ML20137Z505

From kanterella
Revision as of 10:02, 15 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1985
ML20137Z505
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1985
From: Ronafalvy J
Public Service Enterprise Group
To:
Shared Package
ML20137Z276 List:
References
NUDOCS 8510080260
Download: ML20137Z505 (1)


Text

r OPERATING DATA REPORT Decket No. 50-311 Date August 10,1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 Operatins Status Corrected Copy #2

1. Unit Name Salem No. 2 Notes
2. Reporting Period July 1985
3. Licensed Thermal Power (FMt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity (Gross MWe) 1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net FMe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 744 5087 33312
12. No. of Hrs. Reactor was Critical 501.7 2221.4 17316
13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
14. Ecurs Generator On-Line 468 1959.2 16571.3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (bnUI) 1515847 6001904 49728940
17. Gross Elec. Energy Generated (MMI) 497780 1967980 16245630
18. Net Elec. Energy Generated (MWH) 469089 1833560 15351396
19. Unit Service Factor 62.9 38.5 49.7
20. Unit Availability Factor 62.9 38.5 49.7
21. Unit Capacity Factor (using MDC Net) 57.0 32.6 41.7
22. Unit Capacity Factor (using DER Net) 56.5 32.3 41.3
23. Unit Forced Outage Rate 37.2 58.7 40.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2 0510080260 850923 i PDR ADOCK 05000311 l R PDR