ML20141F036

From kanterella
Revision as of 19:51, 26 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 860113 Meeting W/Util in Bethesda,Md to Discuss Status of Plant & Current & New Licensing Actions Required to Support Util Projected Fuel Load Date.Agenda Encl
ML20141F036
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/30/1985
From: Siegel B
Office of Nuclear Reactor Regulation
To: Butler W
Office of Nuclear Reactor Regulation
References
NUDOCS 8601080505
Download: ML20141F036 (5)


Text

. .

8 f,, UNITED STATES NUCLEAR REGULATORY COMMISSION

, G p WASHINGTON, D. C. 20555

\*****/ DEC 3 01985 Docket No. 50-461 MEMORANDUM FOR: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing FROM: B. Siegel, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing

SUBJECT:

FORTHCOMING MEETING WITH ILLIN0IS POWER COMPANY RELATED TO BRIEFING THE NEW BWR ORGANIZATION ON THE LICENSING STATUS OF CLINTON*

DATE & TIME: January 13, 1986 1:00 p.m. to 3:00 p.m.

LOCATION: Phillips Building Room P-110

'i Bethesda, Maryland PURPOSE: To brief the new BWR organization on the status of Clinton and in particular with regard to current and new licensing actions required to support Illinois Power Company's projected fuel load date (see attached agenaa).

PARTICIPANTS *: NRC IP B. Siegel R. LaGrange T~ Spangenberg G. Lainas W. Hodges. T. Riley D. Vassallo L. Phillips W. Butler G. Hulman B. Liaw J. Kudrick W. Hazelton K. Campe M. Srinivasan f[

B. Siegel, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing cc: See next page

  • Meetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy",

43 Federal Register 28058,6/28/78. ,

8601080505 851230 PDR ADOCK0500g1 A

DEC 3 01985 Docket No. 50-461 MEMORANDUM FOR: Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing FROM: B. Siegel, Project Manager BWR Project Directorate No. 4 Division of EWR Licensing

SUBJECT:

FORTHCOMING MEETING WITH ILLIN0IS POWER COMPANY RELATED TO BRIEFING THE NEW BWR ORGANIZATION ON THE LICENSING STATUS JF CLINTON*

LATE & TIME: January 13, 1986 1:00 p.m. to 3:00 p.m.

LOCATION: Phillips Building Room P-110 Bethesda, Maryland PURPOSE: To brief the new BWR crganization on the status of Clinton and in particular with regard to current and new licensing actions required to support Illinois Power Ccrpany's projected fuel load date (see attached agenda).

PARTICIPANTS *: NRC IP B. Siegel R. LaGrange E Spangenberg G. Lainas W. Hodges T. Riley D. Vassallo L. Phillips W. Butler G. Hulman B. Liaw J. Kudrick W. Hazelton K. Campe M. Srinivasan B. Siegel, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing cc: See next page

  • f teetings between NRC technical staff and applicants for licenses are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of f.PC Staff Policy",

43 Federal Register 22058,6/28/78.

PDh BSiegpl':dh PD#4 WButler 12/ /?i/85 12/g/85 l I

l

'i

, CLINTON POWER STATION IP/NRC LICENSING MEETING AGENDA January 13, 1986 (1:00 p.m.)

i INTRODUCTION-CPS READINESS TO LOAD FUEL (READINESS LETTER)

ISSUES STATUS

- SER/FSAR Issues (" CLIP" Report)

- I&E Inspection Items

- 10CFR50 55(e)s and Part 21s

- I&E Bulletins, Circulars, Notices, and Generic Letters

- Major tasks remaining FSAR CERTIFICATION SITE WIDE STATUSING SYSTEM (CONSOLIDATED PUNCHLIST OF ALL " THINGS" REMAINING)

APPROACH TO SYSTEMS REQUIRED FOR PUEL LOAD CONSTRUCTION & TESTING STATUS

- Critical Path Analysis

- Deferral Items and Justification for Each POWER ASCENSION PROGRAM ACCELERATION PERSONNEL AND STAFFING STATUS 10CPR50 EXEMPTION REQUESTS ALLEGATIONS CONCLUSIONS /

SUMMARY

l

l

. Mr. Frank A. Spangenberg Clinton Pcwer Station Illinois Power Company Unit 1 cc:

Mr. Allen Samelson, Esquire Jean Foy, Esquire Assistant Attorney General 511 W. Nevada Environmental Control Division Urbana, Illinois 61801 Southern Region 500 South Second Street Richard B. Hubbard Springfield, Illinois 62706 Vice President Technical Associates Mr. D. P. Hall 1723 Hamilton Ave. - Suite K Vice President San Jose, CA 95125 Clinton Power Station P. O. Box 678 Clinton, Illinois, 61727 Mr. H. R. Victor Manager-Nuclear Station Engineering Dpt.

Clinton Power Station P. O. Box 678 Clinton, Illinois 61727 Sheldon Zabel, Esquire Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago, Illinois 60606 Resident Inspector U. S. Nuclear Regulatory Commission RR 3, Box 229 A Clinton, Illinois 61727 Mr. R. C. Heider Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 Mr. L. Larson Project Manager General Electric Company 175 Curtner Avenue, h/C 395 Sen Jese, California 95125 Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

O e I.

2

  • Meeting Notices Internal- NRC Participants Docket Fili NRC PCR B Sie9el Local PCR G. Lainas PRC Systen D. Vassallo NSIC W. Butler ORAS B. Liaw PD*4 Readir.g W. Hazelton HDenton/DEisenhut RBernero/RHouston WButler EAdensam JZwolinski bcc: Applicant & Service List Glainas DMuller ACRS-10 OELD, Attorney n r,naaara JPartlow BGrimes

_EJordan N01 son OPA Receptionist (Only if meeting is held in Bethesda)

Project Manager n e,ono, E. Hylton '

Region III

.