F OPERATING DATA REPORT Decket No. 50-311 Date September 10,1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 Operating Status Corrected Copy

1. Unit Name Salem No. 2 Notes
2. Reporting Period August 1985
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (G ro ss MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity (Gross MWe) 1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 744 5831 34056
12. No. of Hrs. Reactor was Critical 648.3 2869.7 17964.3
13. Reactor Reserve Shutdown Hrs. 0 0 3533.6
14. Hours Generator On-Line 636.6 2595.8 17207.9
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (on01) 2128176 8130080 51857116
17. Gross Elec. Energy Generated (MWH) 702010 2669990 16947640
18. Net Elec. Energy Generated (MWH) 669179 2502739 16020575
19. Unit Service Factor 85.6 44.5 50.5
20. Unit Availability Factor 85.6 44.5 50.5
21. Unit Capacity Factor (using MDC Net) 81.3 38.8 42.5
22. Unit Capacity Factor (using DER Net) 80.7 38.5 42.2
23. Unit Forced Outage Rate 14.4 52.7 40.1
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. I'f shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation) :

Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 h

R K