License Change Request 91-10 to License NPF-57,revising Explosive Gas Mixture & Radioactive Gaseous & Liquid Effluent Monitoring Instrumentation Sections of TS to Correct Grab Sampling Provisions
ML20091D793
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/17/1991
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091D796 List:
References
NLR-N91143, NUDOCS 9110290258
Download: ML20091D793 (6)


Text

e 6

  • 1 Pubbc Service Electric and Gas Company

' St:nley LaBruna Put%c Serv;ce Eioctric and Gas Company P O Box 236. Hancocks Budge, NJ 08038 609 339-4800

- v u e,u+4 u- o--- 0CT 17 1991 NLR-N91143 l l

Reference:

LCR 91-10 U.S. Nuclear Regulatory Commission Attention: Document Control Desk washington, DC 20555 Gentlemen:

REQUEST FOR AMENDMENT FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) hereby transmits an application to amend Appendix A of Facility Operating License No. NPF-57 in accordance with 10CFR50.90. This amendment request would revise the Explosive Gas Mixture and the Radioactive Gaseous and Liquid Effluent Monitoring Instrumentation sections in the Hope Creek Generating station (HCGS) Technical Specifications.

A description of the requested amendment, supporting information and analyses for the change, and the basis for a no significant hazards consideration determination are provided in Attachment 1.

The Technical Specification pages affected by the proposed change are marked-up in Attachment 2.

Pursuant to the requirements of 10CFR50.91(b) (1) , PSE&G has provided a capy of this amendment request to the State of New Jersey.

Upon NRC approval of this proposed change, PSE&C requests that the amendment be made c"*ective on the date of issuance, but implementable wit Sin sixty days to provide sufficient time for asnociated admir.13t' ative activities.

9110290258 911o17

h j

{DR ADOCK 05000334 I one

e 8 00T 17 1991 Document Control Desk -

2 -

NLR-N91143

- Should you have any questions regarding this request, we will be pleased to discuss them with you.

Sincerely,

  1. W Attachments Affidavit

-C Mr. T. T. Martin, Administrator USNRC Region I Mr. S. Dembek l USTRC Licensing Project Manager 1 l

Mr. T. P. Johnson USNRC Senior Resident Inspector Mr.'K. Tosch, Chief, Bureau of Nuclear Engineering

~

New Jersey Department of' Environmental Protection

---_a --- -----

. - . . . _. . .. .- ._._-m. . . - ~ . . - -

_( ... ,

y;' '

m 1; '-

REF: NLR-N91143 J

lis , ,

_ STATE 07 'NEW JERSEY _ )

l _

)- SS.

+

COUNTY OF SALEM-

-)

} IStanley LaBruna,- being duly sworn according to it w deposes and.-

.. sayst

  • I am Vice President -

, Nuclear Operations of Public Service '

-I find.the matters sat Electric forth inand our/ Gas Company, letter dated and OCTas such,1 17199 , .<:oncerning the Hopo Creek Generating Station, are true to the best of ry knowledge,

-information aad beli6f.

,r d n kWe Subscribed and'SwornJto fore me- I this' - / '7 day of Q n w , 1991 tisf-L .,sEl NotaryPqplicofpewJersey ELIZABETH J. KIDD No'.ary PuMu of New J6rsey M/Comm;ssion Empires April 25,1995

My commission e:cpireof on 4

W f_4 i,

i-

[

m I

.. . , . - _ :. - z. ..,; .. .- _. . _ _ . . . _ - . - - a -. . .

) I f

Of t II:R 91-10 ATIN1MNr 1 1

.1 LTDIRED 'IECINIGL SITUTFIGTIO6 AND IA95 06 l l

4

44 i

HEXu2D ODME 10 71E 7EQMIchL SR0CIFIOLTIGE - 1

Y#TT.T7Y OIYRATIFh3 LICBER NET-57 1XN15 CREEK GDhEATDC 17IATICN D10M' MJ. 50-354 mf: IIR 91-10 I. M W.CN OF 'fHR QPJEE As shown on the marksd-up Technical Specifications (75) pages in Attactamt 2, PSE&G regnests that TS 3.11.2.6, ACTION b, be revised to agrue with the i corruur.=dirg ACUCH b of TS 3.3.7.11 ard ACTIN 124 of Table 3.3.7.11-3.

i IL,,, FFADCN FM 'DE,,GBHgg The current IS involved jn this request are in disagreement with each other 1 and require clarification. With Effluent monitoring instrumentation incperable, ACTICH b of specificatier. 3,,3.7.11 and ACHON 124 Of Table

- 3.3.7.11-1. as well as several other 'IS coctions that contain similar grab sanpliry provisions, permit ecuttncad diMaarge via the affected pathway provided that grab.sanples are catained and analyzed on a specific frequency.

In those TS, tif inoperable monitoring equipment that is beirq ungsated for by grab sanplirq is not restored to OPERABG status within 30 days, an explanation is required in the next Semi-annual PMiological Effluent Release Repart; however, the discharges are wt restricted to 30 days. Carrently,

, with the came effluent monitora as in TS table 3.3.7.11-1 inoperable, Section 3.11.2.6, ACTICt! b, permits continued use of the main condcnser off-gas troatrwnt system for only 30 days ard has to reportirg requirement.

III. JLurmCATIN FM 41E OIANGE A7fION 124 of Table 3.3.7.11-1 and other TS requirements that contained similar. grab sanpliry provisicas were originally written in a manner rosarbliLg tim cmTunt 7S 3.11.2.6, ACTION b to agree with the NRC staff's

. orii g mi model Radtologictd Divirurunental Tedinical Specifications (RETS) guidanue, NJREG 0473. However, in accordance with a suteequent revision to the NURa3 0473 guidance, the liCGS Facility Operatirg 11 cense was modifjed, in Amerdment 2, to Ited as it now exists in all but is 3.11.2.6. ACTION b. 7his one specificaticn was' overlooked when the change in wordity was requested by PSFAG. As described in the NRC's Safety Evaluation supportirg that amendment, the prrrrrM wordirg is consistent with the intent of, ard follows closely the staff's tuvised 1EIS guidance provided in NURDG 0473, Revision 2. Since an alternate method is available to a=ma the noasurvd pnranter when th; primary mothed its unavailable, the intent of the TS is satisfied. This change will elimimte conflicting requirements for the came equipnent ard make all similar TS samplirg requirements consistant.

  1. 4 10&R50.92 s12ilELCMft 11AZAlu 02clInwTlm ANAINsIs MTJG has, pursuant to 10CD50.92, reviewod the pIqvvuvi amordment to dotarmino dwtimr our request involves a sicptificant hazards consideration. We twwe determirul timt

'IM 'coeruticri of Ikme Creek Cenarat;hn Statim 010C8) in amordance with tim DD;&KEMEldat2Lyill not involve a slanifinint incruano in the ordability or car ===_m of an amirkt nrwicamiv evduat@

'Ihe proposed amrdemt cbos not involve a prysical or prvmhmal darge to ainf structure, couponent or system that significantly affects the probability or consequences t f any amich t or malfunc+1cn of equipment inportant to safoty i

previously evaluated in the Updated Firal Safety Arnlysis Report (UPSAR). 'Itm prrprM dange will bring the affected TS into agrocutent with other similar specifications ard is escuntially administrativo in nature.

'IM meratim of_lkgLgrook Garcruths Statim UICCS) in _acoordanon with_tig muwed demo will_rnt crmte tJe ogtgribilitv3f__a tw or differut kird of accirht frun any urwiouniv evaluate

'Itere are no physical danges to the plant or to the mnnor in whidt the plant is operated involved in the proposed revisim. '1hereforu, no now or different accident is created by the pnposed chargo.

'De caratim of_ Hooo Creek GeneratimRat,lcn (1100S) _ _in accortimoo with _tig nruocoed dmrre does rxyt involve a nianificnnt rulucticn in a mruin of safttv.

'Ihis diarge is adrainistrative in nature. 'Itm proposed wording ciange was pruviously twiewed ard approved by the NRC staff in Anondment 2 to tim FDL.

As describcd in ttm Safety Evaluation supportify that amorrhnent, tha prqmai wordirn is consistent with tho intent of, ard follcus clocaly tim staff's revisod Radiological Environmental Technical Specifications (lu!rS) guidarx:e provided in IAHur, 0473, Revision 2. We, therefore, have determinod tlut there is no significant reduction in eny nargin of safety involved in this dargo.

Oorclunim; Ibnod upon tie ahne, we have determinod tint this pruraxd diargo does not involvo a Significant flazards Conairbration.