Forwards Documents Re Representative Markey 850920 Request. Region III & IE Supporting Documents Will Be Forwarded Upon Receipt.Documents Also Responsive to Udall 850919 Request W/Exception of Rept of Maint Insp Available in Late Oct
ML20133C833
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1985
From: Rehm T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Fay E
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
Shared Package
ML20133C775 List:
References
NUDOCS 8510070518
Download: ML20133C833 (8)


Text

. .

l l

l p.= *s s

[' 'j UNITED STATES Qy,/

s,,7, f NUCLEAR REGULATORY COMMISSION W ASHINGTON, D.C. 20555 September 26, 1985 MEMORANDUM FOR: Ed Fay, OCA FROM: T. A. Rehm, A0/ED0

SUBJECT:

RESPONSE TO MARKEY LETTER OF SEPTEMBER 20, 1985 Attached are documents related to request from Representative Markey. They are categorized according to the numbered paragraph in the incoming letter.

The documents are complete for NRR. Region III and IE may have .further supporting documents which I will provide when received.

The documents also are responsive to Udells' request of September 19, except for the request for a report on a Maintenance Inspection which will not be available until late October, j ,,s'

/ T. A. em Assistant for Operations, EDO f

Enclosures:

  • See attached list Distribution ED0 R/F WDircks JRoe TRehm VStello JTaylor DEisenhut JFouchard EDO 1007 851CHT70518 85(FM25 PDR CCPW43 NRCC:

CORRESPOfGENCE PDR

I

]

\

List of documents provided in response to Markey letter of 9/20/85 Package #1 Toledo Edison Company - Davis Besse Nuclear Power Station Course of

~

Action Report dated 9/9/85 Volumes 1 and 2 August 5 Memo fm Dircks to Denton, Taylor, Minogue, Heltemes and Keppler re: STAFF ACTIONS RESULTING FROM THE INVESTIGATION OF THE JUNE 9 DAVIS-BESSE EVENT (NUREG-1154)

August 5 Generic Letter re: TRANSMITTAL OF NUREG-1154 REGARDING THE DAVIS-BESSE LOSS OF MAIN AND AUXILIARY FEEDWATER EVENT (Generic Letter No. 85-13)

August 5 Memo fm Crutchfield to Hugh Thompson re POTENTIAL IMMEDIATE GENERIC ACTIONS AS A RESULT OF THE DAVIS-BESSE EVENT OF JUNE 9, 1985 August 8 Meco fm William Russell to Darrell Eisenhut re MAINTENANCE SURVEY AT DAVIS-BESSE August 13 Memo fm Frank Rowsome to Gus Lainas and Dennis Crutchfield re DAVIS-BESSE RESTART CONSIDERATIONS August 14 Letter to Toledo Edison Company fm James Keppler August 14 Letter to Toledo Edison Company fm Harold Denton August 16 Memo to John Stolz fm Albert De Agazio re FORTHCOMING SITE VISIT TO DAVIS-BESSE August 19 Memo to Themis Speis fm Hugh Thompson re SHORT TERM GENERIC ACTIONS AS A RESULT OF THE DAVIS-BESSE EVENT OF JUNE 9, 1985 August 19 Memo to Hugh Thompson fm Themis Speis re DAVIS-BESSE EVENT -

POTENTIAL THERMAL STRESS CONCERN

  • August 19 Memo to William Dircks fm H. Denton re: NRR INITIATIVES RESULTING FROM THE DAVIS-BESSE EVENT August 21 Memo to R. Bernero, J. Knight, W. Russell, T. Speis fm Hugh Thompson re NRR DRAFT ACTION PLAN RESULTING FROM THE DAVIS-BESSE JUNE 9,1985 EVENT August 21 Memo to John Stolz fm Albert W. DeAgazio re FORTHCOMING MEETING WITH TOLEDO EDISON COMPANY Transcript of Meeting with Toledo Edison Company September 4 Meeting with NRC Staff August 27 Memo to C. J. Heltemes and H. R. Denton fm John Davis re STAFF ACTIONS RESULTING FROMTHE INVESTIGATION OF THE JUNE 9 DAVIS-BESSE EVENT (NUREG-1154)

August 29 Memo to R. Bernero, J. Knight, W. Russell, T. Speis fm Hugh Thompson re NRR DRAFT ACTION PLAN RESULTING FROM THE DAVIS-BESSE JUNE 9, 1985 EVENT

i August 29 Memo to F. Cherny fm F. Rosa re TOLEDO EDISON / DAVIS BESSE JUNE 9 1985 EVENT: TAC #59422 - ICSB INPUT August 29 Memo to 0. Parr fm F. Rosa re TOLED0 EDISON / DAVIS BESSE: ACTION PLAN #8 (REV 4) FOR MAINFEED PUMP CONTROL SYSTEM: FINDINGS REPORT (REY. 0)

TAC #59421 - ICSB INPUT August 29 Memo to Gus Lainas fm L. Rubenstein re EVALUATION OF DAVIS-BESSE AFPT OVERSPEED TRIP THROTTLE VALVE CORRECTIVE ACTIONS AND GENERIC IMPLICATIONS REPORT - AUXILIARY SYSTEMS BRANCH - TAC NUMBER 59418 August 30 Memo to R. Bernero, J. Knight, W. Russell, T. Speis fm H. Thompson re NRR REVIEW PLAN AND ASSIGNMENTS August 30 Memo to G. Lainas fm R. Wayne Houston re DAVIS BESSE/ TOLEDO EDIS0N -

ACTION PLAN #18 (REV. 1) STARTUP FEEDWATER VALVE SP-7A PROBLEM ANALYSIS:

CORRECTIVE ACTIONS AND GENERIC IMPLICATIONS REPORT (REV. 0)

September 4 Memo to W. Dircks fm C. J. Heltemes re STAFF ACTIONS RESULTING FROM THE INVESTIGATION OF THE JUNE 9, 1985 DAVIS BESSE EVENT

September 4,1985 Memo to T. Speis, R. Bernero, J. Knight W. Russell fm Hugh Thompson re DRAFT LIST OF LONGER-TERf1 GENERIC ACTIONS AS A RESULT OF THE DAVIS-BESSE EVENT OF JUNE 9, 1985 -

i September 6 Memo to R. Bernero, J. Knight, W. Russell, T. Speis fm H. Thompson re NRR DRAFT ACTION PLAN RESULTING FROM THE DAVIS-BESSE JUNE 9, 1985 EVENT -

REVISION 2 September 9 Memo to Bernero, Knight, Russell, Speis fm Thompson re RETROSPECTIVE LOOK AT NRR PROGRAMS AS A RESULT OF THE DAVIS-BESSE EVENT September 9 Memo to Gus Lainas fm L. Rubenstein re EVALUTION OF DAVIS BESSE MAIN FEED PUMP TURBINE AND CONTROL SYSTEM FAILURE - AUXILIARY SYSTEMS BRANCH - TAC NUMBER 59421

September 11 Memo to H. Thompson fm G. Lainas and J. Stolz re RECOMMENDATION

.g FOR LONGER TERM GENERIC ACTION AS A RESULT OF DAVIS-BESSE EVENT OF JUNE 9, 1985 September 11 Memo to H. Thompson, T. Speis, R. Bernero, J. Knight and W. Russell fm H. Denton re LESSONS LEARNED FROM TIE DAVIS BESSE INVESTIGATION EFFORT September 16 Memo to T. Speis fm H. Thompson re CONCERNS RELATED TO THE DAVIS BESSE INCIDENT ON JUNE 9, 1985 Package #2 I August 5 Memo to Chainnan Palladino fm Dircks re REVIEW OF OPERATING NUCLEAR POWER PLANTS ,

August 16 Memo to Connission fm Commissioner Asselstine re FURTHER NRC ACTIONS i ON DAVIS BESSE August 19 Memo to W. Dircks fm H. Denton re NRR INITIATIVES RESULTING FROM THE i DAVIS BESSE EVENT j

. o ,

August 21 Memo to Bernero, Knight, Russell, Speis fm Thompson re: NRR DRAFT ACTION PLAN RESULTING FROM THE DAVIS BESSE JUNE 9, 1985 EVENT August 29 Memo to Bernero, Knight, Russell, Speis fm Thompson re NRR DRAFT ACTION PLAN RESULTING FROM THE DAVIS BESSE JUNE 9,1985 EVENT August 29 Note to D. Eisenhut, R. Bernero, T. Speis fm G. Holahan August 29 Memo to W. Dircks fm J. Keppler re REGION III INITIATI'YES RESULTING FROM THE DAVIS-BESSE EVENT August 30 Memo to S. Chilk fm Zech re COMJA-85 FURTHER NRC ACTIONS ON DAVIS BESSE September 3 Memo to W. Dircks fm Taylor re STAFF ACTIONS RESULTING FROM THE INVESTIGATION OF THE JUNE 9 DAVIS BESSE EVENT (NUREG-1154) l September 4 Memo to W. Dircks fm C. Heltemes re STAFF ACTIONS RESULTING FROM THE INVESTIGATION OF THE JUNE 9, 1985 DAVIS-BESSE EVENT September 5 Memo to Commission fm W. Dircks re FURTHER MRC ACTIONS ON DAVIS BESSE Package #3 August 4 Memo to Chairman Palladino fm W. Dircks re REVIEW 0F OPERATING NUCLEAR POWER PLANTS July 19 Memo to H. Thompson fm E. Butcher re OPERATING REACTORS PROJECT MANAGER SURVEY RESPONSE FOR FORT ST. VRAIN July 19 Memo to H. Thompson fm G. Lainas RE: BROWNS FERRY SAFETY ISSUES July 23 Memo to H. Thompson fm G. Lainas re: RANCHO SECO - OPERATIONAL PROBLEMS July 23 Note to H. Thompson fm John Zwolinski re LICENSING ISSUES FOR SAN ONOFRE 1 AND PALISADES

~, August 27 Memo to W. Dircks fm Palladino re FOLLOW-UP ACTIONS ON OPERATING PLANTS OTHER THAN DAVIS BESSE June 26 Memo to Division of Licensing Project Managers fm H. Thompson re OPERATING REACTORS PROJECT MANAGER SURVEY ORPM SURVEY sheets September 17 Memo to Chairman Palladino fm W. Dircks re FOLLOW-UP ACTIONS ON OPERATING PLANTS OTHER THAN DAVIS BESSE

Ref. ED0 1007 ACTION: Denton, NRR SUSPENSE: 9/24/85 Please respond c.o.b. Tuesday, Sept. 24 with relevant material to Rehm. If for any reason there is delay in getting the documents, make sure a list is provided by c.o.b. Tuesday. All input should be marked to indicate which paragraph of this letter it refers to, and note if it should be placed in the PDR.

This supersedes items 1 & 2 of ED0 1007 (9/19/85 DelMedico note for Rehm).

Cys: Dircks Roe Rehm Stello Keppler Taylor GCunningham 1

I

._ _ _ - . _ _ _ _ _ _ _ - _ . - . - _ _ _ . - - _ .. _ _ - _ _ _ _ = _ _ . . - -

n.a

, _--- =[yg== a EnP_ EE"O U.S. HOUSE OF REPRESENTATIVES

]Qg "f';3','C"= = suscoMMITTEE NE RGY CONSERVATION 2ll"."C""'C.' L ,- (, , ;M tm '

-- COMMITTtt ON SPtERGY AND COMMERCE

  • p WA5HINGTON, DC 20815
  • september 20, 1985 The Honorable Nunzio J. Palladino l Chairr.an U.S. Nuclear Regulatory Commission 1717 E Street, N.W.

Washington, D.C. 20555 i

i

Dear Mr. Chairman:

De This is to request certain documents in preparation for the i

subcommittee's upcoming hearing on the Davis-Besse incident. ,

Please' provide the subcommittee with the following:

I documents generated in _ response to William J. Dircks' August 5,J1) all M 1985 memorandum to the NRC staYf regardin response to the Davis-sesse incidents (2)ga staf f actions in copy of Mr. Dircks'

, september 5,1985 memorandum to the Commission regarding staff mentioned(3)therein; leading to, or generated in respense to hisac memorandum; Dircks' August 5,all documents leading to or resulting from Mr. MI a review ~of operating reactors including all documents generate l

in response Division to sugn L. Project of Licensing Thompson's Managers. June 26, 1985 memorandum to the Subcommittee by 12:00 noon on WednesdayPlease provide the Commission'a prompe assistance is apprec,iated. September 24, 1985. The Sincerely, 4

Edward . Mark y Chairman l EJM a rr.

I i

i l

l

. . _ _ - - - ~ . - - .

h

/[' ,

  • o

'n e

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHING TON. D. C. 20555 i

v l

September 19, 1985 i

NOTE FOR: Tom Rehm FROM: J. DelMedico f I

SUBJECT:

TOPICS FOR BRIEFING ON DAVIS-BESSE REQUESTED BY j RICHARD UDELL AND RELATED REQUESTS I

'i In preparation for the Markey Subcommittee hearing on Davis-Besse, Mr.

Udell of the Subcommittee staff has made the following requests:

1. An August 5,1985 memorandum from Mr. Dircks to Chairman Palladino i summarized the responses of project managers concerning operating

.1 nuclear power plants where required corrective action has been l outstanding for an extended period of time. Mr. Udell requests a copy l of the actual response submitted by each project manager, i 1

2. An August 5 memorandum from Mr. Dircks to Office Directors asked, in light of the Davis-Besse incident, how NRC programs could be made more effective. Mr. Udell requests copies of the responses to that memorandum.
3. There is a maintenance inspection at Davis-Besse this week. When it is available, Mr. Udell requests a copy of the report or document generated as a result of that inspection.

! 4. As I mentioned this afternoon in our telephone conversation, Mr. Udell i requests a briefing on Davis-Besse and proposes Tuesday, September 24 i at 2 P.M. as the date and time. The areas to be covered in this -

briefing are:

- NRC's current views of the utility analysis and the Los Alamos

, study concerning feed and bleed at Davis-Besse.

i - An expansion of the NRC response to Question 12 in our letter to .

Mr. Markey dated July 12, 1985. This expansion would extend the response concerning aux feed reliability to all operating power reactors.

l - Information on how the core melt frequency calculations in the

! January 16, 1984 memorandum from Thadani to Parr came about.

1 i

, - - . . _ _ - _ _ _ _ _ . _ _ ___._ __.__ _,______ _ m , _

t  !

i - In the September 18th briefing before the Commission, the Staff ,

mentioned efforts to increase aux feed reliability at some

. plants. Mr. Udell would like to discuss the specific plants and, +

if there is a CRGR package, he would like to obtain a copy of it.

- Generic implications of the Davis-Besse incident.

- INP0 activities at Davis-Besse, including staff access to INP0 documents on the plant and whether INP0 anticipated the problems at Davis-Besse.

- The grandfathering process as it relates to GDC and SRP requirements, including what plants have to comply with which requirements and how this is determined.

! - The number of failures at Davis-Resse, their causes, their

! estimated probability and the combined probability of occurrence.

This relates to our response to Question 2 in the NRC response to Mr. Markey dated July 17, 1985.

- Prerequisites to restart, including IE issues such as pending enforcement action as a result of the incident. ,

.)

1 i

I 4

STAFFNOTE9/19 REHM