MICHIGAN STATE UNIVERSITY OttICE OF ASSOCIATE DEAN FOR EAST 1.ANSING
- MICIllGAN
- 48824-1226 GRADUATE 511 DIES AND RESEARCH COLLIGE OF ENGINEERING February 6, 1986 Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Docket No. 50-294 Pursuant to 10CFR50.59 the following is submitted:
1.
During the period of January 1, 1985 to December 31, 1985, the following experiments were performed.
a.
29 central thimble irradiations.
b.
355 rotary specimen rack irradiations c.
4 pulse operations d.
total reactor operation of 39325.32 kilowatt hours 2.
41Ar release during the period totaled 25.4 mci or an average release of 2.19 x 10-9 pCi/cc (5.5 MPC).
3.
There have been no apparent changes in the tank bottom.
4.
During the period there were 7 unscheduled scrams, a.
3 scrams due to linear recorder b.
2 linear recorder scrams due to operator error c.
2 scrams due to the period meter 5.
During 1985 there was one student in training for an operator's license. He was licensed in July of 1985 as a Senior Operator.
Sincerely yours, Bruce W. Wilkinson Reactor Supervisor BWW:kk B602190607 860206 PDR ADOCK 05000294 R
[