MONTHYEARML20196G3531999-06-23023 June 1999 LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20196G3531999-06-23023 June 1999 LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23
[Table view] |
Text
-
l 4
M North SMBROOK STAnON UMT 1 unasiiii Aflantic Enor0y Servico Corporation j
l i
1-acility Operating Licen )e NPF-86 Docket No. 50-443 l License- Amendment Request No. 92 04 _
Proposed Revision to the Requirement for the Operations Manager to Maintain a Senior Reactor Operator License ,
1 l
This Licenso Amendment Roquest is submitted by North Atlantic Energy l Servico Corporation pursuant to 10C. R50.90. The following information is l enclosed in support of this License Amendment Roquest: I
.Section I -
Introduction and Descriptiors of Proposed Changes )
. Section 11 -
Markup of Proposed Changes 1
. Section lli -
Rotype of Proposed Changes l i
.Section IV -
Safety Evaluation of Proposed Changes
.Section V -
Determination of Significant Hazards for Proposed Changos i
. Section Ut +
Proposoo Schedule for License Amendment issuance and Ettoctiveness n
n . Section Vil -
Environmental Impact Assessment 28 GOR c.
Sworn and Subscribed 4
$6 to before me this /
go _ ;{ps' dayof/b/*h/frA ,1992
- L a-t_
!/2[M[29/kkh8M j
St*/ .As 7 Bruce L. Drawbr' ge
'1r) Public Executive Dire 36 Nuc mcn.
k E -- n.
r Production
. _ _ _ . . . . - , _ _ - _ . - . - - _ _ _ _ . _ . _ - . - _ _ _ _ . _ _ _ _ . _ _ ~ _ _ .
. i f
1, introduction und lincription of Proon,cd Chanen '
P A. Introduction
?
The purpose of the proposed Technical Specification _ change is to revise Technical .
Specification 612f, ' Station Staff', to require that the Operations Manager hold or !
have held a senior scactor operator license prior to assuming the position as - ;
Operations Manager. l Technical Specification 6 2.21 currently requires both the Operations Manager and the '
Assistant Operations Manager to hold a ser!or reactor operator license. This requirement is consistent with Section 13,1.2.2 b of the Seabrook Station Updated Final Safety Analysis Report (UPSAR). The UFSAR also states that all Station personnel either rnect os exceed the minimum qualifications recommended in ANSI /ANS 3,11978 (Sclection and Training of Nuclean Power Plant Personnel).
The guidance that the Operations Manager hold a senior reactor operator license was ;
revised in ANSI /ANS 3.1 1967. The 1987 sevision of ANSl/ANS 3J states that the '
Operations Manager shall meet one of four special requirements:
t lloid a senior reactor operator license !
llave held a license for a similar unit llave been certified at an appropriate simulator for equivalent senior operator knowledge llave been certified on plant operational knowledge based on the plant manager job analysis The-1987 revision also states that if the Operations Manager does not hold an NRC license, then the " Operations Middle Manager" shall_ hold a senior reactor operator license, e
r Maintaining a r.enior reactor operator license acquires the expenditure of a significant amount of time in requalification training. This training typically consumes a j minimum of six weeks for senior reactor operator licensees on an annual basis. As '
stated in the UFS AR, _ thel Operationr, Manager is responsible for managing the operation of the Station in compliance with Tecl~nical Specifications and other license requirements. To facilitate this .esponsibility- the Operations Department is-structured to provide several-!ayers ef direct technical supervision. Each level of shift supervision, from the St pervisory Control Room Operator on shift to the Shift Superintendent, is supervised by a licensed individual. The most senior individuals _
on shift, the Shift Superintendents, are supervised ' by the. Assistant ' Operations Manages, who holds,. and will continue to be required to hol_d, a senior reactor ,
operator license. ;
The proposed _ change is consistent with the current industry guidance as delineated ~
in ANSI /ANS 3.1 1987 and with similar 4mendments approved by the -NRC for- D.ske Power's Oconec and McGuire plants. In addition, as described above, the proposed--
change will enhance the safe operation of the plant by increasing the amount of1 time-L the Operations Manager can devote to fulfilling his primary responsibilities.
I l'
l 1
-_ . , . - _ . . . , - %.-,,,,__.. ---_,._,,_.,.._m.,--m_,_,,,, , m_..,,,_._,,,..,_,m.,,,,% ..m..~,+. ,-
- - - - . - . . ~ . . . . . . - - . . - . - . -_ - - - - - -.- - _.-.-_-_
11, Description of Proposed Chariges The proposed change would revise Technical Specification 6.2.2 as follows:
- 1. Section 6.2.2f would be reviseci in delete the requirement that the Operation.
Sianager hold a senior reactor operat r license and instead require the Operations hinnager to hold or have hcid a tenior scactor operator license for ;
Seabrook Station prior to assuming trie Operations hianager position, j l
- 2. A new paragraph 6.2.2g would be_added to retain the current requircinent that the Assistant Operations hianager hold a senior reactor operator license.
1 e
T t-f I
h j
s k
4 l
I 4
P i -- .
_ _ . _ . _ _ . .. . - . _ , _ . _ . . . . _ _ . _ _ . _ . _ . _ . . _ ~ . . . - _ . - _ . _ ~ _ _ . _ . _ _ . _
't 4
+ .
4
- 11. Markup of I'roposed Chances .
St,.c attached markup of proposed changes to Technical Specifications. ,