification and Operations Training l Page 3 of I

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0 I TASK TITLE: Purge Primary Containment Using VG l TASK NUMBER: 011261C505 APPLICABILITY: RO __ SRO X TRAINEE DATE EVALUATOR 1 METHOD OF TESTING: l Simulated Performance Actual Performance X Classroom Simulator X Plant i APPROXIMATE TIME FOR COMPLETION: 15 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations i Approved by: Date: 1 Supervisor - Operations Training Page1 of15

CLINTON POWER STATION i l JOB PERFORMANCE MEASURE WORKSIEET l JPM NUMBER: NRC7 REVISION: 0 1 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CON'DITIONS: Any suitable IC with VG trains in standby and containment pressure < 2.6 psig. Remove tags and covers l for IVQ006A/B and IVQ002A/B l l TASK STANDARDS: Primary Containment purged using SGTS per CPS No. 3319.01 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3319.01, STANDBY GAS TREATMENT (VG), Section 8.2.5 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. Annunciator on the 5043 panel may come in, but they are not applicable to the task being performed in this JPM. When annunicators alarm, the annunciator (s) should be announced to the control room and then the reason should also be stated if known or expected. INITIAL CONDITIONS AND INITIATING CUE: Due to increasing Containment pressure, the CRS directs you to hold Containment pressure less than 1.68 psig using SGTS (VG) Train B. START TIME: l l Page 2 of15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET { JPM NUMBER: NRC7 REVISION: 0 t l PERFORMANCE INFORMATION l Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance l-Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. l ! PERFORMANCE STEPS JPM TITLE: Purge Primiry Containment Using Standby Gas Treatment (VG) CAUTION SBGT should not be used if area being ventilated is > 212 F. l NOTE CNMT purge is not available if CNMT pressure is 2 ?. 6 psid. This interlock shall ngi be defeated to run VG fc r CNMT purge. (Actual setpoint 2.56 psid, SPDS reads only to tenths). l 8.2.5.1 Verify CNMT pressure < 2.6 psid by observing HI CNMT PRESS white indicating light l (above IVG01YA/B switch) OFF. STANDARD: Verifies containment pressure < 2.6 psid by observing HI CNMT PRESS WHITE light OFF. t CUE: i i COMMENTS: l l SAT UNSAT 4 4 Page 3 of15 i l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC7 8.2.5.2 Notify Radiation Protection to verify 0PR03S or OPR04S in service and Chemistry Department should be notified immediately after establishing flow. STANDARD. Notifies RP to verify OPR03S or OPR04S in service. Notifies Chemistry after establishing flow. CUE: As RP, cue that OPR03S is in service. As Chemistry, acknowledge establishing SGTS flow. t COMMENTS: SAT UNSAT

   '8.2.5.3      Position the selected train's IVG02YA(B), Fuel Building Isolation Damper control switch to CLOSE and verify:

a) 1VG02YA(B) closes. (ifopen) b) IVG04YA(B), SGTS TRN A(B) Pmp Rms Suction Damper closes. c) IVG05YA(B), SGTS TRN A(B) Fuel Bldg Suct Dmpr closes (if open) d) IVG06YA(B), SGTS TRN A (B) ECCS Rms Suct Dmpr closes. STANDARD: Takes handswitch for IVG02YB to CLOSE and verifies GREEN light ON for iVG02YB,1VG04YB, IVG05YB, and IVG06YB. CUE: COMMENTS: SAT UNSAT Page 4 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET REVISION: O JPM NUMBER: NRC7 c NOTE In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 when in MODE 1,2, & 3, the following valves shall be sealed closed under administrative control to assure that they cannot be inadvertently opened. e Obtain ShiR/ Assistant Shin Supervisors approval to perform the following step.

      *8.2.5.4     Open IVQ006A and IVQ006B, Containment Building Exhaust Isolation Bypass dampers.

STANDARD Requests permission to complete step 8.2.5.4 and open 1VQ006A and 1VQ006B. Aner receiving permission, takes handswitch for IVQ006A/6B to OPEN and observes RED light for each damper. CUE: As CRS, direct that IVQ006A and IVQ006B. If asked, the WCS has temporarily lined and removed tags for iVQ006A/B COMMENTS: If asked, the plant is currently in Mode 3, and the WCS has temporarily lined and removed tags for IVQ006 A/B SAT UNSAT Page 5 of 15

__ . _ . . _ - .. ._ _ - = . . .. - - - . - . . CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC7 E9111 Starting an Exhaust Fan will automatically close IVG016YA(B), Fuel Bldg ) Exh Inbd (Outbd) Isol Damper, and IVG017YA(B), Fuel Bldg Exh Inbd l (Outbd) Isol Damper. f i 1

        *8.2.5.5       Place the selected train in service by starting its respective Exhaust Fan, OVG02CA(B).

l STANDARD: Takes handswitch for OVG02CB Exhaust Fan to START and observes RED light ON. I CUE: COMMENTS: , SAT UNSAT l l l l l 1 Page 6 of15

CLINTON POWER STATION I JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC7 ( l NOTE The SGTS Trn A(B) DW Purge Isolation Damper, IVG0lYA(B) will not open if Containment pressure is 2.6 psid or more. For the following steps, the flow rate for SGTS will be substantially less than the nominal flow of 4000 SCFM due to piping restrictions. The flow should be about 400 - 500 SCFM. 1

  • 8.2.5.6 If the whim Permissive light is unlit (indicating less than 2.6 psid Containment pressure),

then ope VG01YA(B), SGTS Trn A(B) DW Purge Isolation Damper by positioning its control switch to PURGE. STANDARD: Verifies WHITE Permissive light is UNLIT and takes handswitch for 1VG0lYB to PURGE and observes l RED light ON. 1 CUE: COMMENTS: May verify by checking Containment pressure. SAT UNSAT l Page 7 of15

1 . CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: O c NOTE- ) In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 when in MODE 1,2, &3, the following valves [1VR002A(B) & l IVQ006A(B)] shall be sealed closed under administrative control to assure that they cannot be inadvertently opened. e Obtain Shift / Assistant Shift Supervisors approval to per, form the following step.

          *8.2.5.7     When Containment pressure becomes negative, open IVR002A and IVR002B, Containment Building Supply Isolation Bypass dampers.

STANDARD. Requests permission to open iVR002A and IVR002B when containment pressure becomes negative. When Containment pressure becomes negative, takes handswitch for iVR002A and IVR002B to OPEN and observes RED light ON for each damper. CUE: As CRS, direct IVR002A and IVR002B be OPENED when containment pressure becomes negative. COMMENTS: SAT UNSAT I l l l l l Page 8 of15

  .      .      .  . . = _ _ _ _      .-    ---          . ~     - - .       .   . . .    - - . . - . _ . _ .

CLINTON POWER STATION l, JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 7 REVISION: 0 l

     *8.2.5.8     When Containment Purge with SGTS is no longer desired, close IVR002A and IVR602B, Containment Building Supply Isolation Bypass dampers.

STANDARD: Takes handswitch for IVR002A and IVR002B to CLOSE and observes GREEN light ON for each damper. CUE: Containment purge using SGTS is no longer needed. COMMENTS: SAT UNSAT

       '8.2.5.9     Close IVQ006A and IVQ006B, Containment Building Exhaust Isolation Bypass dampers..

STANDARD: Takes handswitch for IVQ006A and IVQ006B to CLOSE and observes GREEN jight ON for each damper. CUE: COMMENTS: SAT UNSAT Page 9 of 15

   ~

CLINTON POWER STATION' JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC 7 REVISION: 0

      *8.2.5.10    Close IVG01YA(B), SGTS Trn A(B) DW Purge Isolation Damper by positioning its handswitch to NORMAL.

STANDARD: Takes handswitch for IVG0lYB to NORMAL and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT I 8.2.5.11 Verify Chemistry has performed samples as required per CPS 919940.01, WEEKLY CHEMISTRY SURVEILLANCE LOG and ODCM 3.2.2/ TBL 3.4-1 ITEM B prior to shutdown. l STANDARD Contacts Chemistry to verify samples have been performed per CPS 919940.01 CUE: Samples have been performed per CPS 919940.01 COMMENTS: SAT UNSAT i Page 10 of15

l CLINTON POWER STATION l \ I JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 ) JPM NUMBER: NRC 7 ) I NOTE IVG016YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, and IVG017YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, will open when i the Exhaust Fanis stopped. l 1

     *8.2.5.12  Shutdown the operating SGTS train by stopping its respective Exhaust Fan, OVG02CA(B) by returning its control switch to AUTO.

STANDARD: Takes handswitch for OVG02CB to AUTO and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT l l I Page 11 of 15

1 CLINTON POWER STATION 1 JOB PERFORMANCE MEASURE WORKSHEET I ( REVISION: 0 JPM NUMBER: NRC 7 l I Start the SGTS TRN A(B) STANDBY CLG FAN, OVG03CA(B) per 8.2.2.1 and 8.2.5.13 continue to operate the fan until such time that it has been determined that the in the charcoal absorber has decreased to the point where the Cooling Fan is no needed. (Refer to section 8.2.2.2 for shutting down the fan.) Start Cooling Fan,0VG03CA(B), and verify that the following dampers open: 8.2.3.1 l OVG03YA(B), SGTS TRN A(B) Cont. Bldg Isol Damper a) OVG04YA(B), SGTS TRN A(B) Cig Fan 3CA(B) Exh Damper b) OVG05YA(B), SGTS TRN A(B) Exh Fan (Stack) Damper c) STANDARD Takes handswitch for OVG03CB to AUTO and observes RED light ON. Verifie l dampers OVG03YB, OVG04YB, and OVG05YB. CUE: COMMENTS: 1 SAT _UNSAT I l Page 12 of 15

                         .    . . .   ..          _   ~_       _  . - _ _       _.         _ . _ . .

CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET l REVISION: 0 JPM NUMBER: NRC7

       *8.2.5.14 Position IVG02YA(B), Fuel Bldg Isolation Damper control switch to AUTO and verify IVG04YB, Pump Rooms Suction Damper, opens (IVG04YA remains STANDARD:

Takes handswitch IVG02YA to AUTO and verifies RED light ON for IVG04YB. Verifi

     - GREEN light ON.

I CUE: I COMMENTS: SAT UNSAT 8.2.5.15 If desired, establish Containment Building ventilation / purge per CPS No. 3408.01 CONTAINMENT BUILDING /DRYWELL HVAC (VR, VQ). STANDARD: Requests direction to establish Containment Building ventilation. CUE: Will not be established at this time. COMMENTS: SAT .. UNSAT l i 1 4

                                                                                                         }

Page 13 of15

      . - . _             -         - - . .      . , . _.       .~ .  = - . -  .   . - - .   . .-

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC7 TERMINATING CUES: Containment Purge using SGTS has been completed. l i STOP TLME: i I l r i f 1 l l l i t l l l r i i. Page 14 of15

i

  • I i

l CLINTON POWER STATION 1 JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC7 l l' K/A REFERENCE NUMHERS 1 l Importance Ratina K/A NUMBER R O_ SRO K/A SYSTEM NUMBER 3,4  : A4.04 I l 261000 1 l l l l l. l l i l l l Page 15 of15

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY l I i THIS IS A CLOSED BOOK QUESTION 1 , QUESTION NO.:

Given the following conditions:

e A complete Standby Gas Treatment System initiation signal was received. l I e Both Standby Gas Treatment Trains staned as designed.

  • The "A" Standby Gas Treatment Train was manually secured by the BCRO.

l !

  • The "B" Standby Gas Treatment Train is currently operating.

What condition will automatically start the "A" Standby G,as Treatment Train? ANSWER: 4 Low flow in the operating train (Standby Gas Treatment Train). REFERENCE (S): CPS No. 3319.01

RESPONSE

l 1 i SAT UNSAT i l i Page1ofI

CLINTON POWER STATION \. JOB PERFORMANCE MEASURE  ! OPERATOR COPY \ 2 QUESTION NO.: The plant was operating at 100% power when an accident occurred that caused a radiation Exhaust radiation is currently 120 mr. Describe how this condition affects Continuous Containment Purge (CCP). ANSWER: Continuous Containment Purge fans should have tripped and CCP should have isolated at 100 mr. i Shut CNMT Bldg Outbd Isol Viv VR006A1 Shut IVR006B CNMT Bldg Inbd Isol Viv Shut IVR007B CNMT Bldg Exh/Prg inbd Isol Viv Shut IVR007A CNMT Bldg Exh/Prg Outbd Iso! Viv Shut l IVR036 IA Sig Outbd Isol Viv For Dmpt IVR04Y Shut IVR041 IA Sig OutbdIsol Viv For Dmpr IWO521 Shut IVR035 IA SigInbd Isol Viv For Dmpr IVR04Y Shut IVR040 IA SigInbd Isol Viv For Dmpr IWOS21 REFERENCE (S): CPS No. 3319.01 CPS Mo. 3404.01 i CP3 No. 3408.01

RESPONSE

SAT UNSAT Page 2 ofI

CLINTON POWER STATION 4 JOB PERFORMANCE MEASURE l OPERATOR COPY l Importance Rating K/A NUMBER RQ SRO K/A SYSTEM NUMBER K4.01 3.8 261000 K6.04 3.1 261000

                                                                                                                   '1 I

l JTA: J TASK NUMBER ANSWER TIME: Min ORIGINATED / REVISED BY:

                                                                                /
                                                                                /

REVIEWED BY:

                                                                                 /

APPROVED BY: Supervisor - Requalification and i Operations Training Page 3 ofI

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 . REVISION: 0 TASK TITLE: Startuo a Steam Bvoass Hydraulic Power Unit l TASK NUMBER: 041248C517 1 I APPLICABILITY: RO _ SRO X l TRAINEE DATE EVALUATOR l 1 l METHOD OF TESTING: Simulated Performance X Actual Performance Classroom Simulator Plant X APPROXIMATE TIME FOR COMPLETION: 20 minutes Prepared / Revised by; Date: Reviewed by: Date: Instructor - Operations Approved by: Date: Supervisor - Operations Training l i t Page1of10

!, CLINTON POWER STATION l l JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 l l READ TO THE OPERATOR 4 I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. l SIMULATOR SET-UP CONDITIONS: i l None TASK STANDARDS: Operator actions performed per CPS No. 3105.04 l TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: l None i PROCEDURAU

REFERENCES:

CPS No. 3105.04, STEAM BYPASS AND PRESSURE REGULATOR (SB) EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. I INITIAL CONDITIONS AND INITIATING CUE: l A plant is currently in an outage. The CRS directs you to start the ' A' Steam Bypass HPU for testing. The pump is being started on a daily basis. All prerequisites have been met. START TIME: 4 l l i Page 2 of 10 1 i

 -     ..     - -.                             . _. ___._.    . . - .             - _ - ~ . . - -           . - .  - - . - . -

r l CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: O PERFORMANCE INFORMATION I Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED l letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. , l l PERFORMANCE STEPS i JPM TITLE: Startup a Steam Bypass Hydraulic Power Unit NOTE The following startup refers to the HPU associated with the steam bypass valves. The operation of the Steam Bypass and Pressure Regulation (SB) system will be per the plant stanup/ shutdown integrated 300X.01 series. , Temperature of the fluid must be 2 90 F before the pumps are started. 1 8.1.1a) E: Fluid temperature is < 90 F, i THEN: Turn on space heaters I A and/or IB to increase fluid temperature. b) E: Temperature is 2 90 F,  ! THEN: Verify / Place space heaters I A and IB in Auto. STANDARD. Simulates turning space heater I A and/or IB ON. CUE: Switch is in ON COMMENTS: If temperature is 2 90, verifies space heaters 1 A and 1B in Auto. SAT UNSAT Page 3 of10

r CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET \ JPM NUMBER: NRC 8 REVISION: 0 NOTE Following maimenance on the suction piping, the hydraulic pump or extended shutdown, the hydraulic pumps must be filled with oil before starting in order to prevent damage to the pumps.

c) LF: This will be a startup following maintenance on the suction piping, the hydraulic pump or an extended shutdown.

THEN: Perform the following steps to fill the pump (s):

1) Isolate and remove from service the EHC pump (s) per CPS No.1014.01, SAFETY TAGGING.
2) Clean the area around the case vent connection.
3) Fill / verified filled the EHC pump (s) with fluid through the case vent connection located on top of the pump housing. l
4) Re-install the case vent connection
5) Remove the tagout that was installed in step 1.  !
           *d)    Open IC85-FV01, Supply HDR Bypass Valve one-half turn                                       l STANDARD:                                                                                                 .

I Simulates opening IC85-FV01 one-half turn by turning the valve handwheel in the COUNTERCLOCKWISE direction ' l CUE: The valve handwheelis turning. COMMENTS: l SAT UNSAT i i Page 4 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: ' NRC 8 REVISION: 0

            *e)          START Hydraulic Pump 1 A (IB) by placing control switch to RUN.

STANDARD: Simulates placing Hydraulic Pump 1 A control switch to RUN CUE: Switch is in RUN COMMENTS: SAT UNSAT f) Verify pump discharge pressure increases STANDARD. Verifies pump discharge pressure increasing CUE: Pressure is increasing COMMENTS: SAT UNSAT Page 5 of10

   .       _ .        .   . _ ~          _    _ ._          . _ _ _ -_ _ _ . _ .            _.    ._ _       .._

l . . CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 g) g: Motor currei.t > 50 amps, THEN: Shut slightly IC85-FV01, Supply HDR Bypass Valve to reduce motor current amps. I STANDARD. l Checks motor current < 50 amps CUE:  ; Motor current is 40 amps COMMENTS: SAT UNSAT

                'h)    Pressurize system by slowly opening IC85-FV23, Supply HDR Isol Valve, and simultaneously slowly shutting IC85-FV01, Supply HDR Bypass Valve.

STANDARD Simulates simultaneously slowly OPENING IC85-FV23, by turning the valve handwheel in the COUNTERCLOCKWISE direction, and slowly SHUTTING IC85-FV01, by turning the valve handwheel in the CLOCKWISE direction. r CUE: ( For each valve cue, the valve handwheel is turning, then, the valve handwheel has stopped turning. COMMENTS: l; l l SAT UNSAT j l-i . Page 6 of10

                                                      . _ =          ~.
   ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSIIEET JPM NUMBER: NRC 8 REVISION: 0 i) g: Pump discharge pressure is not between 1600 - 1650 psig, TIIEN: Adjust the compensator on the pump as necessary to maintain pressure within the band. STANDARD: Verifies pump discharge pressure is between 1600 - 1650 psig CUE: Pressure is 1625 psig COMMENTS: SAT UNSAT l j) Place Control Switch for Hydraulic Pump not started in AUTO. , STANDARD: i Simulates placing the control switch for Hydraulic Pump IB in AUTO. CUE: Switch is in AUTO COMMENTS: SAT UNSAT Page 7 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 NOTE Step k is not required if the system was started up for testing during a outage or the standby pump is unavailable. k) Perform Section 8.2.5 Testing Pumps Auto Start Features. STANDARD No action. System was started for testing. CUE: COMMENTS: SAT UNSAT NOTE Fuller's Earth Filter System should be in operation as much as possible. l 1) If desired place the Fuller's Earth Filter in service per section 8.2.3. l l STANDARD. No action. j CUE: The Fuller's Earth Filter system will not be put in operation. COMMENTS: SAT UNSAT l Page 8 of10 l 1-

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 TERMINATING CUES: l The 'A' Steam Bypass HPU has been started for testing. 1 1 STOP TIME- l i l

                                                                                                                                           )

l l. i J Page 9 of10

CLINTON POWER STATION , C1 JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 K/A REFERENCE NUMBERS Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RO SRO 241000 A4.06 3.9 Page 10 of10

CLINTON POWER STATION l JOB PERFORMANCE MEASURE OPERATOR COPY THIS IS A CLOSED BOOK QUESTION QUESTION NO.: 1 The plant is operating at full power. The following parameters / indications and trends are observed: Main Generator 950 Mwe Increasing Reactor Power 100 % Increasing Reactor Pressure 1014 Increasing Turbine Control Valves 1-3 Open,4 Partially Open Closing RGLTR ERROR indicating light illuminated MODULE 1(2,3) TRIPPED indicating light on 1H13-P637 illuminated What has occurred to cause this transient? ANSWER: Pressure Regulator failure LOW REFERENCE (S): EHC System System Flow Path

RESPONSE

SAT UNSAT l' Page1ofI

CLINTON POWER STATION .( JOB PERFORMANCE MEASURE OPERATOR COPY

  - QUESTION NO.:                 2 The plant is operating with one of the Steam Bypass & Pressure Control pressure regulators in TEST when the remaining pressure regulator fails HIGH. What is the expected plant response assuming no operator action. Plant pressure begins to decrease due to the Bypass Valves opening.

Follow-up question: What SB&PC control can be used to close the Bypass Valves? l ANSWER: Steam Bypass Valves begin to OPEN causing . Reactor Pressure to Decrease (TCVs should CLOSE in response but the reactor may scram on low pressure in RUN mode) Maximum Combined Flow Limiter REFERENCE (S): EHC System Signal Flow Path

RESPONSE

SAT UNSAT f Page 2 of 1

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY l Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RQ SRO 241000 A2.01 3.7 241000 A2.03 4.2 JTA: TASK NUMBER i ANSWER TIME: Min ORIGINATED / REVISED BY: / l REVIEWED BY: / APPROVED BY: / Supervisor- Requalification and Operations Training l Page 3 ofI

 ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 9 REVISION: 0 TASK TITLE: Respond to a Failed Transponder TASK NUMBER: 011201C529 APPLICABILITY: RO ___ SRO X TRAINEE DATE EVALUATOR METIIOD OF TESTING: Simulated Performance X Actual Performance Classroom Simulator Plant X APPROXIMATE TIME FOR COMPLETION: 45 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor- Operations Approved by: Date: Supervisor - Operations Training Page1of13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET REVISION: 0 JPM NUMBER: NRC9 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues: When you complete the task successfully, the ebjective of this Job Performance Measure will be satisfie SIMULATOR SET-UP CONDITIONS: , Not Applicable. TASK STANDARDS: Rod Drive bypassed, directional control valves disarmed, and RCIS reset per CPS No. 3304.02 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAI1

REFERENCES:

CPS No. 3304.02, ROD CONTROL AND INFORMATION SYSTEM (RCIS) EVALUATOR INSTRUCTIONS: 3 Amplifying cues are provided wifnin the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: Control rod 20-25 in INOP due to a failed transponder card. RCIS is needed to support current plant conditions. The CRS directs you to bypass control rod 20-25 and reset RCIS. START TIME: Page 2 of13

                            ..              CLINTON POWER STATION D

JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED, letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the commer/s section of the JPM. PERFORMANCE STEPS JPM TITLE: Respond to a Failed Transponder NOTE The required position of the control rod / drive is specified in !TS LCOs 3.1.3 and 3.9.4. Only one rod can be bypassed at a time at the RGDC. The bypassed rod's normal drive motion is inhibited when bypassed. 8.2.10.1 IF A failed transponder card is present, ad RCIS is needed to support current plant conditions /surveillances, THEN To prevent inadvertent rod motion when resetting RCIS, a) First: Perform section 8.2.10.3 to electrically disarm the directional control valve. b) S_e.cond; Perform section 8.2.10.2 to bypass the drive's transponder card & reset RCIS

                                                          ,            .                            Page 3 of13
       --        . - - .       ..- --                              .     . - = . - -    --          .--               . _ . . .

CLINTON POWER STATION , l JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC9 REVISION: 0 NOTE Electrically disarming a second INOP control rod will shut down RCIS. l 8.2.10.3 To electrically disarm the directional control valves of the subsequent INOP control rods l as governed by ITS LCO 3.1.3, or for Transponder Card Failures:

                     *a) Remove the amphenol connectors, and place CAUTION TAGS on the directional                              I control valves disconnected at the transponder card (CNMT 755') for the INOP                          j control rod drive (s):                                                                                I e JIE(insert exhaust)                                                                                 l e JWE (withdraw exhaust) l                          e JWS (withdraw supply)
e JIS (insert supply) '

l l l STANDARD , i l Simulates opening cover on transponder card box and removing amphenol connectors JIE, JWE, JWS, j and JIS. Simulates placing Caution Tags on the directional control valves. l  ! l l CUE: , i 1 l Amphenol connectors are removed and caution tags placed. . l l COMMENTS: If desired, use picture and drawing of the inside of the transponder card box. SAT UNSAT i l l l i i Page 4 of13 4

CLINTON POWER STATION  ! i JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 b) To restore the drive when the control rod is OPERABLE: (OK to defer while continuing on in procedure):

1) Clear CAUTION TAGS
2) Reconnect the amphenols to the transponder card.

STANDARD: Continues to 8.2.10.2 CUE:

     ' COMMENTS:

SAT UNSAT 8.2.10.2 To bypass the directional control valves for the first INOP control rod, or for Transponder Card failures: l

  • a) Locate the drive to be disarmed / bypassed on the Rod Gang Drive Cabinet (RGDC)

Fault Map Legend. Transponder card faulure location will have an illuminated l area for the Transponder that has a fault. L l STANDARD. Locates rod 20-25 on RGDC Fault Map Legend. CUE: After rod identified, cue that area is illuminated. If the wrong rod is identified, cue that the area is NOT illuminated. COMMENTS: SAT UNSAT 4 1 Page 5 of13

CLINTON POWER STATION , , JOB PERFORMANCE MEASURE WORKSHEET I JPM NUMBER: NRC9 REVISION: 0 i

  • b) Using the legend data on the right and bottom of the legend, identify the binary values for the drive to be disarmed / bypassed. .

I STANDARD: I l Identifies the binary values for rod 20-25 IDENTIFIED: . CUE: ACTUAL: 00111 ,01000 COMMENTS: l 1 SAT UNSAT l l l

  • c) On the analyzer card of the RGDC, set the ten BYPASSED ROD IDENTITY 1 TOGGLE SWITCHES (1 = Switch up,0 = Switch down) using the binary values .

found on the Fault Map Legend. STANDARD: Simulates setting toggle switches either up or down in accordance with the binary value determined from the Fault Map Legend X4 X3 X2 XI X0 Y4 Y3 Y2 Y1 Y0 l CUE: l Toggle switch up (or down) 0 0 1 1 1 0 1 0 0 0 D D U UU D U D D D l COMMENTS: l l SAT UNSAT f Page 6 of13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: O d) Have a second licensed operator verify that the correct rod identity is selected. i STANDARD: Requests that a second licensed operator verify the correct rod identity is selected. 1 CUE: I acknowledge that you would have a second licensed operator verify the rod selection but as an evaluator I cannot verify that selection. i COMMENTS: I 1 SAT UNSAT l

  • e) Position the rod BYPASS toggle switch "up" to bypass the rod.

i j STANDARD: Simulates placing the rod BYPASS toggle switch "up" CUE: Switch is UP COMMENTS: I SAT UNSAT I Page 7 of 13 l

CLINTON POWER STATION JOB PERFORNANCE MEASURE WORKSHEET JPM NUMBER: NRC 9 REVISION: 0 f) Reset RCIS per 8.2.9.3 and 8.2.9.4 8.2.9.3 To reset RCIS a) Verify POWER GATE breaker CB2 is ON. If found to be OFF, then with SS/ ASST.SS permission, place breaker CB2 to ON. System configuration may need to be checked per 5.0 Prerequisites. STANDARD. Verifies POWER GATE breaker CB2 is ON. CUE: If breaker is OFF, then as SM/CRS cue that CB2 can be CLOSED or taken to ON. COMMENTS: If Power Gate breaker is OFF and the operator has to switch to ON, step becomes critical. SAT _ UNSAT

  • b) Depress the RGDS STATUS INOPERATIVE RESET pushbutton in 1H13-P653 until the INOPERATIVE, SCAN ERROR, and MASTER ERROR lights extinguish.

STANDARD, Simulates depressing RGDS Status Inoperative Reset pushbutton. CUE: Inoperative, scan error, and master error lights are extinguished. COMMENTS:

SAT UNSAT l i i

Page 8 of13

CLINTON POWER STATION. l JOB PERFORMANCE MEASURE WORKSHEET L l JPM NUMBER: NRC9 REVISION: 0 l l 1 I I i c) IE RCIS does pg properly RESET after the initial attempt in 'b' l above, THEN ~ Wait ~ 20 seconds before trying to RESET the system a second blow. 8.2.9.4 After RCIS has been reset, perform an OD-7 Option 2 (or Option 4) and compare to previous rod position information. STANDARD: Requests an OD-7 Option 2 l CUE: Rod positions have been compared to previou., rod position information. l' i COMMENTS-SAT UNSAT l l g) Depress DRIVE BYPASSED pushbutton to display on the OCM that the correct rod l was bypassed.. STANDARD. Simulates depressing Drive Bypassed pushbutton CUE: OCM display indicates the correct rod. l~ COMMENTS: l SAT UNSAT Page 9 of13

l CLINTON POWER STATION , l l JOB PERFORMANCE MEASURE WORKSHEET

                                                                                                           -1 JPM NUMBER: NRC9                                                          REVISION:         0 l

CAUTION In GANG mode, selecting / moving a rod in the same gang will cause the bypassed rod to move also. If GANG mode is used for any reason extreme caution should be used to avoid moving the bypassed rod. h) Place CAUTION TAGS to maintain the DRIVE MODE select push-button in the " INVALID DRIVE" position, and provide information about the possible effect of using gang mode.. , I STANDARD. Simulates placing Caution Tags on Drive Mode select pushbutton. CUE: i Caution Tags are hung  ! COMMENTS: SAT UNSAT i i Page 10 of 13

r i

l. ,  !

CLINTON P0WER STATION JOB PERFORMANCE MEASURE WORKSHEET l  ; i JPM NUMBER: NRC 9 REVISION: _0 i) To restore the drive when the control rod is OPERABLE (OK to defer while , I continuing onin procedure.

1) Clear CAUTION TAGS. ,

f

2) . At the RGDC, position the rod BYPASS toggle switch,"down" to unbypass the rod.

3)' On the analyzer card of the RGDG, set the ten BYPASSED ROD IDENTITY toggle switches to the"down (0) position.

4) Depress DRIVE BYPASSED push-button to display on the OCM that the rod in no longer bypassed.

STANDARD: No action required

    ~ CUE:

Drive will not be restored. COMMENTS: l SAT- UNSAT TERMINATING CUES: Control rod 20-25 is bypassed and RCIS is reset. STOP TIME: l l l Page 11 of13

i L CLINTON POWER STATION 1 JOB PERFORMANCE MEASURE WORKSHEET [ l JPM NUMBER: NRC9 REVISION: 0 K/A REFERENCE NUMBERS . I Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO  ; 201005 A4.01 3,7 l l i l i i i L Page 12 of 13

CLINTON POWER STATION l JOB PERFORMANCE MEASURE l OPERATOR COPY l QUESTION NO.: 1 A reactor startup is in progress. During the performance of CPS No. 9014.02, ROD PATTERN CONTROL SYSTEM ROD SEQUENCE CHECK, an out of sequence control rod was selected and ) moved one notch. What is the effect on the reactor startup?  ! l ANSWER: , l The reactor stanup must stop immediately due to the Rod Pattern Controller not performing its intended ! function. Rod movement is ONLY by scram. REFERENCE (S): CPS No. 9014.02 CPS ITS 3.3.2.1 Action B.1 1

RESPONSE

I SAT UNSAT Page1of1

CLINTON POWER STATION LOB PERFORMANCE MEASURE OPERATOR COPY THIS IS A CLOSED BOOK QUESTION QUESTION NO.: 2 l l What affect does bypassing a control rod in the Rod Gang Drive System have on the ability to move the j bypassed control rod, individually and in gang mode? I l ANSWER: The bypassed control rod if selected will not move. (The RCIS System does not know 1 the control rod is even there) If gang mode is selected and another control rod in the gang is selected the bypassed control rod will move with the rest of the gang: l REFERENCE (S): CPS No. 3304.02 l

RESPONSE

SAT UNSAT i 4 l l Page 2 of I r

CLINTON POWER STATION , JOB PERFORMANCE MEASURE OPERATOR COPY Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RQ _ SRO s 201005 K3.02 3.5 l 201005 Kl.06 3.3 , l l l JTA: ) TASK NUMBER i l ANSWER TIME: Min ORIGINATED / REVISED BY: / REVIEWED BY: / APPROVED BY: / Supervisor- Requalification and Operations Training l l Page 3 of1

o CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSIEET i JPM NUMBER: NRC 10 REVISION: 0 TASK TITLE: Respond To Abnormal Level in CCW Expansion Tank

TASK NUMBER
044208C505 APPLICABILITY: RO ___ SRO X i

I TRAINEE DATE EVALUATOR l METHOD OF TESTING: Simulated Perfonnance X Actual Performance l Classroom Simulator Plant X APPROXIMATE TIME FOR COMPLETION: 15 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: , Supervisor - Operations Training l l [ Page 1 of 9

                                                                                                            ^

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC 10 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiatmg cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: l None TASK STANDARDS: Operator actions performed per CPS No. 3203.01 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: < None PROCEDURAIJ

REFERENCES:

CPS No. 3203.01, COMPONENT COOLING WATER (CC) EVALUATOR INSTRUCTIONS: Amplifying cues are provided w; thin the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: There is a high level in the CCW Expansion Tank. The source of the in-leakage has been isolated. The CRS directs you to locally return CCW Expansion Tank level to normal. START TIME: i I Page 2 of 9

i 4

                     ,                     CLINTON POWER STATION
 .                   O JOB PERFORMANCE MEASURE WORKSHEET                                               j l

l JPM NUMBER: NRC 10 REVISION: 0 PERFORMANCE IfiFORMATION I Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step canstitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS l JPM TITLE: Respond To Abnormal Level in CCW Expansion Tank

       *8.2.2.2.1      Verify ICC90, CCW Expansion Tank Makeup Valve, is isolated and ICC092, CCW Expansion Tank Makeup Valve Bypass, is shut.

STANDARD. Verifies ICC90 is isolated by simulating turning valve handwheels for ICC089 and ICC091 in a  ! CLOCKWISE direction. Verifies ICC092 shut by simulating turning valve handwheelin a CLOCKWISE direction. i CUE: For each valve operated, cue that the valve handwheel is turning, then cue the valve handwheel stops turning. COMMENTS: SAT UNSAT Page 3 of 9 l

CLINTON POWER STATION [:. JOB PERFORMANCE MEASURE WORKSHEET

         < JPM NUMBER: NRC 10                                                            REVISION:       0 8.2.2.2.2      Notify Radiation Protection to check valve lineups on IRIX-PR037, IRIX-PR004, and                  ;

1RIX-PR005, if source ofinleakage unknown. l l i STANDARD: No action. Initial Conditions had the source isolated. CUE: COMMENTS: I SAT UNSAT i NOTE If necessary, place alternate system load on service, whenever possible. 8.2.2.2.3 If source ofinleakage is unknown, isolate CCW to the system loads one at a time '.o determine the source ofinleakage. See Appendix A, CCW SYSTEM LOADS. STANDARD. No action. Initial Conditions had the source isolated. CUE: COMMENTS: SAT UNSAT l Page 4 of 9

l CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET I l JPM NUMBER: - NRC 10 REVISION: 0 i NOTE When the source ofinleakage is isolated, the CCW Expansion Tank level should stabilize.

     '8.2.2.2.4    Lower CCW Expansion Tank level as follows:                                                 I a) Open ITE083, CCW Exp Tk Drain b) Throttle open ICC253, CCW Expansion Tank Auto Drain Valve to lowerlevel                 ,

to 105" to 117" l l STANDARD Simulates OPENING ITE083 by turning handwheel in the COUNTERCLOCKWISE direction. Simulates throttling OPEN ICC253 by turning handwheel in the COUNTERCLOCKWISE direction. CUE: For each valve operated, cue that the valve handwheel is turning. For ITE083, cue the valve handwheel stops turning. l COMMENTS: ) SAT UNSAT l l i Page 5 of 9 l l

                        .      .               CLINTON POWER STATION a.

l JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0

          '8.2.2.2.5      When desired levelis reached a) Close ICC253, CCW Expansion Tank Auto Drain Valve b) Close ITE083, CCW Exp Tk Drain STANDARD:

Contacts MCR to monitor expansion tank level. After receiving cue that level is 115", simulates closing ICC253 and ITE083 by turning valve handwheels in the CLOCKWISE direction. CUE: As operator in the MCR, cue that level is 115". For each valve operated, cue that the valve handwheel is turning then the valve handwheel has stopped. COMMENTS: May monitor level on expansion tank sightglass l SAT _UNSAT. i 8.2.2.2.6 Check pump suction pressure, adjust per 8.1.1.1.b, if necessary. , l l STANDARD. Checks pump suction pressure by observing idle pump discharge pressure. Determines that no adjustment is necessary. CUE: COMMENTS: idle pump discharge pressure should be approximately 14 psig. SAT UNSAT Page 6 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 1 8.2.2.2.7 If possible, leave the component that is the source ofinleakage off service and isolated, untilit is repaired. l STANDARD: No action. l CUE: The component will be left isolated until repaired. COMMENTS: SAT UNSAT TERMINATING CUES: CCW Expansion Tank level has been returned to normal. STOP TIME: l l i l Page 7 of 9 l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET I l JPM NUMBER: NRC 10 - REVISION: 0 K/A REFERENCE NUMBERS l Imoortance Ratina K/A SYSTEM NUMBER K/A NUMBER RO SRO 400000 A4.01 3.0 r I i

Page 8 of 9 I

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY QUESTION NO.: 1 The plant is in the power ascension program and currently at 75% power. The following parameters are noted: CCW Outlet Pressure 96 psig Steady CCW Outlet Temperature 110 F Increasing Condenser Vacuum 27 inches Decreasing What option will be available for LONG TERM RPV pressure control? ANSWER: Only SRVs on compressed gas will be available REFERENCE (S): CPS No. 4004.01 CPS No. 3203.01

RESPONSE

SAT UNSAT - l l l

                              .                                                               Page1ofI l

t CLINTON POWER STATION I. JO'8 PERFORMANCE MEASURE OPERATOR COPY QUESTION NO.: 2 The plant was at 100% power when 4.16 KV Bus IB locked out due to an overcurrent condition. The loss of the 4.16 Bus IB results in a trip of the reactor feed pumps with the resulting level transient. Level decreases below level 2 before recovering. Based on this transients effect on Component Cooling Water (CC), what system / component loss will occure if NO operator action is taken? ANSWER: Trip of the running Service Air Ccmpressor.

    ~ REFERENCE (S):

CPS No. 5041.01-1 A

RESPONSE

SAT UNSAT l l 1 l l Page 2 of1

                                     .           . = -      .   . - . - . . . .    . . . _ - .      - . .

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY Importance Rating K/A SYSTEM NUMBER K/A NUMBER RQ SRO 400000 K3.01 3.3

400000 A2.01 3.4 JTA:

TASK NUMBER ANSWER TIME: Min ORIGINATED / REVISED BY: / REVIEWED BY: / APPROVED BY: ,

                                                                    /

Supervisor- Requalification and Operations Training i i l i Page 3 of1

4-.u.,, s ..a r. Sa , n .- a > - *w+- a sa =--<-a-- . - - -a --- tawa---~ == = . - - +,u._ --a2A -i A.+..e- *-.s.#.4 a 4.-.A j. INITIAL SUBMITTAL OF OUTLINE AND WALKTHROUGH JPMS FOR CLINTON RE-EXAMINATION THE WEEK'OF 08/31/98 l r I i l , t L ' 1 l l l l l l  ! ! l l I i l

                                                                                                                                                  \

I' 1 i s l l 6 6 l L -.

    .             _                _    ._          .-         _ _      __     _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . _ . _ _ . _ _ - ~ .

I ES-301 Individual Welk-through Test Outline Form ES-301-2 Facility: Clinton Date of Examination: _ September 1.1998_ - s Exam Level (Circle): RO / SRO(l) / SRO(U) Operating Test No.: 98-02 System /JPM Title / Type Codes

  • Safety Planned Follow-up Questions-Function K/A/G //Importance // Description 1 I

1.202001/ Start RR Pump Ain Slow 1 - Reactivity Cont. a. A2.10 - 3.9 - Seal Faile.] i D,S,L b. K4.17 - 3.5 - Fast Speed Pump Start 1 2.209002/ManuallyInitiate HPCS 2-Inventory Cont. a. K6.01 - 3.6 - Loss of Electrical Power l D, S b. G2.1.14 - 3.3 - Sys. Status Req. Notification l

3. 223001/Emerg. S/U Standby DWC 5- Cont. Integrity a. K6.11 - 3.0 - Loss of Electrical Power i

D, S b. G2.1.12 - 4.0 - Not Qualified Equipment l 4.264000/ Manually Start DG 1A 6- Electrical a. K4.08 - 3.7 - Automatic Startup D,A,S b. G2.1.12 - 4.0 - T.S. Requirements 5.239001/ Equalize Around and Open 3 - Pressure Cont. a. A2.03 - 4.2 - MSIV Closure MSIVs - l i D,S,L b. K4.01 - 3.8 - Automatic Isol. of Steam Lines 4

6. 217000/ Shutdown RI-Init.Sig. 4-Heat Removal a. A2.01 - 3.7 -Initiation Signal l Clear  !

l N, S b. A2.17 - 3.4 - High Suppression Pool Lvl. 7.261000/ Purge PC Using VG 9-Rad Release a. K4.01 3.8 - Auto System Init. j l i N, S b. K6.04 - 3.1 High Rad. Response

8. 241000/Startup Steam Byp. HPU a. A2.01 - 3.7 - Pressure Reg. Failure 3- Pressure Cont.

N,P,R b. A2.03 - 4.2 - Failed Open BPV 9.201005/ Respond to a Failed 7 Instrumentation a. K3.02 - 3.5 - Effect on Reactor S/U l- Transponder N, P b.K1.06 - 3.3 - Bypassed Rod in Gang i i 10.400000/ Respond to Abn. Levelin 8- Plant Service a. K3.01 - 3.3 - Loads Cooled by CCW CCW Exp. Tk.. l N,P,R b. A2.01 - 3.4 - Loss of CCW Pump

        - Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)ltemate path, (C)ontrol room, (S)imulator, (L)ow Power,(P)lant,(R)CA e

V -

i

      /  ,
                                                  - ES-3011ndividu11 Wilk-through Test OutlineForm ES-3012                                            !

l t' Facility: Clinton Pc" r C+atian Date of Examination: Januarv 19.1998 Exam Level (Circle)! Q/ SRO() Operating Test No.: 98-01 .;

                                                                                                                                                      ?

i System / JPM Title / Type Safety Planned Follow-up Questions: Codes

  • Function K/A/G / Importance / Description 7
1. 295031 RCIC/Defeatisolation 4. Emergency. a. 217000/ K6.01/ 3.4 // Electrical Power Plant Evolutions D, P b. 217000/A1.05/3.6/RCIC Turbine Speed 2.241000 EHC/ Respond to low
3. Pressure a. K1.10/3.0/ Front Standard Trip System l pressum

, Control  ! D, P, R - b. K1.20/2.7/ Turbine Speed

3. 286000 Manual Start of the  !
8. Plant Service a. K4.03/3.3/ System Design Diesel Fire Pump Systems D P,R b. K4.01/3.4/ System interrelationship
4. 259002 FW/ Operate SULCV 2. Reactor Water a.K4.12/A5.03/3.8/ Operate components in Inventory manual D,S,L Control b. K1.02/A2.01/3.5/Cause and Effects 5.295016 RSP/GPC 5. Suppression
a. AA2.06/3.3/Cooldown Rate Pool Cooling  :

Mode y D,S A b. AK2.02/4.0/ Local control stations  ;

6. 202001 Normal S/D of RR 1. Reactivity a. K4.02/3.1/ Adequate recirculation pump pumps Control NPSH D, S b. A1.08/3.7/Recirc FCV Position r

7.217000 Manual start of LPCS 4. Cormal a. K4.03/3.3 Naive Operation { Plant Evolutions  ! M S,A b. K1.10/3.7/ System Interiocks

8. 288000 Shift VR Supply and 9. Radioactivity a. K4.01/3.7Nent Interlocks Exhaust Fans (Auto Operation) Release M,S,A b. A3.01/3.8/ System Operations
9. 300000 lA/ Pressurize - a. K3.02/3.3/ Loss of Air
8. Plant Service DW/ Containment air headers Systems i

D, S b. K4.02/3.0/ Interlocks i 10,264000 Manually Shutdown a 6. Emergency a. A2.09/3.9/ Loss of AC power i DieselGenerator Generators l N, S b. K4.02/4.1/ Generator Trips  ?

                    - Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)ltemate path, (C)ontrol room, (S)imulator, (L)ow Power, (P)lant, (R)CA                                                                                         '

i t-

e

 -/                  ES-301                           Individuil Wclk-through Test Outlins                                                 Form ES-301-2 h

Facility: Clinton Power Station Date of Examination: January 19.1998 l Exam Level: SRO(U) Operating Test No.: 98-01 i I System / JPM Title / Type Safety Planned Follow-up Questions: Codes

  • Function K/A/G / Importance / Description  ;

i i

1. t

! 2.241000 EHC/ Respond to low -

3. Pressure a. K1.10/3.0/ Front Standard Trip System 1- pressure Control D,P,R b. K1.20/2.7/ Turbine Speed
2. 286000 Lineup FP (Fire
8. Plant Service a. K4.03/3.3/ System Design Protecbon)Injechon Flowpath to Systems the RPV D,P R b. K4.01/3.4/ System Interrelationship
4. 259002 FW/ Operate SULCV 2. Reactor Water a.K4.12/AS.03/3.8/ Operate components in inventory manual ,

D,S.L Control b. K1.02/A2.01/3.5/Cause and Effects l 5.295016 RSP/SPC 5. Suppression a. AA2.06/3.3/Cooldown Rate Pool Cooling Mode D S,A b. AK2.02/4.0/ Local control stations

6. 202001 Normal S/D of RR 1. Reactivity a. K4.02/3.1/ Adequate recirculation pump pumps Control NPSH D, S b. A1.08/3.7/Recire FCV Position
                       - Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)ltemate path, (C)ontrol room, (S)imulator, (L)ow Power, (P)lant, (R)CA n

t j. l l I

                                                                         . . . _ .                                 .                         .,.           , = . .

d e. , Illinois Power Company Chnton Power St1 tion j j P.o Box 678 g fljlg Chnton IL 61727 Tel 217 935-8881 j ILLINSIS Joseph V. Sipek R o><ector - '>censino an ==. camp.ny 1A.120 July 31, 1998 Docket No. 50-461 Mr. Melvyn N. Leach, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60632-4351

Subject:

Initial Licensed Operator Examination Materials

Dear Mr. Leach:

The Clinton Power Station (CPS) Initial Licensed Operator examination materials for Mr. JeffNaden are in the attached envelope. The examination materials are submitted in accordance with the guidance in Interim Revision 8, NUREG-1021, ,

           " Operator Licensing Examination Standards for Power Reactors," and your letter of May 12,1998. E ' examination materials shall be withheld from public disclosure until after the examiutioss are complete.

Please direct questions concerning the CPS Initial Licensed Operator Examination to Mr. Dale Hill at (217) 935-8881, extension 4135. Sincerely yours, J se h V. i ek irector-Licensing BGS/krk

, 4 .. , U-603057 Page 2 l cc:(without attachments) Clinton Licensing Project Manager, Region III, USNRC NRC Resident Office, V-690 Regional Administrator, Region III, USNRC Illinois Department ofNuclear Safety l l l l i i i I I ~i i i l l l I l , 1

i o

               .                                     CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1                                                               REVISION:   0-TASK TITLE: Start Reactor Recirculation Pumn "A" in Slow Speed TASK NUMBER: 011202C004 APPLICABILITY:RO X SRO X TRAINEE                                                         DATE EVALUATOR METlf0D OF TESTING:

Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 15 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: Supervisor - Operations Training I Page1of14

[

      .                                      CLINTON POWER STATION i                                  JOB PERFORMANCE MEASURE WORKSHEET l

I l JPM NUMBER: NRC1 REVISION: 0 , i READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. l When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: ) i Initialize to an IC at approximately 30% power. Shutdown the "A" RR pump by opening the CB1, CB2, CB3 and CB4 breakers and closing the FCV to minimum. Lockout the "A" FCV and restart the "A" RR HPU from the instructor console. Verify the Cavitation Interlock lights on P680 are both ON or both OFF. TASK STANDARDS: Reactor Recirculation Pump "A" is running in slow speed. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3302.01, REACTOR RECIRCULATION, section 8.1.1 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: The plant is operating at approximately 30% power in single loop. The "B" loop is operating. The "A" RR pump is stopped and the "A" RR loop is unisolated. Startup the "A" Recire Pump in slow speed per section 8.1.1 of CPS 3302.01. START TIME: Page 2 of 14

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Start Reactor Recirculation Pump "A"in Slow Speed 8.1.1.1 (Local) Unless checked during drywell close-out, check RR pump motor oil levelsif the drywell is accessible. Reference MS-08.00 for proper RR Pump A(B),1B33 C001 A(B) oil level determination criteria. , 8.1.1.2 (Local) Verify open ICIl-FO26A(B), CRD Supp Iso! To RR Pump A(B) and verify CRD supply to the RR pump seals is 3-5 gpm on flowmeter 1Cl1-D020A(B). If required, adjust ICI1-D012A(B), Flow Control Valve to obtain 3-5 gpm. Flow regulator, ICIl-D012A(B) is used to adjust flow as follows (per K2801-0009): [CNMT755' AZM 189 ]. a) Loosen locknut and rotate stem until desired flow is attained. (Clockwise for decreasing flow, counter-CW for increasing flow) b) Lock stem in desirecL position by holding stem steady whil re-tightening locknat. STANDARD: Directs Area Operator to verify CRD flow to RR pump "A" seals at 3-5 gpm. CUE: Flow is 4 gallons per minute. COMMENTS: SAT UNSAT Page 3 of 14

CLINTON POWER STATION JOB PERI ORMANCE MEASURE WORKSHEET

    'JPM NUMBER: NRC1                                                                    REVISION:      0 NOTE When : tarting pumps at low power / low feed flow conditions, the white light above the Cavitation Interlocks switch will stay on and the pumps will start in slow speed.

8.1.1.3a). Zero the A/B loop SERVO ERROR STANDARD: I Adjusts so Servo Erro meter indicates 0% on P680 CUE: l COMMENTS: I SAT UNSAT 8.1.1.3b) Depress following reset buttons to i: lear interlocks / alarms:

1) FCV A/B Motion Inhibit Reset Verify the lead HPU becomes operational, and FCV motion is longer inhibited.
2) Pump A/B Vibration Reset. .
3) Cav Intik A/B Reset / Rx Run Back Reset.
4) Low LevelIntik A/B Reset
   . STANDARD:

Depresses "A" Motion Inhibit reset pushbutton and observes WHITE light OFF. Depresses "A" Vibration reset pushbutton. l Depresses "A" Cavitation Interlock pushbutton. I Depresses "A" Vessel Low Level pushbutton and observes WHITE light OFF CUE: COMMENTS: Cavitation interlock will not clear when feedwater flow is less than 30%. SAT UNSAT Page 4 of14

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 8.1.1.4 Verify RWCU system in operation with flow established through bottom head drain line to obtain a reliable indication of bottom head drain coolant temperature. STANDARD: t Verifies RWCU system in operation with flow established through bottom head drain line. CUE: COMMENTS: SAT UNSAT i

        '8.1.1.5       Within 15 min. orior to starting the A(B) RR pump, Verify following ITS SR 3.4.11.3/4 temperature limits and GEK-75635A Thermal Shock limits (use table below for data point locations) are met, and log data in the MCR Journal.

a) Difference between bottom head coolant temperature and the RPV coolant temperature is s 100 F. (ITS/GEK) b) Difference between the RPV coolant temperature in the RR loop to be started and  ; the RPV coolant temperature is s 50 F. (ITS/GEK) c) Difference between idle RR loop to be started and the other RR loop is s 50 F. (GEK 75635 only: verifies Bkr 5A(5B) Thermal Interlock item satisfied. j l l l l Page 5 of 14 l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 RPV Coolant Bottom Head RPV Coolant Temperature - Coolant Temperature Temperature in the RR Loop to be Started MODES 3/4 with RHR SDC in operation: Use RHR Hx inlet temperature from recorder E12-R601 at lH13-P601 MODES 2-4 with RR 1000 in Use Point 4 (Bottom Head Drain Use RR pump suction operation and RHR SDC Temp) on recorder IB21-R643 at temperature for the idle RR loop secured: 1H13-P614, o_r computer points from recorder B33-R604 at Use Recirc Pmp A/B Suction B22DA002/017 (valid when > 1H13-P614. Temp from B33-R604 at 1H13- 214F). P614.- MODES 1-3 with Rx coolant > 714*F: Use Steam Dome Temperature computer point B21NA006. STANDARD: Verifies s 100 F difference between bottom head and RPV coolant Verifies s 50*F difference between "A" RR loop and RPV coolant

 . Verifies s 50 F difference between "A" RR loop and other loop CUE:

COMMENTS:

 - May simulate logging information in CRO log.                                                         1 SAT            UNSAT                     j l

Page 6 of 14

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 8.1.1.6 Verify annunciators 5003-2C/2J, Recire Pmp A/B Temp Intlk Actuated are extinguished (verifies GEK-75635A Bkr 5A(5B) pump start loop to loop thermal interlock in effect) (annunciator only valid when > 214*F.) STANDARD: Verifies annunciators 5003-2C/2J are extinguished. CUE: COMMENTS: SAT UNSAT

  • 8.1.1.7 Place IB33-F060A(B), Recire FCV in minimum open position. )

STANDARD-l Verifies "A" Flow Control Valve in minimmn open position. CUE:' COMMENTS: 1 SAT UNSAT I Page 7 of 14

    .       .-m. m _ . . . . . _ _ . _ . . . _ . - _ . . . _ _ . _ _                    - _ . _ _ _ . _ _ . . _ _ _                  ._.- . _. _

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKS!!EET l

       'JPM NUMBER: 'NRC 1                                                                             REVISION:            0               ._

i 8.1.1.8 Verify CRD supply and seal staging flow has been in operation for at least one hour prior

                          - to pump start to ensure pump seals are vented.

STANDARD: 1

      ~ Requests information for CRS CUE:

It has been I hour. l COMMENTS: i SAT UNSAT , i CAUTION

                                                                                                                                                   ]

Do nqt simultaneously start bc J.: P R pumps. I

           '8.1.1.9         Close f he following P680 breakeis in order:

a) Recire Pump A(B) Mtr Bkr 3A(3B). b) Recirc Pump A(B) Mtr Bkr 4A(4B). STANDARD: Closes. 3A then 4A breakers and observes RED light ON for e .ch breaker. . CUE: i

      ' COMMENTS:

i The annunciator RECIRC PMP A MTR BRKR TRIP will clear. 1 SAT UNSAT l 1 i l l Page 8 of 14

, _ . . _ . - . . . _ . .___..._.m.- _ . . . _ _ . . - . . _ _ _ - _ _ _ _ _ . _ _ . . . _ _ _ _ .. 4 CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET ? t t JPM NUMBER: NRC1 REVISION: 0 4 1 4 NOTE I If FW flow is < 30% (~ 3.74 mlbm/hr, then: ! a) RR pump will accelerate on the 60 cycle source. i j bi The I A(1B) breaker will close at the same time the SA(5B) breaker

                             -cfoses L                               c) When pump speed is > 95% (1691 rpm), the SA(5B) breaker will close

. d) When pump speed drops to 20-26% (356 - 463 rpm), the 2A(2B) breaker i will close. I p If FW flow is > 30% (~ 3.74 mlbm/hr), then RR pump speed will accelerate j directly to 100% (1780 rpm).

8.1.1.10 . Notify security that perimeter lighting may go out for ~ 2 to 6 minutes due to the pump
start 1_

i STANDARD: I

      ~ Requests that security be notified.

l i' CUE: l 5 [ ' It is daylight and the pump will only be started in slow speed. 1 COMMENTS: . g SAT UNSAT  ! l .. I l' \ t A L  ; ? i 4 Page 9 of 14

                                                                                                       ,,,  . , . . . -       y ,.          ,,        m - --

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1 REVISION: 0 . 8.1.1.11 Monitor reactor power and RPV water level during the starting of a RR pump.

     '8.1.1.12    Start RR pump A(B) by closing Recire Pump A(B) Drive Motor Ukr SA(SB).

STANDARD: Closes RR pump "A" 5A breaker and observes RED light ON, pump amps and loop flow increasing. Monitors reactor power and RPV water level during pump start. CUE: COMMENTS: SAT UNSAT 8.1.1.13 If RR pump startup was directed from section 8.2.6, Idle RR Loop - restart (step 8.2.6 6), return to step 8.2.6.7. Otherwise continue in this section. STANDARD: Continues in this section CUE: COMMENTS: SAT UNSAT Page 10 of 14

  - . -- .-             - ~ . . - . .              - . . _ - . ~ . . . - . . . - . - ~ . . - . - - - . . -             . - . - .  -. .. ..

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET 1 JPM NUMBER: NRC1 REVISION: 0 NOTE A 40 sec incomplete sequence timer starts when the CB-5 breaker is closed. If after 40 sec, pump speed is not 20-26% or CB-2 is not shut, the ' incomplete sequence relay will trip CB-1 & CB-5.

                *8.1.1.14         After the RR pump is in service on the LFMG, open the FCV to full open position.

OK to inhibit FCV motion per CPS No. 3302.02, REACTOR  ; RECIRCULATION FLOW CONTROL HYDRAULIC SYSTEM while in slow speed RR pump operation to prevent inadvertent FCV runbacks. OK to restart RR HPUs per CPS No. 3302.02 after a short shutdown. i STANDARD: Opens "A" recire loop FCV to full open. - CUE: COMMENTS:  : SAT UNSAT 1 I l . l 9 l Page11of14 l

CLINTON POWER STATION  ; 1 JOB PERFORMANCE MEASURE WORKSHEET j I JPM NUMBER: NRC1 REVISION: 0 8.1.1.15 Monitor Table 1, RR Pumn Seal Key Parameters. (page 26). If they approach or reach l the maximum allowable, corrective action should be taken.  ! STANDARD: i 1 i As a minimum seal staging pressure, Cooling Water (CCW) temperature, and injection water I temperature should be checked. CUE: COMMENTS: I SAT UNSAT l 1 I i i Page 12 of 14

      . . . _ . . _ . . . _ _- ~. . _ . _ - . .           . . . . _ _   . _ . _ . _ . = _ _ . _ . _ . _ _ - _                      . _ _ _ _ . _ . _ .
      .                                                CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC1                                                                                        REVISION:       0                        l TERMINATING CUES:

Reactor Recirculation Pump "A" is running in slow speed. STOP TIME: i 'l i Page 13 of 14

CLINTON POWER STATION JOB PERFORMANCE MEASURS WORKSHEET

 'JPM NUMBER: NRC1                                              REVISION:           0 K/A REFERENCE NUMBERS Importance Ratina K/A SYSTEM NUMBER                        K/A NUMBER                 RO              SRO.

t l J i i I Page 14 of 14

                                      ' CLINTON POWER STATION JOB PERFORMANCE MEASURE                                                                 i OPERATOR COPY                                                                  I i

QUESTION NO.: 1 i You are the CRS on shift with the plant operating at near rated conditions for the past several weeks. > i The reirc pumps are operating at Fast Speed with the Flow Control Valves at 96 and 92% respectivally. The recire pump seal pressures have been reading in the normal range,  ;

                           "A"                                                 "B" Seal 1 dP                 1020 psig                                         .1015 psig Seal 2 dP                  510 psig                                           500 psig Seal I cavity '            115 F'                                             115 F Seal 2 cavity.             125 F                                              125 F                                        :

The A CRO informs you that in the last hour that the "A" RR pump seal I cavity temperature has increased 5 F and that the "B" seal I cavity shows no temperature change.

 .What actions should or should not be taken?

ANSWER: IF RR Pump Seal Key Parameters exceed any ' Abnormal Value' listed in Table 1, , THEN Direct NSED to prepare an evaluation to determine if continued plant operation n j warranted. REFERENCE (S): CPS No. 3302.01 Step 8.3.1.5  ! CPS No. 3302.01 Table 1 1 1

RESPONSE

l l 4 SAT UNSAT I i l 1 j i Page 1 of 3 i

   .                                      CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY QUESTION NO.:                  2 The plant has been in a long outage due to recire pump problems. The plant is currently operating at approximately 40% power with the Recirc Pumps in Fast Speed. The A CRO reports that all indications look good and are all in specifications. Two hours later, the A CRO reports that annunciator 5067-2K is alarming (Loose Part Monitoring Sys Trouble). When the alarm panel is checked, the channel 3 light is blinking with 3 other lights steady lit. (Channel 3 is A Recire Pump Suction). The B CRO states that he hasjust checked the lower thrust bearing temperature on the A RRP and it has increased 20 F and that the upper thrust bearing temperature has decreased 15*F. Also the Seal cavity 1 has just had a pressure increase.

What is a possib'e cause and what actions will you take. ANSWER: The possible cause is a failure of the upper wear ring bolts on the A RR pump. (This results in the upper wear ring coming loose from the stuffing box and falling into the upper impeller region. The upper area then equalizes with the pump discharge pressure and overcomes the normal up thrust of the pump, causing the lower thrust shoes of the motor bearing to carry the thrust load.) If a drop is suspected, contact the NSED - ECCS & Reactivity System Team immediately. If reverse thrust is suspected, the affected RR pump should be shutdown as soon as practical to minimize secondary component damage. REFERENCE (S): CPS No. 3302.01, Reactor Recirculation (RR) CPS No. 3301.02, Loose Parts Monitoring System (Lm) CPS No. 5067-2K, Loose part Monitoring Sys Trouble

RESPONSE

SAT UNSAT Page 2 of 3 i

E - CLINTON POWER STATION r. l JOB PERFORMANCE MEASURE l OPERATOR COPY I Imoortance Ratinn K/A SYSTEM NUMBER K/A NUMBER RQ SRO

l. t 202001 A2.10 3.9 l
                    ~202001                                          K4.17                                              3.5 L                                                                                                                                               ;

i JTA: l TASK NUMBER i h ANSWER TIME: Min i

                 - ORIGINATED / REVISED BY:                                                  /

l I t REVIEWED BY: / l' APPROVED BY: / Supervisor- Requalification and Operations Training L t l l 1 1 3 Page 3 of 3 t-

           .                                  .CLINTON POWER STATION                                                      ;

/  ; JOB PERFORMANCE MEASURG l OPERATOR COPY l 1 1 l INITIATING CUE 1 \ The plant is operating at approximately 30% power in single loop. The "B" loop is operating. The "A" RR pump is stopped and the "A" RR loop is unisolated. Startup the "A" Recirc Pump in slow speed per section 8.1.1 of CPS 3302.01. I i l l 1 I i l l i i l I Page1of1

f ' i CPS No. 3302.01 ' e 8.0 PROCEDURE ! 8.1

                           ,                   Normal Operations l                                     .

l 8.1.1 RR Pump - Startup . t ., 1 8.1.1.1 (Local) i

                                                           'Unless check'ed during drywell close-out, check RR pump motor oil levels if the drywell is accessible.

Reference MS-08.'00 for proper RR Pump A(B),1833-C001A(B) oil level determination criteria. l l c 6.1.1.2 (Local) %ib _ _ . open

                                                                    .,. 1Cll-F026h(B), CRD Supp Isol             To RR Q

Pump A(B) and verify CRD supply to the RR, pump seals is i 3 - S gym on flowmeter 1Cll-D020A(B) . If required, ad ! h'(% - 1C11-D012A(B), Flow Control Valve to obtain 3 - 5 gpm.just i j Flow regulator,1Cll-D012A(B) is used to adjust flow as follows (per K2801-0009): [CNNT 75S' AEN 189']. ~ a) f Loosen locknut and rotate stem until desired flow * , is attained. (Clockwise for decreasing flow, I counter-CW for increasing flow) b) l v Lock stiem in desired position by hol' ding stem

           .c                                      steady while re-tightening locknut.

\ 4= NOTE When starting pumps at low power / low feed flow conditions, the white light above the Cavitation Interlocks switch will s_tay on and the pumps will start in slow speed. O 'c8.1.1.3 a) Zero the A/B loop SERVO ERROR. b) Depress following reset buttons to i t clear interlocks / alarms l 1). FCV A/B Motion Inhibit Reset'.

  • l Verify the lead HPU becomes operational, j

s and FCV motion is no longer inhibited, t d' Pump A/B Vibration Reset.

3) Cav Intik A/B Reset / Rx Run Back Reset.

v l' 4) Low Level Intik A/B Reset. s [ t - 3 Rev. No. 19 ' 1 ' Page No. 10 o f 3 5 _ O4 I' i

h  ! hh i-I . {.'

               .                                                                        CPS No.         _3302.01    _

8.1.1 RR Pump - Startug (cont'd) O 8.1.1.4 ' Verify RWCU system in operation with flow established i through bottom head drain line to obtain a ..sliable 4 Andica, tion of bottom head drain coolant temperature.

e 8.1.1.5 Within 15 min. prior ' ot starting the A(B) RR pump, ,

I 0

                                              ' Verify following ITS SR 3.4.11.3/4 temperature limits an'd GEK-75635A Thermal Shock limits (use table below for data point locations) are met, and log the data in the NCR                     -

3 Journal. a)* Difference between' bottom head coolant temperature and the RPV coolant temperature is s 100*F. (ITS/GEK)

  • b) Diffarence between tl'st RPV coolant temperature j in the RR loop to be started and the RPV coolant
temperature is s 50*F. (I*S/GEK)
  • c) Difference between idle RR loop to be started and the

' other RR loop is s 50*F. (GEK-75635A only: verifies Bkr

                                               ,    SA(58) Thermal Interlock item satisfied.)

1 %0

          .r*

RPV Coolant bottom Head. RPV Coolant Temperature Coolant Tempeiature Te era th p to be Started a~ ' MODES 3/4 with RHR SDC . . in operation: ' i , Use RHR Hx inlet temperature from - recorder E12-R601 at 1H13-P601. MODES 2-4 with RR loop Use Point 4 (Botton Use RR pump suction in operation and RHR Head Drain Temp) on temperature for the SDC secured: recorder 1821-R643 at idle'RR loop from. 1H13-P614, or computer recorder B33-R604 at uct on mp r points B33DH02/017 1H13-P614. B33-R604 at,1H13-P614. IV"IId "h*". > 214 F) . MODES 1-3 with Rx I coolant > 214'FT Use Steam Dome Temperature computer point B21NA006. ,

            ,~
  • Rev. No. 19 '

Page No. 11 of 36

l

 .                                                                                                            ~ N?

e 4 , l.' CPS No. 3302.01 l 8.1.1 RR Pump - Startup (cont'd) s O 8.1.1.G Verify annunciators 5003-2C/2J, Recirc Pmp A/B Temp l Intik Actuated are extinguished (verifies GEK-75635A Bkr

                                                  $A(SB) pump start loop to loop thermal interlock in effect)

(annunciator only valid when > 214*F) . . 841.1.7 Place 1B33-F060A(B), Recirc FCV in minimum open. position. ' 8.1.1.8 Verify CRD supply and. seal staging flow has been 'in , operation for at least one' hour prior to pump start to ensure the pump seals are vented. I CAUTION Do not simultaneously start both RR pumps. *

  • 8.1.1.9 Close the following P680 breakers in order:

a) Recirc Pump A(D) Mtr Bkr. 3A(3B) . b) Recirc Pump A(B) Mtr Bkr 4A(4B) . v

            .^  ..                                                                                                   *
               ,a                                                             NOTE              '

If FW flow is < 30% (~ 3.74 albm/hr), then: a) RR pump will accelerate on the 60 cycle source. b) The 1A(lB) breaker will close at the same time the SA(SB) breaker closes. c) When pump speed is > 95% (1691 rpm), the SA(SB) breaker will open. , , ! d) When pump speed drops to 20-26% (356 -463 rpm), l

                                  .                 the 2A(2B) breaker will close.                                                          '

If FW flow is > 30% (~ 3.74 albm/hr), then RR pump speed will accelerate directly to 1006 .(1780 rpm) . 8.1.1.10. Notify security that perimeter lighting may go out for - 2 to 6 minutes due to the pump start. l s -

                      'y i
            ,-~
Rev. No. 19 Page No. _12 of 36 l

l

                                                  .E .
        ,                                         t
            ,                                                                                                                           CPS No. 3302.01 8.1.1             RR Pump - Startup (cont'd)                                               ,   ,

l 8.1.1.11 Monitor reactor power and RPV . water level duririg the starting of a RR pump. 8.1.1.12 Start RR pump A(B) by closing

  • Recirc Pump A(B) Drive Motor Bkr SA(SB) .

8.1.1.13 If RR pump startup was directed from section 8.2.6, Idle RR Loop - Restart (step 8.2.6.6), return to step 8.2. 6.7. Otherwise continue in this section. NOTE A 40 sec incomplete sequence timer starts when the

  • CB-S breaker is closed. If after 40 sec, pump speed is not 20-26% fo CB-2 is not shut, the incomplete sequence relay will trip CB-1 & CB-5.

8.1.1.14 . After the RR pump is'in service on the LENG,

                          ,                                        open the FCV to full open position.

L0

  • OK to inhibit EUV motion .per CPS No. 3302.02,
              ~.

REACTOR RECIRCUIATION FLOW CONTROL NYDRAULIC SYSTEM 4< while in slow speed RR pump operation to prevent inadvertent Et V runbacks. O'

  • OK to restari: RR HPUs per CPS No. 3302.02 .

after a short shutdown. 8.1.1.15 Monitor Table 1, RR Pump Seal Key Parameters .(page 26) . . If they approach or reach the maximum allowable, corrective action should be taken. - O 6.1.1.16 STA: To obtain a valid heat balance, verify / substitute

                                                                 ,0.074 into points B33NA003 and 004, RR Pump A(B) Motor Power per CPS No. 3512.01, DISPIAY CONTROL SYSTEM                                                         I (DCS)/ PERFORMANCE MONITORING SYSTEM (PMS) .                                                             !

8.1.1.17 $ To start the other RI( pump, repeat section 8.1.1. L . Rev. No. 19.

  • Page No. _13 of 36 I

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 TASK TITLE: Manually initiate the Hich Pressure Core Soray System (HP) - Initiation Locic Available ner CPS 3309.01

     . TASK NUMBER: 015200C617 APPLICABILITY: RO X SRO X TRAINEE                                                        DATE EVALUATOR METIIOD OF TESTING:

Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 3 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations . Approved by: Date: _ Supervisor - Operations Training Page1of9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Initialize to any suitable IC with HPCS in Standby. Suppression Pool Level is < 19' 11.5". RCIC Storage Tank Levelis > 2200 gal. TASK STANDARDS: The High Pressure Core Spray (HPCS) System is manually initiated and is injecting into the reactor vessel. TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3309.01, HIGH PRESSURE COIE SPRAY EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: An emergency condition exists. Manually initiate HPCS using the manual initiation pushbutton. START TIME: Page 2 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 PERFORMANCE INFORMATION S Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Manually Initiate High Pressure Core Spray (HP)- Logic Operable 8.1.3a) During HPCS operation, verify as appropriate that 1E22-F0I2, HPCS Pump Min Flow to Suppr Pool: Opens whenever HPCS flow is < 625 gpm with HPCS discharge pressure > 145 psig, and Shuts whenever HPCS flow is 2 625 gpm. l

        *b)       Arm and Depress HPCS MANUAL INITIATION pushbutton.

STANDARD: HPCS Manual Initiation pushbutton is armed and depressed. CUE: COMMENTS: I "HPCS MANUAL INITIATION SWITCH IN ARMED POSITION" and "HPCS AUTO ST \RT" annunciators acknowledged. SAT UNSAT Page 3 of 9

__ _. ._..-~.m,_.. _ _ _ . _ . - _ _ - . - - _ - - . - - - - --- ---- -- l CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: ' NRC 2 REVISION: 0 i l c) Verify HPCS initiates per section 8.1.2 i 8.1.2 a) - During HPCS operation, verify as appropriate that 1E22-F012, HPCS Pump Min Flow ,

                                 - To Suppr Pool:                   ..

Opens whenever HPCS flow is ,625 gpm with 1 HPCS discharge pressure < 145 psig, and . Shuts whenever HPCS flow is 2 625 gpm.

                        .b)~

Verify following events occur upon HPCS initiation: l

1) 1E22-F001, HPCS Storage Tank Suction Valve opens if )

lE22-F015, Suppr Pool Suction Valve not open i l STANDARD:. 1

            ' Verifies RED light ON for 1E22-F001 L. CUE:
                                                                                                                              -)

i l COMMENTS: SAT UNSAT

2) HPCS Pump,1E22-C001 starts.

STANDARD:

            . Verifies RED light ON for HPCS pump.

CUE: LCOMMENTS: SAT UNSAT Page 4 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET F JPM NUMHER: NRC2 REVISION: 'O

3) HPCS Pmp Rm Sply Fans, IVY 08CA and B start.

STANDARD: Verifies RED light ON for IVY 08CA and B' CUE:

   ' COMMENTS:

On vertical section of panel P-800 SAT UNSAT

4) 1E22-F004, HPCS To CNMT Outbd Isin Valve opens.
                                                                                                                'i STANDARDi                                                                                                    ,

Verifies RED light ON for 1E22F004. l Verifies RED and GREEN light ON for 1E22-F012  : CUE: l l COMMENTS: Min. Flow valve may be in mid position based on pressure and flow, e Red and green lights for the injection valve may be ON at the same time due to the long valve stroke time. SAT UNSAT l i

                                                                                                                  )

i Page 5 of 9  ! l

                            .    .     . _ . . . .         - -.      .. . - . . . - -         -    . ~..      ..

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET . i i JPM NUMBER: NRC2 REVISION: 0

5) Diesel Generator 1C starts, i

l STANDARD: i Verifies RED light ON for DG IC CUE: { COMMENTS: 1 SAT UNSAT  ; i i

6) SSW Pump IC, ISX0lPC starts.

STANDARD: Verifies RED light ON for SX Pump IC. l CUE: i t COMMENTS: I 1 SAT UNSAT

                                                                                                                    )

l Page 6 of 9 g e.. . _ . _ _

_ _ . _ . . - _ . . - _ _ _ . . . . _ . _ . . _ . _ . _ . . . . _ . . ~ . _ . _ . . - _ . _ . . CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l 3 JPM NUMBER: NRC2 REVISION: 0 . l c) Verify shut: i

1) lE22-F010, HPCS First Test Viv to Storage Tank
2) IE22-F0ll, HPCS Second Test Viv to Storage Tank
3) 1E22-F023, HPCS Test Valve to Suppr Pool STANDARD: I Verifies GREEN light ON for 1E22-F010,1E22-F011, and 1E22-F023  ;

CUE:  ! COMMENTS: i i SAT UNSAT l l I l l l I

                                                                                                                                                                               .i Page 7 of 9              l

_ . _ _ - _ _ . . . . _ . . _ . _ . _ . _ - _ . _ _ - . . _ . . _ _ . . . . . . _ . _ . ~ __ . __._ . CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET  ! P JPM NUMBER: NRC2 REVISION: 0 t TERMINATING CUES: L The HPCS system is injecting water into the reactor vessel.- STOP TIME: I l l l l

,                                                                                                                                        I l

1 Page 8 of 9 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC2 REVISION: 0 K/A REFERENCE NUMBERS Imnortance Ratine K/A SYSTEM NUMBER K/A NUMBER RO SRO L Page 9 of 9

                        ~ . _ . _ _ . _ . _ _ _ . - _ - _ _ _ _ _ _ - . - _ . _ _ - _ _ _

e CLINTON POWER STATION JOB PERFORMANCE MEASURE  ! QUESTION DOCUMENTATION ,

   . QUESTION NO.:                   1 The plant was at 100% power when 4.16 KV Bus 1B locked out due to an overcurrent condition. The loss of the 4.16 bus resulted in a trip of the reactor feed pumps with the resulting level transient. Level                      ;

decreased below level 2 before recovering. Diesel Generator IC automatically started during the

  - transient. What caused the auto start of Diesel Generator 1C7 ANSWER:                                                                                                                          .

Actuation of High Pressure Core Spray (IIPCS) logic REFERENCE (S): E02-1HP99, Sheet 5

RESPONSE

SAT UNSAT I c Page 1 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE

                                             - QUESTION DOCUMENTATION                                                       1 QUESTION NO.:                     2 The High Pressure Core Spray (HPCS) System is in standby and reactor power is 75%. An instrument failure results in the shift of the HPCS suction to the suppression pool. What reports /notificatons, if any,        .

must be made? l ANSWER: l No notilleation required REFERENCE (S): l CPS No.1016.04, Appendix E, LER 85-20 CPS No.1405.04, Also see 2.2 INVALID ACTUATIONS

RESPONSE

SAT UNSAT i l 1 1 1 I 1 I i Page 2 of 3

                                                                                                                           .i

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION 1

                                                                                                                                     ~

Imoortance Ratinc

                                                                                                                                     .I K/A SYS%iviNUMBER                                    K/A NUMBER .               IlQ SRO 209002                                           K6.01                                               3.6 209002                                           0 2.1.14                                            3.3 i

JTA: TASK NUMBER l ANSWER TIME: J.jiin ORIGINATED / REVISED BY: / i , REVIEWED BY: / APPROVED BY: / Supervisor- Requalification and Operations Training 4 Page 3 of 3 l 4

.. j

-                                     CLINTON POWER STATION                                               -1 1

JOB PERFORMANCE MEASURE  : OPERATOR COPY ' INITIATING CUE i

An emergency condition exists. Manually initiate HPCS using the manual initiation pushbutton.
                                                                                                           +

i i k e Page1ofI

CPS No. 3309.01 8.1.3 Manual Initiation - Logic Oparzblo a) During HPCS operation, verify 7.4 appropriate that ' lE22-F012, HPCS Pump Min Flow T Suppr Pool: s,y Opens whenever HPCS flow is < 625 gpm with. HPCS discharge pressure > 145 psig, and . Shuts whenever HPCS flow is 2 625 gpm. b) Arm and Depress HPCS MANUAL INITIATION pushbutton. c) Verify HPCS initiates per section 8.1.2. , I NOTE Shutting 1E22-F004, HPCS To CNMT Outbd Isin Valve with an initiation signal present prevents any further automatic opening until the initiate signal clears and is reset; therefore, manual operation of the valve will be required to maintain level. To open lE22-F004 that has closed on Level 8, the RX WTR LEVEL HI SEAL IN RESET push-button must be depressed (when > Level 2) . d) Restore and maintain level using 1E22-F004, HPCS To CNMT Outbd Isin Valve.

  \"'        8.1.4     Manual Initiation - Logic NOT Operable a)      During HPCS operation, verify as appropriate that 1E22-F012, HPCS Pump Min Flow To Suppr Pool:                     c Opens whenever HPCS flow is < 625 gpm with                   :

HPCS discharge pressure > 145 psig, and Shuts whenever HPCS flow is 2 625 gpm. b) Start HPCS Pump, 1E22-C001. i c) Verify 1E22-F012, hPCS Pump Min Flow To Suppr Pool opens. d) Verify HPCS Pmp Rm'Sply Fans, IVYO8CA and B start. , NOTE l the To open 1E22-F004 that has closed on Level 8, RX WTR LEVEL HI SEAL IN RESET push-button must be depressed (when > level 2). e) Open lE22-F004, HPCS To CNMT Outbd Isin Valve, f) Restore and maintain level using

                               1E22-F004, HPCS To CNMT Outbd Isin Valve.

10 Page No. 8 of 17 Rev. No.

  ~  .'                                                             .                  i j        - a          s                                          CPS No. 3309.01       l i                                                                                       1 7.0      MATERIAL AND/OR TEST EQUIPMENT
                                                                                       ]

l Hoses as necessary to support fill, vent, and j drain evolutions. i v 8.0 PROCEDURE 8.1 Normal Performance 8.1.1 STANDBY HPCS is lined up, ready to automatically initiate on a LOCA signal and inject water from the RCIC storage tank, or the suppression pool to the RPV. a) Verify proper operation of HPCS Water Leg Pump, lE22-C003. b) Verify prerequisites (listed in section 5.0) are met. c) Perform surveillance testing as specified in Tech Specs. 8.1.2 Automatic Initiation a) During HPCS operation, verify as appropriate that g,, 1E22-F012, HPCS Pump Min Flow To Suppr Pool: Opens whenever HPCS flow is < 625 gpm with HPCS discharge pressure > 145 psig, and Shuts whenever HPCS flow is 2 625 gpm. b) Verify following events occur upon HPCS initiation:

1) lE22-F001, HPCS Storage Tank Suction Valve opens if lE22-F015, Suppr Pool Suction Valve not open.
2) HPCS Pump, 1E22-C001 starts.
3) HPCS Pmp Rm Sply Fans, IVY 08CA and B start.
4) lE22-F004, HPCS To CNMT Outbd Isin Valve opens.
5) Diesel Generator 1C starts.
6) SSW Pump 1C, 1SX0lPC starts.

c) Verify shut: l 1) lE22-F010, HPCS First Test Vlv To Storage Tank.

2) lE22-F011, HPCS Second Test Vlv To Storage Tank.
3) lE22-F023, HPCS Test Valve To Suppr Pool, s_-

Rev. No. 10 Page No. 7 of 17

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC3 REVISION: 0 TASK TITLE: Emercency Startuo of Standby Drywell Cooline System TASK NUMBER: 011222C506 l APPLICABILITY: RO X SRO X l l TRAINEE DATE 1 . EVALUATOR l l METHOD OF TESTING: Simulated Performance Actual Performance X ! I i Classroom Simulator X Plant - APPROXIMATE TIME FOR COMPLETION: 6 minutes Prepared / Revised by: Date: l Reviewed by: Date: Imtructor - Operations Approved by: ,_ Date: Supervisor- Operations Training l l Page1 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC3 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Initiate to any suitable IC that has a VP in standby. TASK STANDARDS: Operator actions performed per CPS No. 3320.01, Step 8.2.2 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3320.01, DRYWELL COOLING SYSTEM, Step 8.2.2 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: An Emergency Condition Exists; perform an emergency startup of the 'A' Drywell Coo:ing System per CPS No. 3320.01 START TIME: Page 2 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REV" ON: 0 PERFORMANCE INFORMATION Critical ',ters are denoted with a asterisk (*) to the left of the step number and appear in BOLDED lettus. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. PERFORMANCE STEPS JPM TITLE: Emergency Startup of Standby Drywell Cooling System 8.2.2.1 At 1H13-P801, start the standby Drywell Cooling System as follow:

 *8.2.2.1.1      Start Drywell Cooling Fans IVP01CB and IVP01CD (IVP01CA and IVP01CC).

STANDARD: Takes handswitches for Drywell Cooling Fans 1B and ID to START and observes RED light ON for each fan. CUE: COMMENTS: ' SAT UNSAT l l

                                                                                                                 )

Page 3 of 10 1

1 CLINTON POWER STATION i JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0

  • 8.2.2.1.2 Start Chill Water Pump IVP03PB (1VP03PA) without first closing discharge valve.

STANDARD: Takes handswitch for Drywell Chill Water Pump 18 to START and observes RED light ON. Observes RED no flow light ON. 1 CUE: COMMENTS: Low flow chilled water annunciator clears. SAT UNSAT I l 8.2.2.1.3 Verify / Place 1SX020B(A), Drywell Chiller 1B(1 A) Inlet  ! Valve in AUTO AFTER OPEN. j STANDARD: Verifies ISX020B in AUTO AFTER OPEN CUE:  ; COMMENTS: SAT UNSAT Page 4 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0

      '8.2.2.1.4     Start standby Drywell Chiller IVPO4CB (IVP04CA) using the START pushbutton on 1H13-P801, 1

STANDARD: Depresses START pushbutton for standby Drywell Chiller 1B and observes RED light ON. CUE: COMMENTS: SAT UNSAT

8.2.2.1.5 Send an area operator to the Drywell Chiller to monitor performance and load the chiller as required in accordance with steps 8.1.1.5.7 and 8.1.1.5.8.

i STANDARD: , l l . Notifies area operator to monitor and load the chiller as required. CUE: Area operator is on the way to the chiller for local monitoring COMMENTS: l i l SAT UNSAT l 4 I i Page 5 of10

 , .                           _ _ _ _     _   ._       - ~   _ . . - . . _ __   __    . -_ _      __      _ _ _ . - _

i CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET  ! l JPM NUMBER: NRC3 REVISION: 0 i 8.2.2.1.6 If IVP01CA, IVP01CC, and IVPOICB, IVP01CD are all going to be left running, then open IVP10Y and IVP12Y at PNL IPL43JA and JB.

                                                                                                                         )

1 STANDARD: Notifies area operator to open the dampers as required. CUE:  ! 1 Dampers have been opened. COMMENTS: l SAT UNSAT 8.2.2.2 At IH13-P800-65, transfer Supplemental Drywell Cooling Coil Units IVP02SE and -l IVP02SF to the operating Drywell Cooling System as follows: j l

  • 8.2.2.2.1 Close Supplemental Drywell Cooling Coil Units Supply and Return Isol Valves l IVP090A/lVP091 A (I VP090B/1VP09091 B).

STANDARD: Takes handswitch for IVP090A/91 A to CLOSE and observes GREEN light ON for both valves l CUE: COMMENTS: l SAT UNSAT 1 l Page 6 of 10

CLINTON POWER STATION . J JOB PERFORMANCE MEASURE WORKSHEET i JPM NUMBER: NRC3 REVISION: 0

*8.2.2.2.2   Open Supplemental Drywell Cooling Coil Units Supply and Return Isol Valves 1VP090B/lVP091B (1VP090A/1VP091 A).

STANDARD: 1 Takes handswitch for iVP090B/91B to OPEN and observes RED light ON for both valves l l CUE: l COMMENTS: SAT UNSAT i 8.2.2.2.3 Verify WO system lineup to supplemental drywell cooling coil units IVP02SG and l IVP02SH. STANDARD: l 1 Verifies WO system lineup by observing RED light ON for the following: ) 1WO551 A/552A Cli WTR OUTBD ISOL VLVS 1WO551B/552B Cli WTR INBD ISOL VLVS IVP01CG/li DW Cooling Fans 1G/lli CUE: COMMENTS: SAT UNSAT Page 7 of 10

             . _         .     .                     _ . . .   . _ . _         . -_ .   .~ -   .    . - _ .

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0 t 8.2.2.3 Locally monitor Drywell Chiller I A for proper operation.

STANDARD

Notifies area operator to monitor the Drywell Chiller l A for proper operation l CUE: ( Drywell Chiller l A is operating properly COMMENTS: . SAT UNSAT I i r (. l l ( l Page 8 of 10 l

                                                         - CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET
               - JPM NUMBER: NRC3                                                                                      REVISION:                              0 TERMINATING CUES:                                                                                                                                         1 l
               ; Startuplof drywell cooling system is complete.

1 STOP TIME: 1 i

                                                                                                                                                                            )

1 j t k 4 e f Page 9 of 10

                                                                    ,e          ----             y

. . _ _. .. . ._ ._ ..~ . _ .._._. . _ _ _ . _ _ _ . . . . _ . ~ _ _ _ . .-_.-_-____ _._ _.. CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC3 REVISION: 0 K/A REFERENCE NUMBERS Imnortance Ratina K/A SYSTEM NUMBER K/A NUMBER RO SRO o Page 10 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: _ 1 Several Drywell Cooling System (VP) components " Shunt Trip" on a LOCA signal. What VP components do NOT receive a shunt trip signal? ANSWER: Supplemental Drywell Cooling Fans (1E, IF, IG, and lH) t REFERENCE (S): CPS No. 3320.01

RESPONSE

I 1 l SAT UNSAT l l l l l l i l Page1of3 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 2 The Plant is operating at 100 % power. A CR hasjust been delivered to the Control Room which has identified the oil coolers for the Drywell Purge Compressors as being Non-Q . The Shift Manager states that he will declare the Drywell Purge Compressors INOP and must verify the status of the Hydrogen Control Function. What constitutes the Hydrogen Control Function?

 ' ANSWER:

At least ONE (1) Division of Hydrogen Igniters are OPERABLE. REFERENCE (S): ITS 3.6.3.3 Action B.1 and Bases

RESPONSE

SAT UNSAT Page 2 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION Imnortance Ratin.g K/A~ SYSTEM NUMBER K/A NUMBER .- RQ- SRO L223001 K6.11 3.0 223002 G2.1.12 4.0 LTA.; 1 TASK NUMBER ANSWER TIME: Min s ORIGINATED / REVISED BY: / i REVIEWED BY: /' APPROVED BY: / Supervisor- Requalification and Operations Training Page 3 of 3

     ,,_c.,                        .       .                                                                              . . . _
                              ,              CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY INITIATING CUE                                                                 !
         ~ An Emergency Condition Exists; perform an emergency startup of the 'A' Drywell Cooling System per
                  ~

CPS No. 3320.01 i. 1 1 L i. I l

                                                 ,                                                                                  1 l'

f

   .                                                                                                                                l l
                                                                                                                                    )

L Page1of1 L I

s- ] CPS No. 3320.01 8.2.2 Emergency Startup of Standby Drywell Cooling System - 8.2.2.1 At 1H13-P801, start the standby Drywell Cooling System as follow: 8.2.2.1.1 Start Drywell Cooling Fans IVP01CB and IVP01CD (lVP01CA and IVP01CC). 8.2.2.1.2 Start Chill Water Pump IVP03PB (1VP03PA) without first closing discharge valve. O 8.2.2.1.3 Verify / Place 1SX020B(A), Drywell Chiller 1B(lA) Inlet Valve in AUTO AFTER OPEN. 8.2.2.1.4 Start standby Drywell Chiller IVPO4CB (1VP04CA) using the START pushbutton cn 1H13-P801. 8.2.2.1.5 Send an area operator to the Drywell Chiller to monitor performance and load the chiller as required in accordance with steps 8.1.1.5.7 and 8.1.1.5.8. 8.2.2.1.6 If IVP01CA, IV01CC and IVP01CB, IVP01CD are all going to be left running, then open IVP10Y and IVP12Y at 1PL43JA and JB. 8.2.2.2 At 1H13-P800-65, transfer Supplemental Drywell Cooling Coil Units 1VP02SE and IVP02SF to the operating Drywell Cooling System as follows: 8.2.2.2.1 Close Supplemental Drywell Cooling Coil Units Supply ' and Return Isol. Valves IVP090A/1VP091A (1VP090B/1VP091B). 8.2.2.2.2 Open Supplemental Drywell Cooling Coil Units Supply and Return Isol Valves 1VP090B/1VP091B (1VP090A/1VP091A). 8.2.2.2.3 Verify WO system lineup to Supplemental Drywell Cooling Coil Units 1VP02SG and IVP02SH. 8.2.2.3 Locally, monitor the operating Drywell Chiller to ensure proper operation. Rev. No. 11 Page No. 15 of 22

  • CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0 TASK TITLE: Manually Start Emercency Diesel Generator 1 A
 ' TASK NUMBER:           011264C526 APPLICABILITY:RO X SRO X TRAINEE                                                   DATE EVALUATOR METHOD OF TESTING:

Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 20 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: Supervisor- Operations Training Page i of 10

i CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET  ! i JPM NUMBER: NRC4 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Any suitable IC in which DG 1 A is in standby with support systems available. Insert Instructor Override 05A1 A5S19_X DG 1 A Voltage Regulator switch disabled. TASK STANDARDS: Diesel Generator I A running at rated frequency, DG 1 A Voltage Regulator identified as malfunctioning and all post-start verifications are completed. TOOLS, EQUIPMENT, OTIIER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3506.01, DIESEL GENERATOR AND SUPPORT SYSTEMS, Section 8.1.3 and 8.3. CPS No. 3506.01C001, DIESEL GENERATOR OPERATING LOGS CPS No. 3506.01C002, DIESEL GENERATOR START LOG EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: , Manually start Diesel Generator l A per CPS 3506.01 starting at 8.1.3.7. A C Area qualified operator is j standing by in the DG Room and prestart checks have been completed.  ! l START TIME: i Page 2 of10

1 CLINTON POWER STATION I l JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0 m  : PERFORMANCE INFORMATION  :

 - Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED,'           ;

CAPITAL letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the '  ; JPM. i PERFORMANCE STEPS JPM TITLE Manual Start Emergency Diesel Generator l A 8.1.3.7 Notify operator in Diesel Generator I A(1 B)(1C) Room ofimpending diesel start, and  ; ensure the respective Diesel Generator HVAC Room is clear of personnel. STANDARD: I Notifies C-Area operator ofimpending diesel start. Dispatches operator to verify DG 1 A HVAC Room is clear ofpersonnel. I CUE: As C-Area operator, acknowledge that a start of DGI A is impending and DG 1 A HVAC Room is clear. COMMENTS: , SAT UNSAT i l 1 i i i l l l Page 3 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0

   *8.1.3.8     Start Diesel Generator 1 A (IB) (IC) with the DG 1 A (IB) (IC) Control switch on 1H13-P877 (P601).

STANDARD: Starts DG 1 A using Control switch on lH13-P877 and observes DG 1 A light ON. CUE: COMMENTS: SAT UNSAT 8.1.3.9 Verify the Fuel Oil Transfer Pump starts at lH13-P877 (P601), or locally. STANDARD: Observes IED light ON for 1DOO1PA.

 ~ CUE:

COMMENTS: SAT UNSAT Page 4 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET

       . JPM NUMBER: NRC4                                                              REVISION:          0                .

8.1.2.10 Verify DG 1 A (1B)(IC) Room Ventilation Fan running on 1H13-P801 (P800), , or locally. ' STANDARD: ' Observes RED light ON for 1VD01CA. CUE: COMMENTS: SAT UNSAT 8.1.3.11 Verify DG 1 A (IB)(IC) Hx Outlet Viv ISX063A(B)(ISX006C) open. STANDARD:

                                                                                                                         . l Observes RED light ON for ISX063A.

CUE: COMMENTS: SAT UNSAT Page 5 of10

CLINTON POWER STATION I JOB PERFORMANCE MEASURE WORKSHEET i

      - JPM NUMBER: NRC4                                                                                REVISION:    0 8.1.2.12      IE SX pump ISX0lPA(B)(C) starts,                                                                                             I THEN Verify Plant Service Water (WS) to Shutdown Service Water (SX) header isolation valve 1SX014A (B)(C) closed.                                                                                       i STANDARD:                                                                                                                                   .
      - Verifies GREEN light ON for ISX014A if ISX0lPA starts..                                                                                    ,

CUE: l COMMENTS: , ISX0lPA should not start due to this evolution. SAT UNSAT ' 8.1.3.13 Verify DG 1 A (1B) (IC) frequency 58.8-61.2 Hz.  : STANDARD: Verifies DG 1 A frequency 58.8 to 61.2 on Output Frequency meter. CUE: COMMENTS:  ; SAT UNSAT t t Page 6 of 10  ; i  : e - ~ , - -

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET I i JPM NUMBER: NRC 4 REVISION: 0 , I 8.1.2.14 Verify (using one of the following indications) DGI A (1B) (1C) voltage, panel meter 4000 (4000) (4000), computer point 4015 (4015) (4015), GETARS 391 l' (3911)(3902) to < 4200 volts. STANDARD: Verifies DG 1 A voltage < 4200 volts using panel meter 4000, computer point 4015, or GETARS 3911. CUE: COMMENTS: SAT UNSAT

     *8.1.3.15      Verify remote speed control by varying DG 1 A (IB) (IC) frequency with         DG 1 A (1B) (IC) Governor control switch on 1H13-P877 (P601)

STANDARD: Alternately selects " RAISE" and " LOWER" on the Governor Control Switch. Observes frequency increase and decrease. CUE: COMMENTS: SAT UNSAT i Page 7 of 10 1

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4 REVISION: 0

  *8.1.2.16      Verify remote voltage control by varying DG 1 A (IB)(IC) voltage with DG 1A (IB) (IC) Generator Voltage Regulator control switch on III13-P877 (P601)

STANDARD: Alternately selects " INCREASE" and " DECREASE" on the voltage regulator control switch. Observes no change in voltage and reports to CRS that the voltage regulator is malfunctioning (not responding to , manual control). CUE: As CRS, acknowledge the malfunctioning voltage regulator and direct that the remaining step of 8.1.3 be completed while Electrical Maintenance investigates. COMMENTS: 3AT UNSAT 8.1.3.17 Locally check cylinder test valves and handhold covers for leakage and tighten as necessary. STANDARD: Directs C Area operator to check cylinder test valves and handhole covers for leakage.  ; CUE: COMMENTS: I SAT UNSAT Page 8 of 10

                                                                                                                       )

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET I JPM NUMBER: NRC4 REVISION: 0 l 1 1 l TERMINATIT4G CUES:  : 1 , ' DG 1 A is operating at rated frequency and post-start verifications are complete. STOP TIME: 1 l l 1 Page 9 of 10 i l

CLINTON POWER STATION i

                                                                                                                                                                            \'

JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC4' REVISION: 0 K/A REFERENCE NUMBERS Importance Ratina K/A SYSTEM NUMBER K/A NUMBER RO SRO i f i i 1 l 4 4 1 i

            ., .                                                                                                                        Page 10 of 10
  • 4 CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION THIS IS A CLOSED BOOK QUESTION QUESTION NO.: 1 Diesel Generator I A has been started and paralleled wih 4160 vac bus I Al. A loss of coolant accident signal (LOCA) is received followed 3 minutes later by a loss of voltage on the l Al bus. What operator action, if any, is required?

ANSWER: After the diesel output breaker trips open on the LOCA signal, the operator must take the output breaker control switch to TRIP and then release back to NORMAL to allow the diesel to reenergize the bus. REFERENCE (S): CPS No. 3506.01

RESPONSE

SAT UNSAT l i Page1of3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 2 The plant is at 100% power with all equipment normal except that l A Diesel Generator is tagged out for turbocharger repair. Annunciator"HIGH/ LOW TEMP DG ROOM 1B"(5052-4A) alarms. the operators note that the temperature in the 1B Diesel Generator room is 48 F and decreasing at approximately 1 F. per minute. What operator action must be taken after declaring the 1B DG inoperable. ANSWER: Attempt to restore DG Room Make Up Heater. REFERENCE (S): CPS ITS Section 3.8.1 Action E CPS No. 5052.04, page 1 (4A) CPS No. 3403.01

RESPONSE

SAT UNSAT  ; i l l I Page 2 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION Importance Rating ,

     .K/A SYSTEM NUMBER                           K/A NUMBER              EQ          SRO 264000                                   K4.08                                  3,7 264000                                   G2.1.12                                4.0 LT61 TASK NUMBER ANSWER TIME:      Min ORIGINATED / REVISED BY:                                    /

REVIEWED BY: /

                                                                  /
   - APPROVED BY:

Supervisor - Requalification and Operations Training l l Page 3 of 3 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE l OPERATOR COPY l l , INITIATING CUE

       . Manually start D'iesel Generator I A per CPS 3506.01 starting at 8.1.3.7. A C Area qualified operator is standing by in the DO Room and prestart checks have been completed.

k p 4 Page1of1_  :

CPS No. 3506.01 NOTE (- IF The DG output breaker trips while the DG is the  ! only supply to 4160V Bus 1A1(1B1), - THEN Pressing the Offsite Permissive pushbutton within 15 seconds will allow the RAT / ERAT breaker - to automatically close and re-energize the bus (assuming an offsite source is available), OTHERNISE The RAT / ERAT breaker must be closed manually with the 1H13-P877 (P601) control switch. CPS No. 4200.01, LOSS OF AC POWER has instructions for loss of AC. ITS 3.8.1 & 3.8.2 have LCO guidance. 8.1.2.2 Station a C Area qualified operator in the DG 1A(1B) (lC) room until the diesel temperatures have stabilized and then J make tours of the room at least once per~ hour while the , diesel is running. c 8.1.2.3 Initiate the Diesel Generator 1A (1B) (1C) portion of CPS'  ! No. 3506.01C001, DIESEL GENERATOR OPERATING LOGS. c 18.1.2.4 Initiate the Diesel Generator.1A (1B) (1C) portion of CPS No. 3506.01C002, DIESEL GENERATOR START LOG. '

                   '8.1.3      Manual Starting DG 1A(1B) (1C)

( , 9.1.3.1 Station a C Area qualified operator in the DG 1A(1B) (1C) g room during initial DG Startup until the diesel J

                               . temperatures have stabilized and then'.make tours of the room at least once per hour while the diesel is running.

t.1.3.2 Initiate the Following Logs Per Section 0.3. c 8.1.3.2.1 CPS No. 3506.01C001, DIESEL GENERATOR OPERATING LOGS. I c 8.1.3.2.2 CPS No. 3506.01C002, DIESEL GENERATOR START LOG. I 8.1.3.3 Perform the following prestart checks: 0 8.1.3.3.1 Check DG 1A(1B) governor lubricating oil level is at least 1/16" from top of sightglass or higher. For DG IC check the governor lubricating oil level is at or above mark at the center of sightglass but still visible in upper half of sightglass . If low , contact Electrical Maintenance to add or drain MOBIL 1(SW-30) oil as needed. 4 8.1.3.3.2 Drain condensate from' DG 1A (1B) (1C) air receivers by

         ~                           opening and closing Air Receiver Drain Valves 1DG623 (1DG626) (1DG629) and 1DG624 (1DG627) (1DG630).

Rev. No. 24 Page No. 17'of 62 k j

              .'                                                                CPS Mo.       3506.01 0.1.3.3.3       Drain condensate from DG 3.A (18) (1C) Air Start System i

by opening and closing the following valves: - 4 4 , [

             ,,                             a) DG 1A (1B) (1C) Air Start Supply Drain 1DG009A (1DG009C) (1DG009E).

b) DG 1A (1B) (1C) Air Start Supply Drain 1DG009B J (1DG009D) (1DG009F) . c) DG 1A Air Receiver Outlet Drain 1DG017A.  ; d) DG 1A Air Receiver Outlet Drain 1DG017B. e) DG 1C Air Receiver A Downstream Drain, 1DG014. f) DG 1C Air Receiver B Downstream Drain, 1DG013, 8.1.3.3.4 Check DG 1A (1B) (1C) lubricating oil strainer housing 1 oil level is up to bottom of overflow opening. 8.1.3.3.5 Check all associated air start motors are disengaged. 8.1.3.7.6 Check all associated in line air lubricators are filled

with oil.

NOTE The DG 1C shall not be started when the oil level  ! is outside the STBY band on the generator bearings sight glasses.

s_-

( . 8.1.3.3.7 For DG IC, check generator bearing oil level is in the

       @                                    top band on the sight glasses. C9ntact Electrical Maintenance to add or drain oil.as needed.

NOTE The gallery oil level upper sight glass (if installed) may remain full as long as 24 hours when , restoring the engine to standby following a cold l shutdown period. This is due to the time required l

        ,                           to heat the oil and engine to standby temperatures.

8.1.3.3.8 Check Engine (lA) (1B) (IC) gallery oil level upper sightglass empty and. lower sight glass is ' full. IF Oil levels are not as stated, ! THEN Initiate investigation to determine cause. NOTE Refer to ITS LCOs 3.8.1 and 3.8.2 prior to ). performing next step. l Rev No. 24 Page No. 18 of 62 e O r

        ,                                                                                CPS No. 3506.01 ~

c CAUTION The amount of time the DG Engine Control Switch is ( in LOCKOUT (MAINTENANCE) during engine bar over should be minimized to limit the time'the DG is inoperable and would be unavailable for an automatic start. NOTE Diesel Generator Pre Start checks are valid for up to 8 hours from the time of completion. If DG has ran in the last 8 hours then section.8.1.3.4 is N/A. c 8.1.3.4 Place the Diesel Engine Control Switch at the Local DG Control Panel in the LOCKOUT (MAINTENANCE) position.

                                                                                                        ~

8.1.3.4.1 Perform the following for an OPERABLE Diesel Generator: a) Declare the associated DG INOP. NOTE If the DG Control Switch is returned to the OPERATE s,, position in less than one hour the following step 8.1.3.4.1 b) need not be performed. I N b) Perform section 8.1 of CPS N6.' 9082.01 if in modes 1, 2, or 3 or NA if not required. NOTE , Steps 8.1.3.4.2 and 8.1.3.4.3 can be done in any order or concurrently. 8.1.3.4.2 Open all DG cylinder test valves. i 8.1.3.4.3 Remove rear (generator end) oil pan handhole cover and i open topdeck covers. l l l NOTE i The following two steps may be performed individually or concurrently. If performed individually, inspect the test valves for drips or floor skid for liquid discha'rge from test valves. 8.1.3.4.4 Bar over DG one to two revolutions. Rev. No. 24 Page No. 19 of 62

             .________._._.._,__._______._.m_                                                          . . . _ _ _ _ . _ _ . . _     _ _ _
                     ,                                                                               CPS No.                 3506.01 8.1.3.4.5         Verify no leakage from test valves.           If any fluid discharge is observed, then initiate investigation and repairs.

8.1.3.4.6 Close all cylinder test valves. 8.1.3.4.7 Verify no oil flow is observed at the camshaft bearings and rocker arms. Inspect rocker arm assemblies and valve train push rods. Initiate investigation and ' repair if abnormality is found. j 8.1.3.4.8 Observe proper lubrication at the crankshaft bearings and rear gear train. IF Oil flow is not observed, THEN Initiate investigation and repair. 8.1.3.4.9 Replace and securely close handhole cover and engine topdeck covers'. 8.1.3.4.10. Place DG 1A (1B) (1C) Control Switch at Local 'DG 1A (1B) (1C) Control Panel in OPERATE (AUTO) position. j, l l NOTE , Setting the DG 1C Governor Speed Droop to 50% INOPS t the DG. Refer to ITS LCOs 3.3.1 or 3.8.2. V [ 8.1.3.5 IF Starting' DG 1C for parh31el operations,

      @                                                      THEN set DG 1C Governo.r Speed Droop at 50%.

a) IF Div.3 DG is OPERABLE, THEN Declare associated DG INOP. l b) IF Div 3 DG is OPERABLE, THEN Perform or verify current section 8.1 of CPS No. 9002.01 if in Modes 1, 2, or 3. l NOTE The following step should only. be performed for PMT run following Fuel System maintenance. Refer to 4.15. I O 8.1.3.6 IF Haintenance was perforImed on the fuel systen, THEN Prime the engine using the Manual Fuel Prime pushbutton located on the local control panel for DG . lA(1B), prime each engine until the pump discharge pressure i

      '                                                      has been stable for at least one minute, then continue l                    ,

priming for several more minutes. I Rev. No. -24 Page No. 20 of 62 i I

                    .  ..       .   ._  - - __     _ ~      __  . _ . _ _ .       _ _ .    -_ _
       ,                                                                    CPS No.       3506.01 -

CAUTION {" When Diesel Generator room ventilation fan starts personnel could become trapped in HVAC Room. 8.1.3.7 Notify operator in Diesel Generator 1A(1B) (1C) Room of impending diesel start, and ensure the respective Diesel Generator HVAC Room is clear of personnel. 8.1.3.8 Start Dien1 Generator 1A (18) (1C) with the DG 1A (1B) (1C) Control switch on 1H13-P877 (P601). 8.1.3.9 Verify the Fuel Oil Transfer Pump starts at 1H13-P877 (P601), or locally. 8.1.3.10 Verify Diesel Generator 1A (1B) (1C) Room Ventilation Fan running on 1H13-P801 (P800), or locally. 8.1.3.11 Verify DG 1A (1B) (1C) Hx Outlet Viv 1SX063A(B) (ISX006C) open. NOTE SX System A(B) may not start if WS System pressure does.not drop below 79.6 psig. 8.1.3.12 E SX pump ISXO1PA(B) (C) starts, (

  • THEN Verify Plant Service Water (WS) to Shutdown Service Water (SX) header isolation valve 1SX014A(B) (C) closed.

8.1.3.13 Verify DG 1A(1B) (1C) frequency 58.8-61.2 Hz. O c 8.1.3.14 Verify (using one of the following indications) DG 1A (IB) (1C) voltage, panel meter 4000(4000) (4000), computer point 4015(4015)(3978), GETARS 3911(3911) (3902) to <4200 volts. NOTE For smoother diesel adjustments of voltage and load during operation, the following two steps should be used to adjust the frequency and voltage to " Wipe the Pots". This action will prevent a buildup of dirt and moisture. 8.1.3.15 Verify remote speed control by varying DG 1A (1B) (1C) frequency with DG 1A (18) (1C) Governor control switch on 1H13-P877 (P601). 8.1.3.16 Verify remote voltage control by varying DG 1A (IB) (1C) voltags with DG 1A (1B) (1C) Generator Voltage Regulator control. switch on 1H13-P877 (P601). 8.1.3.17 Locally check cylinder test valves and handhole covers for leakage and tighten as necessary. Rev. No. 24 Page No. 21.of 62

       ,                                     CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5                                                           REVISION:    0 TASK TITLE: Eaualize Around and Open MSIVs per CPS No. 4411.09 TASK NUMBER: 015200C643 APPLICABILITY:RO X SRO X TRAINEE                                                     DATE EVALUATOR m

METIIOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 30 minutes n Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date:

.                        Supervisor - Operations Training Page 1 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Any IC with the reactor shutdown, RPV pressurized, and MSIVs/MSL drains shut. Establish / verify a condenser vacuum pump is lined up and running on the Main Condenser. Reset the Main Turbine and close Turbine Drains. TASK STANDARDS: Operator actions performed per CPS No. 4411.09 TOOLS, EQUIPMENT, OTIIER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

 - CPS No. 4411.09, RPV PRESSURE CONTROL SOURCES

{ EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: 1 A loss ofIA resulted in closure of the MSIVs. IA has been recovered. EOP-1 has been entered and to l assist in RPV pressure control you are directed to reopen the MSIVs per CPS No. 4411.09 l START TIME: Page 2 of 10

   ~

i - CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0

       ==-                                  -

~ PERFORMANCE INFORMATION j l Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED l letters. Failure to meet the standards for a critical step constitutes failure of the Job Perfomiance l Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. l 1 PERFORMANCE STEPS l a . JPM TITLE: Equalize Around and Open MSIVs per CPS No. 4411.09 I NOTE Additional guidance for normal operating modes is in CPS No. 3101.01, MAIN STEAM (MS,IS & ADS). 2.2.2a LFF This step was entered from EOP-2, EOP-3, or EOP-4, j TIIEN 1) OK to defeat isolations per  ! CPS No. 4410.00C007, DEFEATING RPV PRESSURE CONTROL SYSTEM INTERLOCKS.

2) OK to exceed 100 F/hr cooldown. l 2.2.2 b Reset any cleared GROUP 1 isolations.

STANDARD:

     ' Determines that no pressure control system interlocks need to be defeated and that Group 1 isolation is reset.

CUE: COMMENTS: 1 SAT UNSAT Page 3 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0 , 2.2.2c Regardless if Cire Water (CW) is available or not: , e OK to position Div 1(2,3,4) Condenser Low Vacuum Bypass switches to i BYPASS to clear Gr 1 interlocks.

1) _ Establish vacuum per CPS No. 3112.01, CONDENSER VACUUM (CA), or If vacuum cannot be established,
2) )

open ICA007, Condenser Vacuum Breaker Valve. 1 2.2.2 d To avoid inadvertent bypass valve operation, maintain Pressure Set Point at least 50 psig

                                                                                                           )
                 > RPV pressure.                                                                             I STANDARD:

Determines that Condenser vacuum is already established CUE:

 . COMMENTS:                                                                                             .

SAT U'NSAT  ; Page 4 of10

CLINTON POWER STATION JOJ PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0

     *2.2.2 e      Open IB21-F098A(B, C, & D), Main Steam Shutoff Valves.

STANDARD: Takes handswitches for 1B21-F098A(B,C,&D) to OPEN and observes RED light ON for each valve. _ CUE: COMMENTS: SAT UNSAT

     *2.2.2 f     Open IB21-F028A(B, C, & D), Main Steam Line Outbd MSIVs.

e OK to open following drains to assist in the attempt. 1B21-F067A(B, C, & D), MSL Outbd MSIV Before Seat Drn Vivs. IB21-F068, Outbd MSIV Before Seat Warmup Drn Viv. IB21-F069, Outbd MSIV Before Seat Norm Drn Viv. STANDARD: Takes handswitches for 1B21-F)28A(B, C, & D), to OPEN and observes RED light ON for each valve. CUE: COMMENTS: May open drain valves to assist in equalizing , SAT UNSAT Page 5 of10 l

i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l

JPM NUMBER: NRCS REVISION: 0 l

  *2.2.2 g    Equalize around the MSIVs by opening:
1) 1821-F016, MS Drn & MSIV Byp Inbd Isol Valve.
2) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
3) IU21-F020, MSIV Byp Viv For MS Line Warm Up.

STANDARD: Takes handswitches for iB21-F016,19, and 20 to OPEN and observes RED light ON for each valve. CUE: COMMENTS: 1 SAT UNSAT l l l l Page 6 of 10

CLINTON POWER STi. TION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC5 REVISION: 0

               *2.2.2 h       Establish a AP s 200 psid across the MSIVs.

l

e OK to shut following drains to assist in the attempt. I IB21-F015, MS Low Points Dm Shutoff Valve.

j 1B21-F021, Inbd MSIV Before Seat Wam1up Drn Valve. IB21-F033,Inbd MSIV Before Seat Warmup Drn Valve. 1B21-F068, Outbd MSIV Before Seat Warmup Drn Viv. 1 IB21-F069, Outbd MSIV Before Seat Norm Drn Viv.  ! 1B21-F')70, MS Low Point Warm Up Drn Viv. IB21-F071, MS Low Point Normal Drn Viv. 1TD-SVl(3,5,7),' Mn Turb Stop Viv #1(2,3,4) Drn Viv (TG needs to be reset to shut). STANDARD: l i Establishes < 200 psid across MSIVs. Shuts drain valves as necessary. CUE: COMMENTS: SAT UNSAT 1 I

                                                                                                                                         )

i Page 7 of id m ._ _ _

i

                                 'CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMHER: NRC5                                                   REVISION:      0
  '8.2.2.2 i  Open 1821-F022A(B, C e 0), Main Steam Line Inbd MSIVs.

STANDARD: Takes handswitches for IB21-F022A(B, C, & D) to OPEN, and observes RED light ON for each valve. - CUE: COMMENTS: SAT UNSAT Page 8 of 10

CLINTON POWER STATION ~ J013 PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC5 REVISION: 0 TERMINATING CUES: . MSIVs are reopened. STOP TIME: 1 4 F J i-1 i i-i ' 4 i-1 Page 9 of 10

                      ,             r-    - -e,-                ,-e                         e                      , - - ,   - ,,     , - -            -~        -  mu- ----a

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET - i JPM NUMHER: NRC5 REVISION: 0 r K/A REFERENCE NUMBERS i Imnortance Ratinn K/A SYSTEM NUMBER - K/A NUMBER RO SRO I I L i 9 Page 10 of10

CLINTON POWER STATION , l JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION i QUESTION NO.: 1 1 The plant operating at 96% power. A C&I tech is performing a surveillance on Group One closure j signals and currently has one of the channels tripped to perform the surveillance. The plant experiences a transient that results in the other channel tripping and causing an MSIV closure and a resultant SCRAM. The operators perform the immediate actions for the SCRAM. When the turbine generator tripped offline, one of the bypass valves came open about 50% and stuck open. The MSL pressure  : dropped quickly (<300 psig), while reactor vessel pressure is being controlled by the relief valves SIC  ; and 51D. l Determine how you would recover (unisolate and open MSIVs) from this situation.

 ' ANSWER:

Shut the open bypass valve, Using CPS No. 3101.01 step 8.1.1, open all the MSIVs except the inboards, Bypass the Inboard MSIVs and reduce dP to less than 100 psid, open inboard MSIVs and watch level to  ; minimize a level increase. i REFERENCE (S): CPS No. 3101.01, MAIN STEAM (MS,IS & ADS) RESPONSE: l i i SAT UNSAT i i Page1 of3

CLINTON POWER STATION i JOB PERFORMANCE MEASURE 1 QUESTION DOCUMENTATION j QUESTION NO.: 2 1 You are the CRS and the plant has been operating at near rated power for several weeks. The BCRO announces that temperatures in the main steam line tunnels are increasing, currently at 140*F and that the differential temperature in the tunnel, currently at 45 F, is also increasing.

  -What actions need to be taken.                                                                              ;

ANSWER: I Ensure Aux Building HVAC operatmg,  ; Determine ifit is a RCIC or Main Steam Line leak. ' (At 151 F 5067-2F will annunciate, j and at 156 F 5067-1D will annunciate,and also Groups 1,4,5 & 6 will isolate). 1

 - REFERENCE (S):

CPS No. 5067.01D CPS No. 5067.02F

RESPONSE

l I i i SAT UNSAT Page 2 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION Importance Ratine K/A SYSTEM NUMBER K/A NUMBER BfQ SRO 239001 A2.03 4.2 239001 K4.01 3.8 JTA:

   ' TASK NUMBER' ANSWER TIME:      Min ORIGINATED / REVISED BY:                                   /

REVIEWED BY: /- APPROVED BY: / Supervisor- Requalification and Operations Training Page 3 c/3

4 CLINTON POWER STATION - JOB PERFORMANCE MEASURE OPERATOR COPY - INITIATING CUE 6 A loss ofIA resulted in closure of the MSIVs. IA has been recovered. EOP-1 has been entered and to assist in RPV pressure control you are directed to reopen the MSIVs per CPS No. 4411.09 A i-I . 4 Page1ofI

4 CPS No. 4411.09 2.2 NORMAL MCR SYSTEM LINEUP / OPERATION 2.2.1 BYPASS VALVES TO MAIN CONDENSER a) If necessary, open the MSIVs per step 2.2.2. , b) Open Main Turbine Bypass Valves as necessary to establish and maintain the desired pressure by using either of the following methods: Depress Bypass Valve Opening Jack INCREASE push-button to open bypass valves as needed. GP Fastest method, but no auto pressure control is available when using the Jack. GP When Pressure Set control is desired /obtained, return the jack to full down. Depress Pressure Set Point DECREASE push-button and lower the setpoint to below RPV pressure. GP Slower method, but provides auto pressure control. G" Lowering Pressure Set maximizes Bypass Valve availability, and causes the SRVs to close. 2.2.2 OPENING MSIVs NOTE Additional guidance for normal operating modes is in CPS No. 3101.01, MAIN STEAM (MS, IS & ADS). a) IF This step was entered from EOP-2, EOP-3, or EOP-4, THEN 1) OK to defeat isolations per , CPS No. 4410.00C007, DEFEATING RPV  ! PRESSURE CONTROL SYSTEM INTERLOCKS.

2) OK to exceed 100*F/hr cooldown.

b) Reset any cleared GROUP 1 isolations. c) Regardless if Circ Water (CW) is available or not: GF OK to position Div 1(2,3,4) Condenser Low Vacuum Bypass switches to BYPASS t-> clear Gr 1 interlocks.

1) Establish vacuum per I l

CPS No. 3112.01, CONDENSER VACUUM (CA), or I 2) If vacuum cannot be established, open 1CA007, Condenser Vacuum Breaker Valve. d) To avoid inadvertent bypass valve operation, maintain Pressure Set Point at least 50 psig > RPV pressure. l Rev. No. 2 Page No. 4 of 18

    -r. m    . - _ _ _ _ . _ .              _ _ . - - _ _ . _ _ _ . - -     . . . _ . _ . . _ _ _ . . _ _ _ . _ _ _ _               _
       ..                                                                                            CPS No.             4411.09 1

l 2.2.2 OPENING MSIVs (cont'd) ' e) Open 1B21-F098A(B, C, & D), Main Steam Shutoff Valves? f) Open 1821-F028A(B, C, & D), Main Steam Line Outbd MSI'Vs. G" OK to open following drains to assist in the attempt. IB21-F067A(B, C, & D), MSL Outbd MSIV Before f Seat Drn Vlvs. i IB21-F068, Outbd MSIV Before Seat Warmup Drn Vlv. IB21-F069, Outbd MSIV Before Seat Norm Drn Viv. 1 g) Equalize around the MSIVs by opening. I

1) 1B21-F016, MS Drn & MSIV Byp Inbd Isol Valve. '
2) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve. i 1
3) 1B21-F020, MSIV Byp Vlv For MS Line Warm Up. 1 l

h) Establish a AP 5 200 psid across the MSIVs. G" OK to shut following drains to assist in the attempt. 1821-F015, MS Low Points Drn Shutoff Valve. I B21-F021', Inbd MSIV Before Seat Warmup Drn Valve. 1B21-F033, Inbd MSIV Before Seat Warmup Drn Valve. 1B21-F068, Outbd MSIV Before Seat Warmup Drn Vlv. IB21-F069, Outbd MSIV Before Seat Norm Drn V1v.  ! 1B21-F070, MS Low Point Warm Up Drn Vlv. 1B21-F071, MS Low Point Normal Drn Vlv. . 1TD-SVl(3,5,7), Mn Turb Stop V1v #1(2,3,4) Drn Vlv j (TG needs to be reset to shut). i) Open 1B21-F022A(B, C, & D), Main Steam Line Inbd MSIVs. 2.2.3 SRVs No unique lineups or operating modes exist when using the SRVs for pressure control. Operate the SRVs in accordance with CPS No. 3101.01, MAIN STEAM (MS, IS & ADS) and within the guidelines , specified in the entry EOPs. l l

        .Rev. No . _2_                                                                                Page No.            5 of 18

CLINTON POWER STATION l \, JOB PERFORMANCE MEASURE WORKSilEET JPM NUMHER: NRC6 REVISION: 0 l TASK TITLE: Shutdown RCIC - Initiation Sienal Clear _ TASK NUMHER: 011217C005 APPLICABILITY:RO X SRO X TRAINEE DATE EVALUATOR

                                                             ,=-

METHOD OF TESTING: Simulated Performance Actual Performance X Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 5 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: Supervisor- Operations Training Page 1 of 10

CLINTON POWER STATION JOI3 PERFORMANCE MEASURE WORKSHEET JPM NUMllER: NRC 6 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the tas'k successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: 100% power with RCIC operating in the tank to tank mode. TASK STANDARDS: RCIC shutdown per CPS No. 3310.01, Section 8.1.6 TOOLS, EQUIPMENT, OTIIER SPECIAL REQUIREMENTS-

                                                                                                                     )

None PROCEDURAL /

REFERENCES:

CPS No. 3310.01, REACTOR CORE ISOLATION COOLING (RI), Section 8.1.6 EVALUATOR INSTRUCTIONS: l l Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE:

  ' RCIC is currently operating in tank to tank mode. Shutdown RCIC per CPS No. 3310.01.

START TIME: I-l Page 2 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC6 REVISION: 0 i PERFORMANCE INFORMATION , Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED  ; letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance  ; Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. ,

                                      -                                   ~

PERFORMANCE STEPS JPM TITLE: Shutdown RCIC -Initiation Signal Clear NOTE Do not secure pl place RCIC in manual override unless directed to per the EOPs, or by at least two independent indications: a) misoperation in automatic mode is confirmed, i b) adequate core cooling is assured. Minimize time on RCIC Min flow per Limitation 6.2.5. 8.1.6.1 If necessary, depress RCIC SEAL IN RESET push-button. STANDARD: Determines RESET is not necessary. WHITE light is extinguished. CUE: i i COMMENTS: SAT UNSAT j I L l l Page 3 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 6 REVISION: 0

  *8.1.6.2    Shut (if open) 1E51-F022, RCIC Pmp First Test Valve To Stor Tank.

STANDARD: Takes har .mitch for iE51-F022 to CLOSE and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT

  • 8.1.6.3 . Shut IE51-F095, RCIC Turb Stm Supp Bypass Valve.

STANDARD: Takes handswitch for 1E51-F095 to SHUT and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT l l Page 4 of10 l l

CLINTON POWER STATION - JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC6 REVISION: 0

   *8.1.6.4       Trip RCIC turbine from llil3-P601 by depressing the RCIC TURHINE REMOTE TRIP push-button.

STANDARD: Trips the RCIC turbine by depressing the trip pushbutton and observes GREEN light ON for trip / throttle valve, turbine speed decreasing CUE: COMMENTS: SAT UNSAT t' 1

   *8.1.6.5       Shut (if open) 1E51-F059, RCIC Pmp Second Test Valve To Stor Tank.                                                 l l
                                                                                                           '   l STANDARD:

l Takes handswitch for 1E51-F059 to close and observes GREEN light ON. j CUE: COMMENTS: SAT UNSAT l l Page 5 of 10

E .CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC6 REVISION: 0 l

            *8.1.6.6      Shut / verify shut 1E51-F045, RCIC Turb Sim Supp Shutoff Valve.

STANDARD:

       - Takes handswitch for 1E51-F045 to CLOSE and observes GREEN light ON.

CUE:

       ' COMMENTS:

SAT UNSAT NOTE 1E51-F005 is normally closed and opens as required by a level signal from the turbine exhaust drain pot. i 8.1.6.7 After 1E51-F045 closes, verify the following valves open automatically: a) 1E51-F004, RCIC Turb Exh Drn To RF First Isol Vlv. b) 1E51-F025, RHR & RCIC Stm Supp First Drn Isol Valve. c) 1E51-F026, RHR & RCIC Stm Supp Second Drn Isol Valve. STANDARD: After 1E51-F045 is SHUT, verifies 1E51-F004, F025, and F026 SHUT by observing GREEN light ON for each valve. CUE: COMMENTS: t SAT UNSAT l l Page 6 of10

j CLINTON POWER STATION-JOB PERFORMANCE MEASURE WORKSHEET i JPM NUMBER: NRC6 REVISION: 0 i 1 8,1.6.8 - Verify following valves shut: i a) lE51-F013, RCIC Pump Disch To Rx Outbd Isol Valve. ' b) . IE51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool. 5 STANDARD:  : Verifies 1E51-F013 and 1E51-F019 SHUT by observing GREEN light ON for each valve. i i CUE. , I COMMENTS: SAT UNSAT + I 8.1.6.9 . Reset the RCIC Turbine Trip & Throttle Valve as follows: J

                           - a)       Place 1E51-C002, RCIC Turbine Trip Viv Opr switch to CLOSE to reset the RCIC Turbine Trip & Throttle Valve.

b) 'Open 1E51-C002, RCIC Turbine Trip Viv Opr (Stem). STANDARD:

Takes handswitch for 1E51-C002 to CLOSE and verifies GREEN light ON. Takes handswitch for IE51-C002 to OPEN and verifies RED light ON.

CUEi l

          ' COMMENTS:

SAT UNSAT I i n Page 7 of 10 L L l - -

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 6 REVISION: 0-8.1.6.10 ' Stop the Gland Seal Air Compressor STANDARD: Takes handswitch for Gland Seal Compressor to STOP and observes GREEN light ON.

i. CUE:

COMMENTS: SAT UNSAT 8.1.6.11 Shut 1E51-F046, RCIC Pmp Supp To Turb Lube Oil Clr. STANDARD: Takes handswitch for 1E51-F046 to CLOSE and verifies GREEN light ON.

    ' CUE:
     . COMMENTS:

l SAT UNSAT l 8.1.6.12 Verify RCIC Pump Flow Cont,1E51-R600 set to 600 gpm/ AUTO. STANDARD: j Verifies IE51-R600 set to 600 gpm and in AUTO. CUE: COMMENTS: l SAT UNSAT I i Page 8 of10 n

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET ~  ! JPM NUMBER: NRC6 REVISION: 0

    .. TERMINATING CUES:                                                                                      -
     ' RCIC is shutdown
              ' STOP TIME:

1 5 r A h i L I l I 1 I l L l: i [ Page 9 of 10  ; i. l -

CLINTON POWER STATION I JOB PERFORMANCE MEASURE WORKSHEET i JPM NUMBER: ' NRC 6 REVISION: 0 K/A REFERENCE NUMBERS Imnortance Ratine K/A SYSTEM NUMBER K/A NUMBER RO SR_O 1 l l l I Page 10 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 1 The plant was operating at ~54% power with the 'B' TDRFP having been shutdown for troubleshooting following a trip. A small break LOCA occurred causing a high drywell pressure condition. Subsequently, RPV level dropped to Level 2 and RCIC auto started. Shortly thereafter, RCIC tripped and isolated. Why did RCIC trip and isolate and what caused the condition that led to the trip and isolation?

   -ANSWER:

RCIC isolated on a high area temperature which caused the trip. The high temperature was caused by the failure of the gland seal air compressor to auto start on an initiation signal because it had been shunt tripped on the high drywell pressure signal. REFERENCE (S): CPS 3310.01

RESPONSE

SAT UNSAT - l Page1of3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION THIS IS A CLOSED BOOK QUESTION QUESTION NO.: 2 What is the response of the RCIC system if aligned in the CST to CST mode to an increasing Suppression Pool Level? ANSWER: lE51-F031, RCIC Suppr Pool Suction Valve, opens IE51-F010, RCIC Storage Tank Suction Valve, closes lE51-F022, RCIC Pmp First Test Valve to Stor Tank, closes lE51-F059, RCIC Pmp Second Test Valve to Stor Tank, closes Pump runs on minimum flow REFERENCE (S): CPS No. 3310.01

RESPONSE

SAT UNSAT Page 2 of 3

l 1 CLINTON POWER STATION l: JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION imnortance Ratine K/A SYSTEM NUMBER . K/A NUMBER RO SRO 217000 A2.01 3.7 - 217000 A2.12 3.4 JTA: TASK NUMBER ANSWER TIME: Min i ORIGINATED / REVISED BY: / REVIEWED BY: / j APPROVED BY: /

                                  - Supervisor - Requalification and Operations Training i

h c { Page 3 of 3 l l e

1 .:; ...

f. CLINTON POWER STdTION
                                             ' JOB PERFORMANCE MEASURE l                                                      OPERATOR COPY                                                                                ,

la INITIATING CUE , RCIC is currently operating in tank to tank mode. Shutdown RCIC per CPS No. 3310.01 e .. a T o i

                                                                                                                                                     )

l l i

                                                                                                                                                    )

i i i l 4 1 r t: t-I I 1 Y 1 Page1of1 ' l

                                                                     ' CPS No. 3310.01 8.1.6      Shutdown - Initiation Signal Cicar                                    ,

9 NOTE Do not secure or place RCIC in manual override unless directed to per the EOPs, or by at least two independent indications: , a) misoperation in automatic mode is confirmed, b) adequate core cooling is assured. - Minimize time on RCIC Min flow per Limitation 6.2.5. 8.1.6.1 If necessary, depress RCIC SEAL IN RESET push-button. O 8.1.6.2 Shut (if open) 1E51-F022, RCIC Pmp First Test Valve To Stor Tank. 8.1.6.3 Shut 1E51-F095, RCIC Turb Stm Supp Bypass Valve. , 8.1.6.4 Trip RCIC turbine from 1H13-P601 by depressing , the RCIC TURBINE REMOTE TRIP push-button. O 8.1.6.5 Shut (if open) 1E51-F059, RCIC Pmp Second Test Valve To Stor Tank. 8.1.6.6 Shut / verify shut 1E51-F045, RCIC Turb Stm Supp Shutoff Valve. NOTE 1E51-F005 is normally closed and opens as required by a level signal from the turbine exhaust drain pot. 8.1.6.7 After 1E51-F045 closes, L verify the following valves open automatically: , a) 1E51-F004, RCIC Turb Exh Drn To RF First Isol Vlv. b) 1E51-F025, RHR & RCIC Stm Supp First Drn Isol Valve. c) 1E51-F026, RHR & RCIC Stm Supp Second Drn Isol Valve. 8.1.6.8 Verify following valves shut: a) 1E51-F013, RCIC Pump Disch To Rx Outbd Isol Valve. l b) 1E51-F019, RCIC Pmp Min Flow Recirc To Suppr Pool . l L 9 8.1.6.9 Reset the RCIC Turbine Trip & Throttle Valve as follows: I a) Place 1E51-C002, RCIC Turbine Trip Vlv Opr switch to CLOSE to reset the RCIC Turbine Trip & Throttle Valve. b) Open 1E51-C002, RCIC Turbine Trip Vlv Opr (Stem). i 8.1.6.10 Stop the Gland Seal Air Compressor.

!                   8.1.6.11 Shut 1E51-F046, RCIC Pmp Supp To Turb Lube Oil Clr.

8.1.6.12 Verify RCIC Pump Flow Cont, 1E51-R600 set to 600 gpm/ AUTO. Rev. No. 17 Page No. 16 of 31

   '~ ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0 TASK TITLE: Purve Primary Containment Usine VG TASK NUMBER: Oll261C505 APPLICABILITY: RO X SRO X TRAINEE DATE EVALUATOR METIIOD OF TESTING: Simulated Performance Actual Performance X . Classroom Simulator X Plant APPROXIMATE TIME FOR COMPLETION: 15 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date:

Supervisor - Operations Training Page 1 of15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0 READ TO THE OPERATOR 1 will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: Any suitable IC with VG trains in standby and containment pressure < 2.6 psig. TASK STANDARDS: Primary Containment purged using SGTS per CPS No. 3319.01 TOOLS, EQUIPMENT, OTIIER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3319.01, STANDBY GAS TREATMENT (VG), Section 8.2.5 EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: It has been decided to purge primary containment following completion of painting. The CRS directs you to purge primary containment using Stanby Gas Treatment.  ;

                                                                                                                    )

START TIME: i i l Page 2 of 15 i 1

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET ! JPM NUMisER. NRC 7 REVISION: 0

   =           = = - - -

PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Perfonnance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. a PERFORMANCE STEPS JPM TITLE: Purge Primary Containment Using Standby Gas Treatment (VG) CAUTION SBGT should not be used if area being ventilated is > 212 F. NOTE  : CNMT purge is not o available if CNMT pressure is l 2 2.6 psid. This interlock shall nqt be defeated to run VO for CNMT purge. (Actual setpoint 2.56 psid, SPDS reads only to tenths). 8.2.5.1 Verify CNMT pressure < 2.6 psid by observing HI CNMT PRESS white indicating light - (above IVG0lYA/B switch) OFF. STANDARD: Verifies containment pressure < 2.6 psid by observing HI CNMT PRESS WHITE light OFF. CUE: COMMENTS: SAT UNSAT l l Page 3 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0 8.2.5.2 Notify Radiation Protection to verify 0PR03S or OPR04S in service and Chemistry Department should be notified immediately after establishing flow. STANDARD: Notifies RP to verify OPR03S or OPR04S in service CUE: 1 OPR03S is in service

   . COMMENTS:

1 SAT UNSAT l l

       '8.2.5.3      Position the selected train's IVG02YA(B), Fuel Building Isolation Damper control    i switch to CLOSE and verify:                                                         I a)      IVG02YA(B) closes. (ifopen) b)     1VG04YA(B), SGTS TRN A(B) Pmp Rms Suction Damper closes.

c) 1VG05YA(B), SGTS TRN A(B) Fuel Bldg Suct Dmpr closes (if open) d) 1VG06YA(B), SGTS TRN A (B) ECCS Rms Suct Dmpr closes. STANDARD: l I Takes handswitch for IVG02YA to CLOSE and verifies GREEN light ON for 1 VG02YA, IVG04YA, i 1VG05YA, and 1VG06YA. CUE: l COMMENTS: I SAT UNSAT ._ 2 Page 4 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET I i JPM NUMBER: NRC7 REVISION: 0 c NOTE , In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 when in MODE 1,2, & 3, the following valves shall be sealed closed under administrative control to assure that they cannot be inadvertently opened. e Obtain Shift / Assistant Shift Supervisors approval to perform the following step.

     '8.2.5.4      Open IVQ006A and IVQ006B, Containment Building Exhaust Isolation Bypass                       ]

dampers. l STANDARD: Requests permission to complete step 8.2.5.4 and open iVQ006A and 1VQ006B. After receiving permission, takes handswitch for IVQ006A/6B to OPEN and observes RED light for each damper. CUE: I Open IVQ006A and IVQ006B 4 l COMMENTS: l

                                                                                                               . i 1

SAT UNSAT I . l Page 5 of 15

CLINTON POWER STATION 4 JOB PERFORMANCE MEASURE WORKSIIEET JPM NUMBER: NRC7 REVISION: 0 NOTI! Starting an Exhaust Fan will automatically close 1VG016YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, and 1VG017YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper.

      *8.2.5.5   Place the selected train in service by starting its respective Exhaust Fan,           j 0VG02CA(B).                                                                           !

STANDARD: l Takes handswitch for OVG02CA Exhaust Fan to START and observes RED light ON. l CUE: COMMENTS: SAT UNSAT Page 6 of 15 t

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET ! JPM NUMBER: NRC7 REVISION: 0 l NOTE The SGTS Trn A(B) DW Purge Isolation Damper, IVG0lYA(B) will not open if Containment pressure is 2.6 psid or more. For the following steps, the flow rate for SGTS will be substantially less than the nominal flow of 4000 SCFM due to piping restrictions. The flow should be about 400 - 500 SCFM.

  • 8.2.5.6 If the white Permissive light is unlit (indicating less than 2.6 psid Containment pressure),

then open IVG01YA(B), SGTS Trn A(B) DW Purge Isolation Damper by positioning its control switch to PURGE.

     ' STANDARD:                                                                                                                      .

Verifiet WHITE Permissive light is UNLIT and takes handswitch for IVG01YA to PURGE and observes RED light ON. CUE: i COMMENTS: SAT UNSAT I i Page 7 of 15

 ~

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 7 REVISION: 0 c N_OTE In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 t when in MODE 1,2, &3, the following valves [1VR002A(B) & , 1VQ006A(B)] shall be sealed closed under administrative control to assure that they cannot be inadvertently opened. e Obtain Shift / Assistant Shift Supervisors approval to perform the following step.

    *8.2.5.7     When Containment pressure becomes negative, open IVR002A and IVR002B, Containment Building Supply Isolation Bypass dampers.

STANDARD: Requests permission to open IVR002A and IVR002B when containment pressure becomes negative. When Containment pressure becomes negative, takes handswitch for iVR002A and IVR002B to OPEN and observes RED light ON for each damper. CUE: Open IVR002A and IVR002B when containment pressure becomes negative. COMMENTS: SAT UNSAT Page 8 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER

  • NRC 7 REVISION: 0
   '8.2.5.8     When Containment Purge with SGTS is no longer desired, close IVR002A and IVR002B, Containment Building Supply Isolation Bypass dampers.

STANDARD: Takes handswitch for iVR002A and 1VR002B to CLOSE and observes GREEN light ON for each damper. CUE: Containment purge using SGTS is no longer needed. COMMENTS: 1 SAT UNSAT

   *8.2.5.9     Close IVQ006A and IVQ006B, Containment Building Exhaust Isolation Bypass dampers..                                                                      j 1

STANDARD: l Takes handswitch for iVQOO6A and IVQ006B to CLOSE and observes GREEN light ON for each damper. CUE: COMMENTS: SAT UNSAT Page 9 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0

       *8.2.5.10    Close IVG0lYA(B), SGTS Trn A(B) DW Purge Isolation Damper by positioning its handswitch to NORMAL.

STANDARD: Takes handswitch for iVG01YA to NORMAL and observes GREEN light ON. . CUE: COMMENTS: SAT UNSAT 8.2.5.11 Verify Chemistry has performed samples as required per CPS 919940.01, WEEKLY CHEMISTRY SURVEILLANCE LOO and ODCM 3.2.2/ TBL 3.4-1 ITEM B prior to shutdown. STANDARD: Contacts Chemistry to verify samples have been performed per CPS 919940.01 CUE: Samples Lave been performed per CPS 919940.01 COMMENTS: SAT UNSAT 1 Page 10 of 15

4 CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0 140TE 1 VG016YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, and I VG017YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, will open when the Exhaust Fan is stopped.

  *8.2.5.12   Shutdown the operating SGTS train by stopping its respective Exhaust Fan, DVG02CA(B) by returning its control switch to AUTO.

STANDARD: Takes handswitch for OVG02CA to AUTO and observes GREEN light ON. CUE: COMMENTS: SAT UNSAT 1 l I l l 1 l Page11of15

~ CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC7 REVISION: 0 l 8.2.5.13 Start the SGTS TRN A(B) STANDBY CLG FAN,0VG03CA(B) per 8.2.2.1 and continue to operate the fan until such time that it has been determined that the decay heat in the charcoal absorber has decreased to the point where 'he Cooling Fan is no longer needed. (Refer to section 8.2.2.2 for shutting down the fan.)

 *8.2.3.1   Start Cooling Fan,0VG03CA(B), and verify that the following dampers open:

a) 0VG03YA(B), SGTS TRN A(B) Cont. Bldg Iso! Damper b) 0VG04YA(B), SGTS TRN A(B) Clg Fan 3CA(B) Exh Damper c) OVG05YA(B), SGTS TRN A(B) Exh Fan (Stack) Damper P STANDARD: Takes handswitch for OVG03CA to START and observes RED light ON. Verifies RED light ON for dampers OVG03YA,0VG04YA, and OVG05YA. CUE: COMMENTS: SAT UNSAT I I Page 12 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC7 REVISION: 0

    *8.2.5.14      Position IVG02YA(B), Fuel Bldg Isolation Damper control switch to AUTO and verify IVG04YB, Pump Rooms Suction Damper, opens (IVG04YA remains closed).

STANDARD: Takes handswitch IVG02YA to AUTO and verifies RED light ON for IVG04YB. Verifies IVG04YA GREEN light ON. CUE: COMMENTS: SAT UNSAT 8.2.5.15 If desired, establish Containment Building ventilation / purge per CPS No. 3408.01, CONTAINMENT BUILDING /DRYWELL HVAC (VR, VQ). STANDARD:

                                                                                                          ~

Requests direction to establish Containment Building ventilation. CUE: Will not be established at this time. COMMENTS: SAT UNSAT Page 13 of 15 1

  • i t  !

CLINTON POWER STATION l i i-L JOB PERFORMANCE MEASURE WORKSHEET l- l l ' JPM NUMBER: NRC7 REVISION: 0 TERMINATING CUES: I l Containment Purge using SGTS has been completed. STOP TIME: I I t r t l i t t l t 1 p l o Page 14 of15 6 1

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l j JPM NUMBER: NRC7 REVISION: 0 K/A REFERENCE NUMBERS Importance Ratine K/A SYSTEM NUMBER K/A NUMBER RO SRO l l l l l 1 1 Page 15 of 15

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION l THIS IS A CLOSED BOOK QUESTION 1 QUESTION NO.: 1 Given the following conditions: A complete Standby Gas Treatment System initiation signal was received.

        .      Both Standby Gas Treatment Trains started as designed.

l The "A" Standby Gas Treatment Train was manually secured by the BCRO.

        .      The "B" Standby Gas Treatment Train is currently operating.

What condition will automatically start the "A" Standby Gas Treatment Train? ANSWER:

Low flow in the operating train (Standby Gas Treatment Train).

REFERENCE (S): CPS No. 3319.01

RESPONSE

l l SAT UNSAT l l 1 l l l Page 1 of 3

r CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 2 Describe how the Standby Gas Treatment Fystem (SGTS) and ventilations systems will respond to a CCP Exhaust High Radiation Signal. ANSWER: All SGTS controlled ventilation systems (Fuel Building, Containment Building, Containment /Drywell Purge, and CCP HVAC) are secured.' Both trains of SGTS will start. REFERENCE (S): CPS No. 3319.01 CPS No. 3404.01 CPS No. 3408.01

RESPONSE

   ,                                                                    SAT         UNSAT Page 2 of 3

r 4 CLINTON POWER STATION l JOB PERFORMANCE MEASURE t QUESTION DOCUMENTATION 1moortance Rating e . K/A SYSTEM NUMBER K/A NUMBER RQ SRO 261000 K4.01 3.8 261000 K6.04 3.1 C

        ' JTA:

TASK NUMBER ANSWER TIME: Min i' r ORIGINATED / REVISED BY: /

   .    . REVIEWED BY:                                                         /

l-APPROVED BY: / Supervisor- Requalification and Operations Training i l I f Page 3 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE { OPERATOR COPY INITIATING CUE P

             'It has been decided to purge primary containment following completion of painting. The CRS directs you to purge primary containment using Stanby Gas Treatment.

7 i i 1 1 i Page1of1 4

+ CPS No. 3319.01 8.2.5 Using Standby Gas Treatment To Purge Primary Containment I CAUTION SBGT should not be used if area being ventilated is

                            > 212*F.

1 NOTE CNMT purge is not available if CNMT pressure is i 2 2.6 psid. This interlock shall not be defeated  ! to run VG for CNMT purge. (Actual setpoint 2.56 I psid, SPDS reads only to tenths). 1 8.2.5.1 Verify CNMT pressure < 2.6 psid by observing HI CNMT PRESS white indicating light (above IVG01YA/B switch) OFF. I 8.2.5.2 Notify Radiation Protection to verify OPR03S or.0PR04S in service and Chemistry Department should be notified  ; immediately after establishing flow. 8.2.5.3 Position the selected train's IVG02YA(B), Fuel Building Isolation Damper control switch to CLOSE and verify: a) 1VG02YA(B) closes. (if open) b) 1VG04YA(B), SGTS TRN A(B) Pmp Rms Suction Damper closes. c) 1VG05YA(B), SGTS TRN A(B) Fuel Bldg Suct Dmpr closes. (if open) , d) 1VG06YA(B), SGTS TRN A (B) ECCS Rms Suct Dmpr closes. c NOTE

                        -In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 when in MODE 1,                                             2, & 3,     the following valves shall be sealed closed under administrative control to assure that they cannot be inadvertently opened.                                                                                                       i G"

Obtain Shift / Assistant Shift Supervisors approval to perform the following step. , 8.2.5.4 Open IVQOO6A and IVQOO6B, Containment Building Exhaust Isolation Bypass dampers. Rev. No. 13- Page No. 16 of 20

CPS No. 3319.01 NOTE Starting an Exhaust Fan will automatically close IVG016YA (B) , Fuel Bldg Exh Inbd (Outbd) Isol Damper, and IVG017YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper. 8.2.5.5 Place the selected train in service by starting its I respective Exhaust Fan, 0VG02CA(B).

                                                                                 ]

NOTE The SGTS Trn A(B) DW Purge Isolation Damper, IVG01YA(B) will not open if Containment pressure is 2.6 psid or more. For the following steps, the flow rate for SGTS will be substantially less than the nominal flow of 4000 SCFM due to piping restrictions. The flow should be about 400 - 500 SCEM. 8.2.5.6- If the white Permissive light is unlit (indicating less than 2.6 psid Containment pressure), then open 1VG01YA(B), SGTS Trn A(B) DW Purge Isolation Damper by positioning its control switch to PURGE. C NOTE In accordance with ITS ORM Attachment 4, Section 1, Items #48 and #49 when in MODE 1, 2, &3, the following valves (1VR002A(B) & IVQ006A(B) ] shall be sealed closed under administrative control to , assure that they cannot be inadvertently opened. Obtain Shift / Assistant Shift Supervisors approval to perform the following step. 8.2.5.7 When Containment pressure becomes negative, open IVR002A and IVR002B, Containment Building Supply Isolation Bypass dampers. I 8.2.5.8 When Containment Purge with SGTS is no longer desired, close IVR002A and IVR002B, Containment Building Supply Isolation Bypass dampers. 8.2.5.9 Close IVQ006A a'nd IVQ006B, Containment Building Exhaust l Isolation Bypass dampers. i I 8.2. 5.10 Close 1VG01YA (B) , SGTS Trn A(B) DW Purge Isolation Damper l by positioning its handswitch to NORMAL. Rev. No. 13 Page No. 17 of 20 i j

__m.._._._ mm. .-. _ _ _ _ . , _ _ _ _ _ _ _ _ . _ . _ . _ . _ _ _ _ _ _ . . _ . _ . _ . . _ _ . _ _ CPS No. 3319.01 c 8.2.5.11 Verify Chemistry has performed samples as required per CPS 919940.01, WEEKLY CHEMISTRY SURVEILLANCE LOG and ODCM 3.2.2/ TBL 3.4-1 ITEM B prior to shutdown. NOTE IVG016YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, and IVG017YA(B), Fuel Bldg Exh Inbd (Outbd) Isol Damper, will open when the Exhaust Fan is stopped. ' '8.2.5.12 Shutdown the operating SGTS train by stopping its respective Exhaust Fan, OVG02CA (B) by returning its control switch to AUTO. ' 8.2.5.13 Start the SGTS TRN A(B) STANDBY CLG FAN, OVG03CA(B) per 8.2.2.1 and continue to operate the fan until such time ' that it has been determined that the decay heat in the charcoal absorber has decreased to the point wh'ere the Cooling Fan.is no longer needed. (Refer to section 8.2.2.2 for shutting down the fan.) 8.2.5.14 Position IVG02YA(B), Fuel Bldg Isolation Damper control switch to AUTO and verify IVG04YB, Pump Rooms Suction Damper, opens (1VG04YA remains closed).  ; 8.2.5.15 If desired, establish Containment Building l ventilation / purge per CPS No. 3408.01, CONTAINMENT BUILDING /DRYWELL HVAC (VR, VQ). 1 8.3 Abnormal Operation None - l 9.0 ACCEPTANCE CRITERIA None 10.0 FINAL CONDITIONS

                        ,   None Rev. No. 13'                                                                                                 Page No. 18 of 20
    .                                  CLINTON POWER STATION                                     !

JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC8 REVISION: 0 ' l TASK TITLE: Startun a Steam Bvnass Hydraulic Power Unit TASK NUMBER: 041248C517 l APPLICABILITY: RO X SRO X TRAINEE DATE EVALUATOR METIlOD OF TESTING: Simulated Performance X Actual Performance Classroom Simulator Plant X , I APPROXIMATE TIME FOR COMPLETION: _20_ minutes _ I l 1 Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations i

 - Approved by:                                                     Date:

Supervisor - Operations Training l 1 i Page 1 of 10 l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-Up CONDITIONS: None TASK STANDARDS: Operator actions performed per CPS No. 3105.04 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

CPS No. 3105.04, STEAM BYPASS AND PRESSURE REGULATOR (SB) . EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE:

   . A plant is currently in an outage. You are directed to start the 'A' Steam Bypass HPU for testing . The standby pump is unavailable.

START TIME: 1 l Page 2 of 10 l j

CLINTON POWER STATION JOB H,RFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 m PERFORMANCE INFORMATION Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. m. PERFORMANCE STEPS JPM TI1LE: Startup a Steam Bypass Hydraulic Power Unit NOTE The followmg startup refers to the HPU associated with the steam bypass valves. The operation of the Steam Bypass and Pressure Regulation (SB) system will be per the plant startup/ shutdown integrated 300X.01 series. Temperature of the fluid must be 2 90 F before the pumps are started. 8.1.1a) E: Fluid temperature is < 90 F, TIIEN: Turn on space heaters l A and/or IB to increase fluid temperature. b) E: Temperature is 2 90 F, TIIEN: Verify / Place space heaters l A and 1B in Auto. STANDARD: If temperature is < 90, simulates turning space heater I A ON, if temperature is 2 90, verifies space heaters l A in Auto. CUE: COMMENTS: SAT UNSAT Page 3 of10

I CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET ? s:

JPM NUMBER
NRC8 REVISION: 0 i

NOTE Following maintenance on the suction piping, the hydraulic pump or extended shutdown, the hydraulic pumps must be filled with oil before starting in order to prevent damage to the pumps, c) IE: This will be a startup following maintenance on the suction piping, the hydraulic pump or an extended shutdown. THEN: Perform the following steps to fill the pump (s):

1) Isolate and remove from service the EHC pump (s) per CPS No.1014.01, SAFETY TAGGING.
2) Clean the area around the case vent connection.
3) Fill / verified filled the EHC pump (s) with fluid through the case vent connection located on top of the pump housing.
4) Re-install the case vent connection
5) Remove the tagout that was installed in step 1. ,

l

              *d)     Open IC85-FV01, Supply HDR Bypass Valve one-half turn STANDARD:

Simulates opening IC85-FV01 one-half turn by turning the valve handwheel in the COUNTERCLOCKWISE direction ! CUE: The handwheelis turning l ! COMMENTS: SAT UNSAT l Page 4 of 10 i i l

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0

               *e)         START Hydraulic Pump 1 A (IB) by placing control switch to RUN.

STANDARD:

       ' Simulates placing Hydraulic Pump 1 A control switch to RUN CUE:

T Switch is in RUN COMMENTS: SAT UNSAT f) Verify pump discharge pressure increases STANDARD: Verifies pump discharge pressure increasing CUE: Pressure is increasing COMMENTS: SAT UNSAT Page 5 of 10 Y

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 g) IF: Motor current > 50 amps, THEN: Shut slightly IC85-FV01, Supply HDR Bypass Valve to reduce motor current amps. STANDARD: Checks motor current < 50 amps CUE: Motor current is 40 amps COMMENTS: SAT UNSAT

           *h)    Pressurize system by slowly opening IC85-FV23, Supply HDR Isol Valve, and
   +

simultaneously slowly shutting IC85-FV01, Supply HDR Bypass Valve. I i STANDARD: j i Simulates simultaneously slowly opening IC85-FV23 and slowly shutting 1C85-FV01. I CUE: Handwheels are turning. ' COMMENTS: SAT UNSAT Page 6 of10

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 i) IfE: Pump discharge pressure is not between 1600 - 1650 psig, THEN: Adjust the compensator on the pump as necessary to maintain pressure within the band. STANDARD:

 . Verifies pump discharge pressure is between 1600 - 1650 psig CUE:
 ! Pressure is 1625 psig COMMF.NTS:

SAT UNSAT j) Place Control Switch for Hydraulic Pur.ip not started in AUTO.

                                                                                                      -1 STANDARD:

Simulates placing the control switch for Hydraulic Pump IB in AUTO. CUE: Switch is in AUTO COMMENTS: SAT UNSAT

                                                                                                        '1
                                                                                                        )

Page 7 of 10 i l l i

CLINTON POWER STATION , i JOB PERFORMANCE MEASURE WORKSHEET ' l JPM NUMBER: NRC8 REVISION: 0 NOTE i Step k is not required if the system was started up for testing during a outage or the standby pump is unavailable. l k)' Perform Section 8.2.5 Testing Pumps Auto Start Features. !. STANDARD: No action. System was' started for testing.

     . CUE:

l [. ' COMMENTS: l SAT UNSAT i 9 i. l NOTE ! Fuller's Earth Filter System should be in operation as much as possible.

1) If desired place the Fuller's Earth Filter in service per section 8.2.3.

j- 1 l STANDARD: l l No action. p CUE: DThe Fuller's Earth Filter system will not be put in operation. COMMENTS: e SAT UNSAT' p Page 8 of 10 L

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 8 REVISION: 0

              . TERMINATING CUES:

The 'A' Steam' Bypass HPU has been started for testing. STOP TIME: i o

h 4

Page 9 of 10

    . _  - . . _ _ ~ . __    __      .    ......_.. ._.. . _ __. - __- _ _ . _ _ .                           .. . _ . ,

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC8 REVISION: 0 4 l l K/A REFERENCE NUMBERS i i Imnortance Ratine K/A SYSTEM NUMBER K/A NUMBER RO SRO l l l l t l i i-Page 10 of 10

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 1 The plant is oper.' ting at full power and all conditions are stable. The following changes in plant l parameters are observed: l Main Generator Mwe increasing I

      ~ Reactor Power increasing Reactor Pressure increasing Turbine Control Valves closing RGLTR ERROR indicating light illuminated MODULE 1(2,3) TRIPPED indicating light on 1H13-P637 illuminated What has occurred?

ANSWER: Pressure Regulator failure LOW I REFERENCE (S)- 4 EHC System System Flow Path

RESPONSE

I SAT UNSAT Page1of3

   .       _        .m    .      _ __ _          .          _ __ ___          -    __    ._       _      __

CLINTON POWER STATION JOB PERFORMANCE MEASURE

                                        - QUESTION DOCUMENTATION QUESTION kO.:                  2 The plant is operating with one of the Steam Bypass & Pressure Control pressure regulators in TEST when the remaining pressure regulator fails HIGH. Plant pressure begins to decrease due to the Bypass Valves opening. What SB&PC control can be used to close the Bypass Valves?

ANSWER: Maximum Combined Flow Limiter REFERENCE (S): - EHC System Signal Flow Path

RESPONSE

SAT UNSAT j Page 2 of 3

_ _ . . . . _ . . . _ _ . - _ . _ ~ _ . . . . . _ . _ _ _ . _ _ _ . _ - _ . _ _ _ . .

  ~          -

CLINTON POWER STATION JOB PERFORMANCE MEASURE l <- QUESTION DOCUMENTATION l i i Importance Ratine i , K/A SYSTEM NUMBER JC/A NUMBER O R_O_ SRO 1 241000- A2.01 3.7 241000 A2.03 4.2 l Ebl '

           . TASK NUMBER ANSWER TIME:         Min                                                                                                                         f l

i

l. ORIGINATED / REVISED BY: / i t

REVIEWED BY: / '

          . APPROVED BY:                                                                                                    /

Supervisor- Requalification and Operations Training i r l. I i '. 1 Page 3 of 3

      '                                                                                                                                                      t CLINTON POWER STATION                                                                         I JOB PERFORMANCE MEASURE                                                                           ;

OPERATOR COPY- I INITIATING CUE .

              . A plant is currently in an outage. You are directed to start the 'A' Steam Bypass HPU for testing . The                                      !
               ' standby pump is unavailable                                                                                                                 -

t r i I i

                                                                                                                                                             ?

I i i I i

                                                                                                                                                            .i i

i

                                                                                                                                                             ?

i

                                                                                                                                                             /

i i a i Page1of1 , t

                   \

i-

CPS No. _3105.04 8.0 I-ROCEDURE i 8.1 Normal Operation ' 8.1.1 Startup i NOTE The following startup refers to the HPU associated with the steam typass valves. The operation of the Steam Bypass and Pressure Regulation (SB) system will be per the plant startup/ shutdown integrated 300X.01 series. Temperature of the fluid must be 2 90*F before the pumps are started. a) IE: Fluid temperature is < 90*F, THEN: Turn on space heaters 1A and/or 1B to increase fluid temperature. b) IF: Temperature is 2 90'F, THEN: Verify / Place space heaters 1A and 1B in Auto. NOTE Following maintenance on the suction piping, the hydraulic pump or extended shutdown, the hydraulic pumps must be filled with oil before starting in-order to prevent damage to the pumps. 8 c) IF: This will be a startup following maintenance on i the suction piping, the hydraulic pump or an i extended shutdown. l 1 THEN: Perform the following steps to fill the pump (s): i

1) Isolate and remove from service the EHC  !

pump (s) per CPS No. 1014.01, SAFETY TAGGING. 1

2) Clean the area around the case vent connection.
3) Fill / verified' filled the EHC pump (s) with fluid through the case vent connection located on top of the pump housing.

i

4) Re-install the case vent connection. l i
5) Remove the tagout that was installed in step 1.

Rev. No. 7 Page No. 10 of 25 I I 1

      -- .          .. .          . - .      . .       .      -    - .-      .-   .     .   .  . ~ . -  _ . - .   -

CPS No. 3105.04 . 8.101 Startup (cont'd) d) Open 1C85-FV01, Supply HDR Bypass Valve one-half turn. e) START Hydraulic Pump 1A (1B) by placing control switch to RUN. f) Verify pump discharge pressure increases. g) IF: Motor current > 50 amps, t THEN: Shut sl'ightly 1C85-FV01, Supply HDR Bypass , Valve to reduce motor current amps. ' h) Pressurize system by slowly opening IC85-FV23, Supply 1 j HDR Isol Valve, and simultaneously slowly shutting i 1C85-FV01, Supply HDR Bypass Valve. . O 1)- IF: Pump discharge pressure is not between 1600 - 1650 psig, THEN: Adjust the compensator on the pump as necessary

                                                         .to maintain pressure within the band.

j) Place Control Switch for Hydraulic Pump rot started in t AUTO. NOTE  ! Step k is not required if the system was started up for testing during a outage or the standby pump is , unavailable. ' k) Perform Section 8.2.5 Testing Pumps Auto Start i Features. NOTE-Fuller's Earth Filter System should be in operation l as much as possible. l

1) If desired place.the Fuller's Earth Filter in service i

per section 8.2.3. l Rev. No. T Page No. 11 of 25

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION. O TASK TITLE: Respond to a Failed Transponder TASK NUMBER: 011201C529 APPLICABILITY: RO X SRO X TRAINEE DATE EVALUATOR 1 METHOD OF TESTING: Simulated Performance X Actual Performance Classroom Simulator . Plant X - APPROXIMATE TIME FOR COMPLETION: 45 minutes Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: , Supervisor- Operations Training Page1of13 j

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 i READ TO THE OPERATOR I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. i SIMULATOR SET-UP CONDITIONS: Not Applicable. TASK STANDARDS: . l Rod Drive bypassed, directional control valves disarmed, and RCIS reset per CPS No. 3304.02 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None PROCEDURAL /

REFERENCES:

i CPS No. 3304.02, ROD CONTROL AND INFORMATION SYSTEM (RCIS) EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. l INITIAL CONDITIONS AND INITIATING CUE: l Control rod 20-25 in INOP due to a failed transponder card. RCIS is needed to support current plant !- conditions. You are directed to bypass control rod 20-25 and reset RCIS. START TIME: Page 2 of13 i

          .        .                       =.          --         _-      . - . -        _.                        . .
 ~

CLINTON POWER STATION l JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9, REVISION: 0 i l PERFORMANCE INFORMATION

Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED, l letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance ,

Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. i l PERFORMANCE STEPS  ! I JPM TITLE: Respond to a Failed Transponder l t 1

                                                                                                                       \

NOTE j ! The required position of the control rod / drive is specified in ITS LCOs 3.1.3 l and 3.9.4. l Only one rod can be bypassed at a time at the RGDC. l l The bypassed rod's normal drive motion is inhibited when bypassed. 8.2.10.1 IE A failed transponder card is present, and RCIS is needed to support current

                                                                                                                 '     l plant conditions /surveillances, THEN         To prevent inadvertent rod motion when resetting RCIS,                               j i

L a) First: Perform section 8.2.10.3 to electrically disarm the l directjonal control valve. l b) Second: Perform section 8.2.10.2 to bypass the drive's l transponder card & reset RCIS 1 Page 3 of 13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 NOTE Electrically disarming a second INOP control rod will shut down RCIS. 8.2.10.3 To electrically disarm the directional control valves of the subsequent INOP control rods as governed by ITS LCO 3.1.3, or for Transponder Card Failures:

             *a)

Remove the amphenol connectors, and place CAUTION TAGS on the directional control valves disconnected at the transponder card (CNMT 755') for the INOP control rod drive (s): e JIE (insert exhaust) e JWE (withdraw exhaust) e JWS (withdraw supply) e JIS (insert supply) STANDARD: Simulates removing amphenol connectors JIE, JWE, JWS, and JIS. Sinalates placing Caution Tags on the disconnected directional control valves. CUE: Amphenol connectors are removed and caution tags placed. COMMENTS: SAT UNSAT r Page 4 of 13

                                                                                          .-                   ~-

CLINTON POWER STATION 4 JOB PERFORMANCE MEASURE WORKSHEET I l JPM NUMBER: NRC9 REVISION: 0 1 1 b) To restore the drive when the control rod is OPERABLE: (OK to defer while continuing on in procedure):

1) Clear CAUTION TAGS l
2) Reconnect the amphenols to the transponder card.

l STANDARD: 1 Continues to 8.2.10.2 I CUE: l i 1 1 COMMENTS: i SAT UNSAT 8.2.10.2 To bypass the directional control valves for the first INOP control rod, or for Transponder Card failures: l

  • a) Locate the drive to be disarmed / bypassed on the Rod Gang Drive Cabinet (RGDC)

Fault Map Legend. Transponder card faulure location will have an illuminated area for the Transponder that has a fault. STANDARD: Locates drive to be disarmed / bypassed on RGDC Fault Map Legend. CUE: After rod identified, cue that area is illuminated. COMMENTS: ! SAT UNSAT t i. Page 5 of 13 i l

~ CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l l JPM NUMBER: NRC9 REVISION: 0

  • b) Using the legend data on the right and bottom of the legend, identify the binary values for the drive to be disarmed / bypassed.

STANDARD: Identifies the binary values for the drive to be disarmed / bypassed CUE: COMMENTS: SAT UNSAT

  • c) On the analyzer card of the RGDC, set the ten BYPASSED ROD IDENTITY TOGGLE SWITCHES (1 = Switch up,0 = Switch down) using the binary values found on the Fault Map Legend.

STANDARD: Simulates setting toggle switches either up or down in accordance with the binary value determined from the Fault Map Legend CUE: Toggle switch up (or down) COMMENTS: SAT UNSAT Page 6 of 13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 d) Have a second licensed operator verify that the correct rod identity is selected.

    - STANDARD:
    . Requests that a second licensed operator verify the correct rod identity is selected.

CUEi As the second licensed operator, if the correct rod identity is selected, cue that the identity is correct. l COMMENTS:

SAT UNSAT
  • e) Position the rod BYPASS toggle switch "up" to bypass the rod.

4 STANDARD: Simulates placing the rod BYPASS toggle switch "up" d CUE: 1 Switch is UP COMMENTS: SAT UNSAT Page 7 of 13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 f) Reset RCIS per 8.2.9.3 and 8.2.9.4 8.2.9.3 To reset RCIS

              *a) Verify POWER GATE breaker CB2 is ON.

If found to be OFF, then with SS/ ASST.SS permission, place breaker CB2 to ON. ! System configuration may need to be checked per 5.0 Prerequisites. STANDARD: Verifies POWER GATE breaker CB2 is ON. I CUE: I COMMENTS: SAT UNSAT l

  • b) Depress the RGDS STATUS INOPERATIVE RESET pushbutton in 1H13-P653 until the INOPERATIVE, SCAN ERROR, and MASTER ERROR lights  !

extinguish. STANDARD: Simulates depressing RGDS Status Inoperative Reset pushbutton. CUE: Inoperative, scan error, and master error lights are extinguished. COMMENTS: SAT UNSAT Page 8 of 13 i

                                                                                                                 ~ -. -- q
         ~

1 _ CLINTON POWER STATION I JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC9' REVISION: 0 l l c) . IE RCIS does Eqt properly RESET after the initial attempt in 'b' above, l THEN Wait ~ 20 seconds before trying to RESET the system a second  ; blow. 8.2.9.4 - After RCIS has been reset, perform an OD-7 Option 2 (or Option 4) and compare to . previous rod position information. l STANDARD: 1 Requests an OD-7 Option 2 i CUE: l Rod positions have been compared to previous rod position information. COMMENTS: I SAT UNSAT g) ' Depress DRIVE BYPASSED pushbutton to display on the OCM that the correct rod was bypassed.. STANDARD Simulates depressing Drive Bypassed pushbutton I l CUE: OCM display indicates the correct rod. COMMENTS: SAT UNSAT-1 i Page 9 of13

     . . , -   - - . - . . . -         . - .       . . . - , . -     - - . . . - . - - - ~ . . . . - . . _ . . - .                        _ - . . . . - .

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 { CAUTION , In GANG mode, selecting / moving'a rod in the same gang will cause the bypassed rod to move also. If GANG mode is used for any reason extreme caution should be used to avoid moving the bypassed rod. h) Place CAUTION TAGS to maintain the DRIVE MODE select push-button in the " INVALID DRIVE" position, and provide information about the possible effect of-using gang mode.. t STANDARD:

    . Simulates placing Caution Tags on Drive Mode select pushbutton.

CUE:  ; Caution Tags are hung COMMENTS: SAT UNSAT

                                                                                                                                                           )

Page 10 of 13 F .-d

   .-..~ ~                _   _.      _ . . . _ _ -          __ -._-.___ ._ _. .. ___ _ _-__ _-.._. _ _ . _ _                   . _. _   .

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC9 REVISION: 0 i) . To restore the drive when the control rod is OPERABLE (OK to defer while l continuing on in procedure. " i 1)- Clear CAUTION TAGS. ,

2) At the RGDC, position the rod BYPASS toggle switch,"down" to unbypass the rod.
3) ...On the analyzer card of the RGDG, set the ten BYPASSED ROD IDENTITY l toggle switches to the "down (0) position.  :

i 4) . ' Depress DRIVE BYPASSED push-button to display on the OCM that the rod in no longer bypassed. l STANDARD: No action required CUE:

             - Drive will not be restored.                                                                                                      l COMMENTS:

SAT UNSAT 4

 +

Page 11 of13

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET  ! JPM NUMBER: NRC9 REVISION: 0 TERMINATING CUES: Control rod 20-25 is bypassed and RCIS is reset. STOP TIME: 9 I I j l 1 Page 12 of 13 ) l i

 . . . _ .     . . . . _ , . . _. _   _m _ __    . _ _ _ _ . . _ . _ . . _ . . . . . _ . . _ _ . _ . _ .        . . _ . . _ _ _ _ _ _ . . _ . . _ _ . . . . . .

CLINTON POWER STATION

                                                                                                                                                                     )

JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC 9 REVISION: 0 1 l K/A REFERENCE NUMBERS l Importance Ratine K/A SYSTEM NUMBER K/A NUMBER RO SRO 1 1 1 l 1 I l l l 1 i j Page 13 of 13

CLINTON POWER STATION ) JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 1 A reactor startup is in progress. During the performance of CPS No. 9014.02, ROD PATTERN CONTROL SYSTEM ROD SEQUENCE CHECK, an out of sequence control rod was selected and moved one notch. What is the effect on the reactor startup? l ANSWER:

    - The reactor startup must stop immediately due to the Rod Pattern Controller not performing its intended                 ;

function. Rod movement is ONLY by scram. REFERENCE (S):

    . CPS No. 9014.02 CPS ITS 3.3.2.1 Action B.1 RESPONSE:                                                                                                               ,

F SAT UNSAT t- , 1 \ I i. l l. 6 L ! .Page1of3 ). i

~ CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION THIS IS A CLOSED BOOK QUESTION TO BE ANSWERED PRIOR TO THE JPM QUESTION NO.: 2 What affect does bypassing a control rod in the Rod Gang Drive System have on the ability to move the ' bypassed control rod, individually and in gang mode? ANSWER: l The bypassed control rod if selected will not move. (The RCIS System does not know the control rod is even there). If gang mode is selected and another control rod in the 1 gang is selected the bypassed control rod will move with the rest of the gang, l REFERENCE (S): l l CPS No. 3304.02

RESPONSE

SAT UNSAT Page 2 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION Importance Ratine K/A SYSTEM NUMBER K/A NUMBER R_Q SRO

201005 K3.02 3.5 201005 Kl.06 3.3 JTAF TASK NUMBER ANSWER TIME: Min ORIGINATED / REVISED BY: /

REVIEWED BY: / ' APPROVED BY: / Supervisor- Requalification and Operations Training 1 Page 3 of 3

    -.      . . . - . .    - - -    . ~ .  . - -             . . .   . .. . - - . _  . . . .        .  --

CLINTON POWER STATION JOB PERFORMANCE MEASURE OPERATOR COPY-l INITIATING CUE Control rod 20-25 in INOP due to a failed transponder card. RCIS is needed to support current plant conditions. You are directed to bypass control rod 20-25 and reset RCIS. i t l t

                                                                                                             ]

l 1 i l 4 Page1ofI l

s 4 CPS No. 3304.02 8.2.9 AUTOMATIC SYSTEM SHUTDOWN /RCIS RESET i 8.2.9.1 If C&I is available, contact them'for an evaluation of system shutdown. If,C&I is not available, record any Red LED's that are energized at 1H13-P653, Rod Gang Drive Cabinet on CPS No. 3304.02F001, RCIS FAULT MAPS. If an MWR is written,' attach the F001 form to the MWR. ' O NOTE When RCIS is INOP (Annunciator 5006-3G), the accumulator trouble alarms are not functional. ' ORM OR 2.1.2 Action 3.3.1.a changes ITS SR 3.1.5.1/ 3.9.5.2 frequency from 7 days to every 24 hours. i c 8.2.9.2 I{ RCIS power is out and CNMT ventilation is secured (e.g., during an outage) concurrently for > 8 hours, P THEN Contact C&I to inspect at least 10% of the BJMs for moisture prior to resetting RCIS. CAUTION Do not reset the RCIS INOP if a failed transponder - card is known or suspected, unless the rod has been ' C3. disarmed & bypassed per 8.2.10.1.

                        . Inadvertent rod motion may occur otherwise.                        '

i 8.2.9.3 To reset RCIS: a) , Verify POWER GATE breaker CB2 is ON.- If found to be OFF, then with SS/ ASST.SS permission, place breaker CB2 to ON. System configuration may need to be checked per 5.0 Prerequisites. b) Depress'the RGDS STATUS INOPERATIVE RESET push-button in 1H13-P653 until the INOPERATIVE, SCAN ERROR, and MASTER ERROR lights extinguish. c c) IE RCIS does not, properly RESET after  ; the initial attempt in 'b' above, THEN Wait - 20 seconds before trying to RESET the  ! system a second time. Failure to wait may cause fuse in UPS circuit 903 to blow. l

    ,.           8.2.9.4    After RCIS has been reset, perform an OD-7 Option 2 (or Option 4) and' compare to previous rod position information.

f Rev. No. 10 - Page No. 25 of 33

                                                                                             ]

CPS Mo. 3304.02 NOTE

  ~                  The required position of the control rod / drive is specified in ITS LCOs 3.1.3 and 3.9.4.

Only one rod can be bypassed at a time at the RGDC. The bypassed rod's normal drive motion is inhibited when bypassed. 8.2.10 ROD DRIVE BYPASS / DISARMING DIRECTIONAL CONTROL VALVES 8.2.10.1 IF A failed transponder card is present,.and RCIS is needed to support current plant conditions /surveillances, l THEN To prevent inad.vertent rod motion when resetting RCIS,

                                             .                                           i a) First:   Perform section 8.2.10.3 to el~ectrically disarm the directional control valve.

b) Second: Perform section 8.2.10.2 to bypass the drive's transponder card & reset RCIS. l 1 1 I 8.2.10.2 To bypass the directional control valves for the first '

  'N INOP control rod, or for Transponder Card failures:

g a) Locate the drive to be disarmed / bypassed on the Rod Gang Drive Cabinet (RGDC) Fault. Map Legend. Transponder card failure location will have an illuminated area for the Transponder tha't has a Fault, b) Using the legend data on the right and bottom . of the legend, identify the binary values for the drive to be disarmed / bypassed. c) On the analyzer card of the RGDC, set the ten BYPASSED ROD IDENTITY toggle switches (1 - Switch up, 0 = Switch down) using the binary values found on the Fault Map Legend. O c d) Have a second licensed operator verify that the correct rod identity is selected. e) Position the rod BYPASS toggle switch "up" to bypass the rod. f) Reset RCIS per 8.2.9.3 and 8.2.9.4. g) Depress DRIVE BYPASSED push-button to display on the OCM that the correct rod was bypassed.

  ,_                                                               (*" more)

Rev. No. 10 Page No. 26 of 33

CPS No. 3304.02 8.2.10 ROD DRIVE BYPASS / DISARMING DIRECTIONAL CONTROL VALVES (cont' d) CAUTION in GnNG mode, selecting / moving a rod in the same gang will cause the bypassed rod to move also. If GANG mode is used for any reason extreme caution should be used to avoid moving the bypassed rod. 8.2.10.2 h) Place CAUTION TAGS to maintain the DRIVE MODE (cont' d) select push-button in the "INDIVID DRIVE" position, and provide information about the possible effect of using gang mode.

1) To restore the drive when the control rod is OPERABLE (OK to defer while continuing on in procedure):
1) Clear CAUTION TAGS.
2) At the RGDC, position the rod BYPASS -

toggle switch "down" to unbypass the rod.

3) On the analyzer card of the RGDG, set the ten BYPASSED ROD IDENTITY toggle switches to the "down" (0) position.
4) Depress DRIVE BYPASSED push-button to display
    <~.

on the OCM that the rod in no longer bypassed.. n NOTE Electrically disarming a second INOP control rod will shut down RCIS. 8.2.10.3 To electrically disarm the directional control valves of the subsequent INOP control rods as governed by ITS LCO 3.1.3, or for Transponder Card failures: a) Remove the amphenol connectors, and place CAUTION TAGS on the directional control valves disconnected at the transponder card (CNMT 755') for the INOP control rod drive (s): JIE (insert exhaust) JWE (withdraw exhaust)

  • JWS (withdraw supply)
  • JIS (insert supply) b) To restore the drive when the control rod is OPERABLE:

(OK to defer while continuing on in procedure): l 1) Clear CAUTION, TAGS. f.. . 2) Reconnect the amphenols to the transponder card. Rev. No. 10 Page No. 27 of 33

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 TASK TITLE: Re_ ';hnd To Abnormal Level in CCW Exnansion Tank TASK NUMBER: 044208C505

                                                                         ^

APPLICABILITY:RO X SRO X TRAINEE DATE  ; EVALUATOR METHOD OF TESTING: Simulated Performance X Actual Performance Classroom Simulator Plant X APPROXIMATE TIME FOR COMPLETION: minutes i i Prepared / Revised by: Date: Reviewed by: Date: Instructor - Operations Approved by: Date: 1 Supervisor - Operations Training i i Page 1 of 9 l

, CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 READ TO THE OPERATOR. I will explain the initial conditions, which step (s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied. SIMULATOR SET-UP CONDITIONS: None TASK STANDARDS: Operator actions performed per CPS No. 3203.01 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS: None 1 PROCEDURAL /

REFERENCES:

i CPS No. 3203.01, COMPONENT COOLING WATER (CC) , EVALUATOR INSTRUCTIONS: Amplifying cues are provided within the JPM steps. INITIAL CONDITIONS AND INITIATING CUE: There is a high level in the CCW Expansion Tank. The source of the in-leakage has been isolated. Return CCW Expansion Tank level to normal. START TIME: Page 2 of 9

CLINTON POWER STATION 1 1 JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 PERFORMANCE INFORMATION l Critical steps are denoted with a asterisk (*) to the left of the step number and appear in BOLDED i letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM. ' l PERFORMANCE STEPS I JPM TITLE: Respond To Abnormal Levelin CCW Expansion Tank

        *8.2.2.2.1      Verify ICC90, CCW Expansion Tank Makeup Valve,is isolated and ICC092, CCW Expansion Tank Makeup Valve Bypass, is shut.

STANDARD: Verifies ICC90 isolated by simulating turning valve handwheels for ICC089 and ICC091 in a CLOCKWISE direction. Verifies ICC092 shut by simulating turning valve handwheel in a CLOCKWISE direction. CUE: For each valve operated, cue that the valve handwheel is turning, then cue the valve handwheel stops turning. COMMENTS: SAT UNSAT

l. Page 3 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 8.2.2.2.2 Notify Radiation Protection to check valve lineups on 1RIX-PR037,1RIX-PR004, and 1 RIX-PR005, if source ofinleakage unknown. STANDARD: No action. Initial Conditions had the source isolated. CUE: COMMENTS: SAT UNSAT P NOTE If necessary, place alternate system load on service, whenever possible. 8.2.2.2.3 If source ofinleakage is unknown, isolate CCW to the system loads one at a time to determine the source ofinleakage. See Appendix A, CCW SYSTEM LOADS. STANDARD: No action. Initial Conditions had the source isolated. CUE: COMMENTS: SAT UNSAT Page 4 of 9

        .        -             ~      .           .    .-    -               -  --      -   .-      . - . . -. . ~ .

I , ! CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET l JPM NUMBER: NRC 10 REVISION: 0 l NOTE When the source ofinleakage is isolated, the CCW Expansion Tank level should stabilize.

      '8.2.2.2.4    Lower CCW Expansion Tank level as follows:

a) Open ITE083, CCW Exp Tk Drain b) Throttle open ICC253, CCW Expansion Tank Auto Drain Valve to lower level to 105" to 117" STANDARD: l Simulates OPENING ITE083 by turning handwheel in the COUNTERCLOCKWISE direction. Simulates throttling OPEN ICC253 by turning handwheel in the COUNTERCLOCKWISE direction. 1 CUE: For each valve operated, cue that the valve handwheel is turning. For ITE083, cue the valve handwheel stops turning. COMMENTS: l SAT ___UNSAT i i l' Page 5 of 9 l r i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: .ERC 10 REVISION: 0

  • 8.2.2.2.5 When desired levelis reached a) Close ICC253, CCW Expansion Tank Auto Drain Valve b) Close ITE083, CCW Exp Tk Drain STANDARD:

After receiving cue that level is 115", simulates closing ICC253 and ITE083 by turning valve handwheels in the CLOCKWISE direction. CUE: As examinee monitors expansion tank level, cue that level is 115". For each valve operated, cue that the valve handwheel is turning then the valve handwheel has stopped. COMMENTS: SAT UNSAT 4

                                                                                                                ~

8.2.2.2.6' Check pump suction pressure, adjust per 8.1.1.1.b, if necusarv. j l STANDARD: Checks pump suction pressure and determines that no adjustment is necessary. CUE: l COMMENTS: Pump suction pressure should be approximately 14 psig. SAT UNSAT a I Page 6 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 8.2.2.2.7 If possible, leave the component that is the source ofinleakage off service and isolated, until it is repaired. STANDARD: i No action. CUE:

       ' The component will be left isolated until repaired.

COMMENTS:  ! SAT UNSAT r Page 7 of 9

                                  .CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET P

JPM NUMBER: NRC 10 REVISION: 0 TERMINATING CUES: F CCW Expansion Tank level has been returned to normal.  ; STOP TIME: l l j J 3 4 Page 8 of 9 i

CLINTON POWER STATION JOB PERFORMANCE MEASURE WORKSHEET JPM NUMBER: NRC 10 REVISION: 0 K/A REFERENCE NUMBERS + Importance Ratine J'

       ' K/A SYSTEM NUMBER                    K/A NUMBER             RO              SRO          ;

i' l i

                                                                                                   )

1 l 1 li l 1 l Page 9 of 9

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION QUESTION NO.: 1

The plant was at 100% power when main condenser vacuum began to decrease due to air in-leakage.

CCW Heat Exchanger temperature regulating valves are also malfunctioning causing CCW temperature to increase. . As CCW temperature continues to increase, what option will be available for LONG TERM RPV pressure control? ANSWER: Only SRVs on compressed gas will be available REFERENCE (S): CPS No. 4004.01

RESPONSE

SAT UNSAT Page 1 of 3

CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION

                . QUESTION NO.:                         2 The plant was at 100% power when'4.16 KV Bus IB locked out due to an overcurrent condition. The

{ loss of the 4.16 Bus 1B results in a trip of the reactor feed pumps with the resulting level transient.

                . Level decreases below level 2 before recovering. Based on this transients effect on Component Cooling                              !
Water (CC), what system / component loss will occure if NO operator action is taken?
                 . ANSWER:

Trip of the running Service Air Compressor. REFERENCE (S): . CPS No. 5041.01-1 A

RESPONSE

SAT UNSAT  ;

                                    - t e

i Page 2 of 3 y q -- . -

                                                                                --r-         c     ,-.c,. w- , ,e-+-                    - - -

l. CLINTON POWER STATION JOB PERFORMANCE MEASURE QUESTION DOCUMENTATION i I f Imoortance Ratine i L ' K/A SYSTEM NUMBER K/A NUMBER RO SRO l

          '400000                                                K3.01                                                3.3 400000                                                A2.01                                                3.4 l

L i ! 1 l JTA:

        -TASK NUMBER                                                                                                                               l l

ANSWER TIME: Min l l ORIGINATED / REVISED BY: / 1 REVIEWED BY: / APPROVED BY: / Supervisor- Requalification and ) Operations Training i

                                                                                                                                                 'i l

l i l'

l. .

Page 3 of 3 L.

 .   .-   -     - . . -    . - . ~ .       - . - - .      _ ~ , . - .               - . - - . - . . . . .    . - . . . . . . - -

CLINTON POWER STATION T JOB PERFORMANCE MEASURE OPERATOR COPY INITIATING CUE There is a high level in the CCW Expansion Tank. The source of the in-leakage has been isolated.  !' Return CCW Expansion Tank level to normal. e f i i l a i Page1ofI l

CPS No. 3203.01 8.2.2.2 High Level in CCW Expansion Tank 8.2.2.2.1 Verify 1CC090, CCW Expansion Tank Makeup Valve, is isolated and 1CC092, CCW Expansion Tank Makeup Valve Bypass, is SHUT. l 8.2.2.2.2 Notify Radiation Protection to check valve lineups on 1RIX-PR037, 1RIX-PR004, and 1RIX-PR005, if source of inleakage unknown. NOTE If necessary, place alternate system load on service, whenever possible. 8.2.2.2.3 If source of inleakage is unknown, isolate CCW to the system loads one at a time to determine tbc source of l inleakage. See Appendix A, CCW SYSTEM LOADS. ' NOTE When the source of inleakage'is isolated, the CCW Expansion Tank level should stabilize. 8.2.2.2.4 Lower CCW Expansion Tank level as follows: a) Open 1TE083, CCW Exp Tk Drain b) Throttle open 1CC253, CCW Expansion Tank Auto Drain Valve to lower level to 105" to 117". 8.2.2.2.5 When desired level is reached a) Close ICC253, CCW Expansion Tank Auto Drain Valve. b) Close iTE083, CCW Exp Tk Drain 8.2.2.2.6 Check pump suction pressure, adjust per 8.1.1.1.b, if necessary. 8.2.2.2.7 If possible, leave the component that is the source of inleakage off service and isolated, until it is repaired. 8.2.3 Containment Isolation / Recovery ) 8.2.3.1 For operation of the components inside the containment without CCW flow, refer to the following: l a) Reactor Recirculation Pumps, CPS No. 3302.01, REACTOR RECIRCULATION (RR), (8.3.4). b) Reactor Water Cleanup System, CPS No. 3303.01, REACTOR J WATER CLEANUP (RT), (8.3.3). Rev. No. 22 Page No. 40 of 55 ) l}}