Application for Amend to License NPF-4,changing Tech Spec Intervals for Conducting Containment Integrated Leak Rate Tests.Fee Paid
ML20154R840
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/20/1988
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20154R843 List:
References
88-233, NUDOCS 8810040372
Download: ML20154R840 (3)


Text

- _ _ _ _ _ _ _

. 10CFR50.90 YIMOINIA EtnermIC AND POWEN COMPANY NICHMOND.VIMOIMIA 90 968 September 20, 1988 United States Nuclear Regulatory Comission Serial No. 88 233 Attention: Document Control Desk N0/RCB:jmj Washington, D.C. 20555 Docket No. 50 338 License No. NPF 4 Gentlemen:

11RG1RIA ELECTRIC AND POWER COMPANY NORTH AMA. POWER. STATION UNIT 1 .

ER0f95LD_(H8NGE TO TECHNICAL SPECIFICATIONS

[QRIAlWENT INTEGRATED LEAKRATE 1EST SCHEDULE Parsuant to 10CFR50.90, the Virginia Electric and Power Company requests an amendment, in the form of a change to the Technical Specifications, to Operating License NPF-4 for North Anna Power Station Unit 1.

The proposed amendment would modify the requirement of Technical Specification 4.5.1.2a to conduct Type A test at 40 10 month intervals during each 10-year service period. The last Type A test was performed on this unit on September 11, 1984, causing the next testing date to become due on or before No.2mber 11, 1988. Technical Specificition 4.6.1.2a also requires the third Type A test of the service period to be conducted during the shutdown for the 10 year plant inservice inspection. The 10 year inservice inspection is currently scheduled to be conducted during the refueling outage comencing in February 1989. Virginia Electric and Power Company proposes to amend the Technical Specification to conduct the third Type A test of the first 10 year service period during the 1989 Refueling /10-year ISI Outage.

The proposed Technical Specification change is provided in Attachment 1. A Safety Evaluation is provided in Attachment 2.

This request has been reviewed and approved by the Station Nuclear Sa'ety and Operating Comittee and the Safety Evaluation and Control Staff. It has been determined that the change does not involve an unreviewed safety question as defined in 10CFR50.59 or a significant hazards consideration as defined in 10CFR50.92.

8310040372 880920

[

PDR ADOCK 05000330 i P PNu , fe f(gkp i

9

We have evaluated this request in accordance with the criteria of 10CFR170.12.

The application fee of $150.00 is enclosed.

Very tru y rs 11 m r W. R. Cartwr ght Vice President Nuclear Attachments

1. Proposed Technical Specification 4.6.1.2a
2. Safety Evaluation ec: U. S. Nuclear Regulatory Connission 101 Hartetta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219

)

P l

I COMMONWEALTH Of VIRGINIA COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Comonwealth aforesaid, today by W. R. Cartwright who is Vice President -

Nuclear, of Virginia Electric and Power Company. >!e is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of h,is knowledge and belief.

Acknowledged before me this M day of , [pf,f/dYu ,

19 88_.-

My Commission expires: LffbdMtv 85 , 19 96 -

.)

f f e Notary Public W. i i