ML20094A884

From kanterella
Revision as of 09:00, 3 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend Relaxing Requirements of Amend 3 to License NPF-18,to Meet Requirements of License Condition 2.C.(7) Re Effective Amend Date Before Completion of Startup Test Program for CRD Discharge Pressure Mod.Fee Encl
ML20094A884
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/31/1984
From: Rybak B
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
9044N, NUDOCS 8408060144
Download: ML20094A884 (2)


Text

  • -

, ** [ Commonwealth Edison

) One First N!tional Plaza. Chicigo, Ilknois

/

is O '7 Address Reply to: Post Office Box 767 (j' Chicago, Illinois 60690 July 31, 1984 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Unit 2 Emergency Amendment to Technical Specification for Facility Operating License NPF-18 Reactor Scram on Low Control Rod Drive Pump Discharge Pressure Modification NRC Docket No. 50-374 References (a): NPF-18 License Condition 2.C(7) Low Pressure in Pump Discharge of the Control Rod Drive.

(b): FSAR Section 4.6.2 pages 4.6-9, 26, 31.

(c): FSAR Section 7.2 pages 7.2-8, 10, 65, 65a, 65b, 65c, 92, 93, Figure 7.2-5.

(d): SSER #2 4.6.2, Control Rod System.

(e): SSER #7 7.2, Control Rod Drive Low Charging Pressure Scram.

( f): J. G. Marshall to H. R. Denton dated May 24, 1984.

Dear Mr. Denton:

Commonwealth Edison requests an emergency amendment to Facility Operating License NPF-18. Reference (f) submitted the original request, in accordance with License Condition 2.C.(7) and was approved as Amendment No. 3 effective July 24, 1984. Commonwealth Edison was not aware of that approval until verbally notiff ed on July 30. The Station has initiated the modification work to incorporate this reactor scram; on July 30 testing of the modification identified spurious scrams which at this point we cannot identify their origin. The Unit is currently shut-down and we wish to restart the Unit tonight. Therefore, we intend to jumper out this low pressure scram logic. Accordingly, Commonwealth

\

8400060144 840731 PDR ADOCK 05000374 i P PDR QkW fjfC,0g

H. R. Denton July 31, 1984 Edison requests relaxation from the requirements of Amendment No. 3 to meet the requirements of License Condition 2.C(7) 1.e., to relax the offective date of the amendment to prior to completion of the startup

-test program. Plant startup testing is expected to be completed sometime in October, 1984. References (d) and (e) provided interim justification to at least the completion of the startup test program and we feel they both are still applicable. We have reviewed this amendment request and find the original significant hazards consideration, as provided in reference (f), is still applicable.

In accordance with 10CFR170, a fee remittance of $150.00 is cnclosed.

Please direct any questions you may have concerning this matter to this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal are provided for your use.

Very truly yours,

/

B. yb k Nuclear Li en ng Administrator

'1m cc: Region III Inspector - LaSalle A. Bournia - NRR G. Wright - Ill.

SUBSCRIBEQ and. 3 0RN,to befa c this 3/(Tday of a X 1984 No tary 'Public 1

9044N

. _ _ _ - _ _ _ _