MONTHYEARML20236C5301989-03-14014 March 1989 Annual Rept 1988 ML20210P5471987-02-0505 February 1987 Annual Rept of Activities & Events for 1986 ML20214E2351986-02-28028 February 1986 Annual Rept of Activities & Events for 1985 ML20137V5401986-02-0606 February 1986 Annual Operating Rept for 1985 ML20080E6311983-12-31031 December 1983 Summarizes Experiments Performed During 1983,per 10CFR50.59 ML20071E5191983-03-0808 March 1983 Annual Operating Rept,1982 ML19290E8601980-03-0505 March 1980 Annual Rept for 1979. ML19261B9901979-03-0909 March 1979 Annual Operating Rept for 1978 1989-03-14
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML19325F1871989-11-30030 November 1989 Termination Radiation Survey Summary & Final Rept. ML20246G4091989-07-11011 July 1989 Safety Evaluation Supporting Dismantling & Disposition of Component Parts,Per 890120 Application ML20244D2581989-06-0707 June 1989 Safety Evaluation Supporting Amend 7 to License R-114 ML20236C5301989-03-14014 March 1989 Annual Rept 1988 ML20147B7421988-02-25025 February 1988 Safety Evaluation Supporting Amend 6 to License R-114 ML20215B8211987-06-0909 June 1987 Ro:On 870602,noted That Shim & Regulating Rod Positions for 10 Watt Check Considerably Higher than Expected.Caused by Aluminum Top End Fitting of Control Rod Poison Section Fracturing.Stainless Steel Insert Designed ML20210P5471987-02-0505 February 1987 Annual Rept of Activities & Events for 1986 ML20214E2351986-02-28028 February 1986 Annual Rept of Activities & Events for 1985 ML20137V5401986-02-0606 February 1986 Annual Operating Rept for 1985 ML20094E2951984-07-13013 July 1984 Rev 4 to Requalification Program for Licensed Operators ML20093A1271984-06-30030 June 1984 Rev 1 to SAR for Triga Reactor ML20091M8871984-05-0909 May 1984 Rev 3 to Requalification Program for Licensed Operators ML20080E6311983-12-31031 December 1983 Summarizes Experiments Performed During 1983,per 10CFR50.59 ML20071E5191983-03-0808 March 1983 Annual Operating Rept,1982 ML19347F8291981-05-14014 May 1981 Annual Financial Rept 1980 ML19290E8601980-03-0505 March 1980 Annual Rept for 1979. ML19261B9901979-03-0909 March 1979 Annual Operating Rept for 1978 ML20084F1111972-01-27027 January 1972 Ao:On 720118,during Routine Monthly Surveillance Test, Pressurizer Pressure Bistable Failed to Deenergize on Low Pressure Set Point.Caused by Fluctuating Output of Bistable When Placed on Trip Point.Bistable Replaced 1989-07-11
[Table view] |
Text
y-_
MICHIGAN STATE UNIVERSITY OttICE OF ASSOCIATE DEAN FOR EAST 1.ANSING
- 48824-1226 GRADUATE 511 DIES AND RESEARCH COLLIGE OF ENGINEERING February 6, 1986 Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No. 50-294 Pursuant to 10CFR50.59 the following is submitted:
- 1. During the period of January 1, 1985 to December 31, 1985, the following experiments were performed.
- a. 29 central thimble irradiations.
- b. 355 rotary specimen rack irradiations
- c. 4 pulse operations
- d. total reactor operation of 39325.32 kilowatt hours
- 2. 41Ar release during the period totaled 25.4 mci or an average release of 2.19 x 10-9 pCi/cc (5.5 MPC).
- 3. There have been no apparent changes in the tank bottom.
- 4. During the period there were 7 unscheduled scrams,
- a. 3 scrams due to linear recorder
- b. 2 linear recorder scrams due to operator error
- c. 2 scrams due to the period meter
- 5. During 1985 there was one student in training for an operator's license. He was licensed in July of 1985 as a Senior Operator.
Sincerely yours, Bruce W. Wilkinson Reactor Supervisor BWW:kk B602190607 860206 PDR ADOCK 05000294 R PM '
[