ML20093C661
From kanterella
ML20093C661 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 05/31/1984 |
From: | Shaber C EG&G, INC. |
To: | NRC |
Shared Package | |
ML20093C663 | List: |
References | |
CON-FIN-A-6457, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8406150095 | |
Download: ML20093C661 (35) | |
Similar Documents at South Texas | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20199G8401997-11-0606 November 1997
[Table view]Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 ML20140G4531985-09-30030 September 1985 Draft Conformance to Reg Guide 1.97 South Texas Project, Units 1 & 2 ML20104A7261984-07-19019 July 1984 Technical Evaluation Rept of Detailed Control Room Design Review,South Texas Project ML20093C6611984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase II) ML20093C6651984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase I), Draft Technical Evaluation Rept ML20087M6421984-01-31031 January 1984 Draft, Mitigative Techniques & Analysis of Generic Site Conditions for Groundwater Contamination Associated W/ Severe Accidents ML20079P1591984-01-0606 January 1984 Technical Evaluation of PRA for Tornado & Hurricane Missile Hazard to Containment Isolation Valve Compartment Equipment, South Texas Project ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 1997-04-24 Category:QUICK LOOK MONTHYEARML20199G8401997-11-0606 November 1997
[Table view]Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 ML20140G4531985-09-30030 September 1985 Draft Conformance to Reg Guide 1.97 South Texas Project, Units 1 & 2 ML20104A7261984-07-19019 July 1984 Technical Evaluation Rept of Detailed Control Room Design Review,South Texas Project ML20093C6611984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase II) ML20093C6651984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase I), Draft Technical Evaluation Rept ML20087M6421984-01-31031 January 1984 Draft, Mitigative Techniques & Analysis of Generic Site Conditions for Groundwater Contamination Associated W/ Severe Accidents ML20079P1591984-01-0606 January 1984 Technical Evaluation of PRA for Tornado & Hurricane Missile Hazard to Containment Isolation Valve Compartment Equipment, South Texas Project ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 1997-04-24 Category:ETC. (PERIODIC MONTHYEARML20199G8401997-11-0606 November 1997
[Table view]Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 ML20140G4531985-09-30030 September 1985 Draft Conformance to Reg Guide 1.97 South Texas Project, Units 1 & 2 ML20104A7261984-07-19019 July 1984 Technical Evaluation Rept of Detailed Control Room Design Review,South Texas Project ML20093C6611984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase II) ML20093C6651984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase I), Draft Technical Evaluation Rept ML20087M6421984-01-31031 January 1984 Draft, Mitigative Techniques & Analysis of Generic Site Conditions for Groundwater Contamination Associated W/ Severe Accidents ML20079P1591984-01-0606 January 1984 Technical Evaluation of PRA for Tornado & Hurricane Missile Hazard to Containment Isolation Valve Compartment Equipment, South Texas Project ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 1997-04-24 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20199G8401997-11-0606 November 1997
[Table view]Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20140G5721997-04-24024 April 1997 Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits ML20117E2201996-06-28028 June 1996 Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept ML20094A4841995-08-31031 August 1995 Technical Evaluation Rept,Rev 6 for Plant Odcm ML20080J1841995-02-28028 February 1995 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 ML20059F4291993-12-31031 December 1993 Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant ML20080G3131993-03-31031 March 1993 Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl ML20082M5771991-08-31031 August 1991 a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning ML20084T3341991-01-31031 January 1991 Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation ML20059N7941990-06-30030 June 1990 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 ML19332B6171989-11-30030 November 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. ML20012A9911989-11-30030 November 1989 Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. ML20235M0021987-06-30030 June 1987 Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept ML20235M3801987-06-30030 June 1987 Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept ML20215M1091987-05-31031 May 1987 TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept ML20215M3061987-05-31031 May 1987 Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept ML20235M0401987-03-31031 March 1987 1 Sqrt Rept, Informal Rept ML20214R3791987-02-28028 February 1987 Review of South Texas Project Quality Data Processing Sys Reliability Study, Draft Technical Evaluation Rept ML20207N2461986-12-16016 December 1986 Technical Assistance to Nrc,Region Iv,For Preservice Insp, Monthly Ltr Rept for Nov 1986 ML20211K5101986-11-30030 November 1986 Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 ML20215M8911986-10-20020 October 1986 Technical Assistance for Preservice Insp, Monthly Ltr Rept for Aug & Sept 1986 ML20204G1921986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe ML20207F1591986-07-0808 July 1986 Energy Technology Engineering Ctr Technical Assistance to NRC for Preservice Insp, Monthly Ltr Rept for June 1986 ML20140G4531985-09-30030 September 1985 Draft Conformance to Reg Guide 1.97 South Texas Project, Units 1 & 2 ML20104A7261984-07-19019 July 1984 Technical Evaluation Rept of Detailed Control Room Design Review,South Texas Project ML20093C6611984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase II) ML20093C6651984-05-31031 May 1984 Control of Heavy Loads at Nuclear Power Plants,South Texas Project,Units 1 & 2 (Phase I), Draft Technical Evaluation Rept ML20087M6421984-01-31031 January 1984 Draft, Mitigative Techniques & Analysis of Generic Site Conditions for Groundwater Contamination Associated W/ Severe Accidents ML20079P1591984-01-0606 January 1984 Technical Evaluation of PRA for Tornado & Hurricane Missile Hazard to Containment Isolation Valve Compartment Equipment, South Texas Project ML20055A3061982-06-28028 June 1982 Mod 1,clarifying Period of Performance to Commence 820301, to Expert Consultation & Witness Svc for South Tx Project Hearings ML20055A3021982-06-28028 June 1982 Notification of Contract Execution,Mod 1 to Expert Consultation & Witness Svc for South Tx Project Hearings. Contractor:W Hubacek ML19341C6981980-12-31031 December 1980 Environ Statements Project, Monthly Progress Rept for Dec 1980 1997-04-24 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20093C661&oldid=2790153"