Application for Amends to Licenses NPF-4 & NPF-7,changing Tech Specs for end-of-cycle Moderator Temp Coefficient (Mtc),Boron Value & Eliminating Mtc Measurements for End of Hot Full Power Reactivity.Safety Evaluation Encl.Fee Paid
ML20141G744
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/03/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML20141G747 List:
References
85-873, NUDOCS 8601100392
Download: ML20141G744 (4)


Text

e.

VINGINIA ELECTRIC AND PowEn COMPANY RIcunoxn, VIRGINIA 20261 W. L. SrawAmr Vacs Passionst Nuct.sas ocasarious January 3, 1986 r

.Mr. Harold R, Denton, Director Serial No.85-873 Office of Nuclear Reactor Regulation E&C/J0E/acm Attn: Mr. Lester S. Rubenstein, Director Docket Nos. 50-338 PWR Project Directorate #2 50-339 Division of PWR Licensing-A License Nos. NPF-4

~U.S. Nuclear Regulatory Commission NPF-7 Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station Units No.

I and 2, respectively.

We 'are requesting a change in the negative end-of-cycle (EOC) moderato {

temperature coefficient gC) limit from the current value of -4.0 x 10 delta k/k/*F to -4.4 x 10 delta k/k/*F and a change in the4 corresponding 300 ppm equiligrium boron concentration value from -3.1 x 10 delta k/k/*F to

-3.3 x 10 ~ delta k/k/*F for North Anna Units 1 and 2. In addition, because of the difficulty of performing MTC measurements near end of hot full power reactivity, it is proposed that MTC testing at EOC be elimin4ted provided a measurement at 560 ppm boron is less negative than -4.0 x 10 delta k/k/*F.

.The technical basis for the proposed changes is discussed in the attached safety evaluation. The proposed changes would update the E0C MTC limits to reflect current plant' operating conditions. Also, the changes conservatively envelop plant operating conditions for the proposed core uprate to 2893 Mwt (Serial - No.85-077, May 2, 1985). The proposed changes do not involve a change in the plant safety analysis as they are based on the current Updated Final Safety Analysis Report value of moderator coefficient, adjusted to hot full power operating conditions using the procedure described in the Technical Specifications Bases. The proposed change in the negative EOC MTC limit will provide .- greater flexibility during the reload core design process while maintaining the same degree of safety margin.

The proposed Technical Specification changes for North Anna 1 and 2 are provided in Attachments 1 and 2, respectively. A safety evaluation of the proposed changes is provided in Attachment 3.

~

8601100392 860103 PDR

" ADOCK 05000338 /

PDR f0 g e ci k6

  • 6 q

VBOINIA Ex.acresc Ann Powsu Courawy To Mr. Harold R. Denton

.This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee andLthe Safety Evaluation and Control' Staff. It has been determined that the proposed -changes do - not involve an unreviewed. safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92.

We have evaluated this request in accordance with the criteria in 10 CFR 170.12. A check in the amount of $150 is enclosed as an application fee.

"Very truly yours,

}

a W. - L .. Stewart Attachments

1. Proposed Technical-Specifications Changes - Unit 1 2.- Proposed Technical Specifications Changes - Unit 2
3. Safety Evaluation cc: Dr. J. Nelson Grace

. Regional Adminis'trator NRC Region II Mr. Morris W. Branch

NRC Resident
Inspector

-North Anna Power Station Mr. Charles Price Department of Health

'109 Governor Street Richmond, Virginia 23219 i

~ <

COMMONWEALTH OF VIRGINIA ).

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge.and belief.

Acknowledged before me this d day of ww , 19 k .

My Commission expires: i b e-u m \o ,19 $% .

\

\

be % \ \9AL.

Notafy Public w

M 8 t

f (SEAL)

S/001

53

. .o- * .

.i: {

143/134 m

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATIONS CHANGES - UNIT 1 w w - , . , , - - - -,e< , - - - --

,- , , -, - - , - . , -.