(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Joint Status ReportML20167A335 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
06/15/2020 |
---|
From: |
Dorfler J, Healey M, Doris Lewis, Lovett A, Raimo S, Schofield S Balch & Bingham, LLP, Entergy Nuclear Operations, Entergy Services, Holtec Decommissioning International, Holtec, Holtec Pilgrim, Pillsbury, Winthrop, Shaw, Pittman, LLP, State of MA, Office of the Attorney General |
---|
To: |
NRC/OCM |
---|
SECY RAS |
References |
---|
50-293 LT, 72-1044 LT, License Transfer, RAS 55710 |
Download: ML20167A335 (3) |
|
|
---|
Category:Legal-Correspondence/Miscellaneous
MONTHYEARML20171A6762020-06-19019 June 2020 Commonwealth of Massachusetts' Notice of Withdrawal of Its Petition for Leave to Intervene and Hearing Request ML20167A3352020-06-15015 June 2020 Joint Status Report ML20063M9722020-02-26026 February 2020 2-26-20 Docketing Statement (DC Cir.)(Case No. 20-1019) ML19296A0192019-10-23023 October 2019 Notice of Appearance for Jeremy L. Wachutka ML19296A0492019-10-23023 October 2019 Notice of Withdrawal for Jennifer Scro ML19239A4102019-08-27027 August 2019 Notification of Issuance of Conforming Amendment ML19235A2962019-08-23023 August 2019 NRC Staff Notification Re License Transfer Documents ML19235A3022019-08-23023 August 2019 Attachment 6 - Exemption ML19235A3012019-08-23023 August 2019 Attachment 5 - Exemption Letter ML19235A3002019-08-23023 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19235A2992019-08-23023 August 2019 Attachment 3 - Draft Conforming Amendment ML19235A2982019-08-23023 August 2019 Attachment 2 - License Transfer Order ML19235A2972019-08-23023 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3652019-08-22022 August 2019 Attachment 5 - Exemption Cover Letter ML19234A3632019-08-22022 August 2019 Attachment 3 - Draft Conforming Amendment ML19234A3622019-08-22022 August 2019 Attachment 2 - License Transfer Order ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3602019-08-22022 August 2019 NRC Staff Notification Re Issuance of License Transfer ML19234A3642019-08-22022 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19234A3662019-08-22022 August 2019 Attachment 6 - Exemption ML19225D0062019-08-13013 August 2019 NRC Staff Notification Re Nsla ML19225C2422019-08-13013 August 2019 Notice of Appearance for Jennifer Scro ML19120A5002019-04-30030 April 2019 Notice of Appearance for Meghan C. Hammond ML19080A2042019-03-21021 March 2019 Notice of Appearance of Peter D. Lejeune, Alan D. Lovett, and Andrew R. Ryan ML19074A2862019-03-15015 March 2019 Notice of Appearance for Joseph Dorfler ML19074A2892019-03-15015 March 2019 Notice of Appearance for Seth Schofield ML19072A3122019-03-0404 March 2019 Comments from Guy Page on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3132019-03-0404 March 2019 Comments from Brad Ferland on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3142019-03-0404 March 2019 Comments from Commonwealth of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1772019-03-0404 March 2019 Comments from Catherine Berkey on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3312019-03-0404 March 2019 Comments from the Cape Downwinders and Boston Downwinders on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1732019-03-0404 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3322019-03-0404 March 2019 Comment from Pilgrim Watch on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3452019-03-0404 March 2019 Comment from Pine Dubois on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1652019-03-0404 March 2019 Comments Received from Concerned Citizens of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1682019-03-0303 March 2019 Comments from Joan Holt on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3302019-03-0303 March 2019 Comment from James B. Lampert on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1642019-03-0303 March 2019 Comments from Diana Maher on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1692019-03-0303 March 2019 Comments from Lesley Phillips on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1702019-03-0303 March 2019 Comments from Lillia Frantin on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1712019-03-0303 March 2019 Comments from Nicola Blake on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1722019-03-0303 March 2019 Comments from Alex Bally on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1742019-03-0303 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1752019-03-0303 March 2019 Comments from Betsy Smith on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1672019-03-0202 March 2019 Comments from Irene Paine on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1662019-03-0202 March 2019 Comments from Gertrude Carter on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1622019-03-0202 March 2019 Comments from David Agnew on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2582019-03-0202 March 2019 Comment from James Sinclair on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2572019-03-0202 March 2019 Comments from William Stewart on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3102019-03-0101 March 2019 Comments from David Noyes on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) 2020-06-19
[Table view] |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC., )
ENTERGY NUCLEAR GENERATION )
COMPANY, AND HOLTEC ) Docket Nos. 50-293-LT & 72-1044-LT DECOMMISSIONING INTERNATIONAL, )
LLC )
)
(Pilgrim Nuclear Power Station) )
)
)
JOINT STATUS REPORT Pursuant to the Nuclear Regulatory Commissions June 4, 2020 Order, Holtec International, Holtec Decommissioning International, LLC, Entergy Nuclear Generation Company (now known as Holtec Pilgrim, LLC) and Entergy Nuclear Operations, Inc.
(Applicants) and the Petitioner, the Commonwealth of Massachusetts (Commonwealth or Massachusetts), provide the following status report on the status of their efforts to finalize a settlement agreement. The Holtec Applicants and the Commonwealth have made additional progress toward finalizing a settlement agreement since June 4, 2020, and are pleased to report that, subject to final approvals, they have reached an agreement in principle on the terms of a settlement agreement, which, if approved and executed, will result in the Commonwealth withdrawing its pending Petition.
//
//
//
//
Respectfully submitted this 15th day of June, 2020, HOLTEC INTERNATIONAL, COMMONWEALTH OF MASSACHUSETTS HOTEC DECOMMISSIONING INTERNATIONAL, LLC, By its attorneys, HOLTEC PILGRIM, LLC MAURA HEALEY Executed in accord with 10 C.F.R. 2.304(d) ATTORNEY GENERAL Alan D. Lovett Balch & Bingham LLP Signed (electronically) by 1710 Sixth Avenue North SETH SCHOFIELD Birmingham, AL 35203-2015 Senior Appellate Counsel 205-226-8769 JOSEPH DORFLER alovett@balch.com Assistant Attorney General Energy and Environment Bureau One Ashburton Place, 18th Floor Boston, Massachusetts 02108 617-963-2000 ENTERGY NUCLEAR OPERATIONS, seth.schofield@mass.gov INC. joseph.dorfler@mass.gov Executed in accord with 10 C.F.R. 2.304(d)
Susan H. Raimo Entergy Services, LLC 101 Constitution Avenue, NW Suite 200 East Washington, DC 20001 202-530-7330 sraimo@entergy.com David R. Lewis Pillsbury Winthrop Shaw Pittman, LLP Washington, DC 20036-3006 202-663-8474 David.lewis@pillsburylaw.com UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC., )
ENTERGY NUCLEAR GENERATION )
COMPANY, AND HOLTEC ) Docket Nos. 50-293-LT & 72-1044-LT DECOMMISSIONING INTERNATIONAL, )
LLC )
)
(Pilgrim Nuclear Power Station) )
)
)
CERTIFICATION OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that copies of the Joint Status Report have been served upon the Electronic Information Exchange, the NRCs e-filing system, in the above-captioned proceeding this 15th day of June 2020.
Signed (electronically) by Seth Schofield Senior Appellate Counsel Energy and Environment Bureau One Ashburton Place, 18th Floor Boston, Massachusetts 02108 617-963-2436 seth.schofield@mass.gov Dated: June 15, 2020