MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] |
Text
% UNITED STATES
- b NUCt. EAR REGULATORY COMMisslON
..l[ ,
WASHINGTON, D. C. 20555 Aj o% ....
DOC KET 10, : 50-70 DATE: December 14, 1977 LICENSEE: GENERAL ELECTRIC COMPANY (GE)
FACILITY: GENERAL ELECTRIC TEST REACTOR (GETR)
SUFt4ARY OF MEETING HELD ON DECEMBER 2,1977, TO DISCUSS THE SEISMIC REEVALUATION OF THE GETR On December 2,1977, representatives of GE and its consultants, Engineering Decision Analysis Company (EDAC) and Earth Sciences Associates (ESA) met with the NRC staff to discuss geological and seismological matters relating to the seismic reevaluation of the GETR.
A list of attendees is attached. Important highlights of the neeting are summarized below.
As a matter of background, during the staff's review of GE's application for license renewal for the GETR a new interpretation evolved with respect to the "Verona fault". Postulation of this fault in closer proximity to the GETR than previously mapped and presumption of its potential for surface faulting resulted in the October 24, 1977 NRC Order to Show Cause which directed suspension of operation of the GETR. GE's November 11, 1977 response to the NRC Order included a summary of additional geological investigations made at the GETR site, an explanation that the geological features of concern are the result of landsliding and GE's contention that the Verona fault does not exist. As a result of its review of the geological information submitted by GE in support of its license renewal application and in response to the October 24, 1977 NRC Order, the staff found that this information is not sufficient to resolve the issue of surface faulting. The purpose of this meeting was to inform GE of our concerns and to identify possible alternate approaches to provide additional information needed to complete the review.
Comments made during the meeting are summarized below:
With regard to the "Verona fault", the potential for surface faulting, and GE's contention that the geological features of concern can be explained by landsli ding, w'e indicated that at the present time we do not have sufficient data to rule out faulting as the primary genetic cause of the geological features observed in the site area.
Attachment A " Comments for the GETR Meeting 12/02/77" which was provided as a handout during the meeting outlines the points made by the staff on the geological matters of concern.
7812196oc>y >
2 We informed GE that we are taking steps to formally request U.S. {
Geological Survey (U.S.G.S.) consultation and advice in our review !
of the potential for surface faulting in the GETR site area. This l would be in addition to the limited U.S.G.S. involvement to date.
l GE presented a series of slides in further support of its contention l
that the geological features of concern are the result of landsliding.
' The staff noted thatmuch of the information presented by GE at the meeting was new and requested that all geological information including the new information be consolidated in one document and submitted on the GETR docket to facilitate the review process.
GE expressed its concern to be able to get the GETR back into operation as soon as possible and to be able to operate the GETR while. the overall license renewal review is proceeding. GE asked how much longer it would take to resolve the staff's geological l concerns related to the Show Cause Order. We indicated that the l results of needed additional geological investigations are diffi-cult to predict and that we would also have to consider expected input from the U.S.G.S. to resolve the concerns over surface faulting. Therefore, at this time, it is not possible for us to estimate the additional time needed, although it could be substantial.
- We told GE that in lieu of proceeding with the additional work to resolve the geological concerns, on the basis of thoro beinq no surface faulting, an alternate acceptable approach would be
' to assume surface faulting and to provide an analysis that would support a conclusion that the GETR can be operated safely and with-out unacceptable concequences to the health and safety of the public, even assuming an unlikely event of an earthquake with peak ground acceleration coincident with surface faulting. GE would have to justify the manner in which it proposes to account in the analysis for the combined effects of the assumed seismological events. We I also mentioned that in the analysis, GE would also need to address potential sliding and tilting of structures; magnitude of concrete cracking; slashing of water out of the pool (seismic slosh) , and missile potential from the polor crane.
fI .
As indicated during the meeting, the staff will continue to prepare questions rainking to our geological concerns that will be formally transmitted to GE. to obtain responses needed to continue our review of the information submitted to date in support of GE's request to lift the suspansion imposed by our October 24, 1977 Show Cause Order.
-f ' .
r',
\ /.:4' mpv Alfred "irger Project Manager-Operating Reactors Branch #1 Division of Operating Reactors
Enclosures:
- 1. Attendence List
- 2. NRR " Comments for GETR Meeting 12/02/77" cc w/ encl:
See rext page l
l l
2 l
Q,
LIST OF ATTENDEES DECEMBER 2,1977 MEETING WITH GE CONCERNING GETR NRC A. Burger D.'Swanson G. Bagchi W. P. Gammill R. E.-Jackson J. Kelleher R. Turnbull
' H. E. Lefevre J. T. Greeves H. J. Wong A. Schwencer R.J. Stuart I
G_E D. Hoggatt R. W. Darmitzel .
D. L. Gilliland l L. S. Gifford (Bethesda, Md.)
EDAC J. Reed R. Sharpe ESA R. H. Wright R. C. Harding PLEASANTON VALLEY TIMES Martin Gottlieb ;