ML20078N648

From kanterella
Revision as of 14:17, 24 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval
ML20078N648
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/10/1995
From: Meisner M
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078N651 List:
References
GNRO-95-00014, GNRO-95-14, NUDOCS 9502160057
Download: ML20078N648 (4)


Text

$h- 5~ ENTERGY r EIM*""*"*""*'

Ret Gbson. MS 39150 -

Te! 001437 (A70 M. J. Meisner February 10, 1995 oe

%u wa n,% %

U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555

. Attention: Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Dockbt No. 50-416 License No. NPF-29 Conversion to Technical Specifications based on NUREG 1434

" improved Technical Specifications Revision 0" Proposed Amendment to the Operating License (PCOL-93/11 Revision 3)

Reference:

1) GNRO-94/00130, Conversion to Technical Specifications based on NUREG 1434 " Improved Technical Specifications Revision 0" Proposed Amendment to the Operating License (PCOL-93/11 Revision 2), dated November 10,1994.
2) GNRO-93/00122, Drywell Bypass and Drywell Airlock Testing, Proposed Amendment to the Operating License (PCOL-93/13), dated October 22,1993.

GNRO-95/00014 Gentlemen:

Entergy Operations, Inc. by this letter is submitting a revision to the proposed amendment to the Grand Gulf Nuclear Station (GGNS) Opsrating License submitted via Reference 1 and an addition to the proposed changed submitted via Reference 2.

Enclosure 2 of this letter provides the revised pages of the previous submittals to document the resolution of items as discussed with the Staff. Also enclosed for your information is a copy of the tables of the proposed Technical Specifications.

Enclosure 2 modifies the Reference 2 request to perform the Drywell bypass leakage rate surveillance on a performance based interval. The change was requested to be issued concurrent with the issuance of the improved Technical Specifications to support the Technical Specification conversion effort and reduced unnecessary testing during the up-coming refueling outage. The Reference 2 requested surveillance is modified to allow the Staff additional time to review the remainder of the requested change. The revised surveillance does not supersede the Reference 2 requested change and Entergy Operations, Inc. requests that the Staff complete their review of the requested change in a timely manner. Entergy Operations, Inc. requests that any Staff technical concerns relating to the Reference 2 requested change be identified such that any outstanding 9502160057 950210 i PDR ADOCK 05000416 8 l

P PDR I

4 issues can be resolved before or during a meeting between the Staff and Entergy Operations, Inc. prior to July,1995.

During discussions with the Staff concerning the acceptability of the proposed changes to LCO 3.0.4, the Staff identified a concern regarding inoperable ECCS actuation instrumentation in MODES 4 and 5. In MODES 1,2, and 3, the ECCS instrumentation LCO provides specific Required Actions and Completion Times if an inoperable instrument results in a loss of ECCS actuation capability . GGNS will put in place administrative  !

controls to ensure that losses of ECCS instrumentation actuation capability in MODES 4 and 5 will have compensatory actions taken consistent with those required in MODES 1, 2, and 3.

Enclosure 2 of this letter provides a detailed description of the proposed Technical Specification (TS) changes. The requested changes are bounded by the previous basis '

provided in References 1 and 2 for the determination that the proposed amendment involves no significant hazards considerations based on the guidelines presented in 10CFR50.92.

As previously discussed with the Staff, Entergy plans to implement the Improved Technical  ;

Specifications at GGNS approxirnately 30 days before our seventh refueling outage.

Therefore, we request that this change receive review priority to support its approval by February 17,1995.

In accordance with the provisions of 10CFR50.4, the signed original of the requested amendment is enclosed and, in accordance with 10CFR50.30, an Oath or Affirmation relating to the requested changes to the Operating License is enclosed. l l

You truly, s I hisisner

  • Director, Nuclear Safety and Regulatory Affairs i

\BSF

Enclosures:

1. Affirmation per 10CFR50.30 (1 page)
2. Markup of Affected TS and Bases (50 pages)
3. TS Tables (5 pages)

~

February 10, 1995 GNRO-95/00014 Page 3 of 3 cc: Mr. H. W. Keiser (w/o) i Mr. R. B. McGehee (w/o)

Mr. N. S. Reynolds (w/o)

Mr. J. E. Tedrow (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a) '

Regional Administrator U.S. Nuclear Regulatory ConJmission l Region ll i 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2)

Office of Nuclear Reactor Regulation i U.S. Nuclear Regulatory Commission ,

Mail Stop 13H3 Washington, D.C. 20555 Mr. C. S. Schulten (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 11E22 ,

Washington, D.C. 20555 ,

Dr. Eddie F. Thompson (w/a) l State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39205 t

Enclosure 1 to GNRO-95/00014 g Pig 31 of 1 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 DOCKET NO. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and SYSTEM ENERGY RESOURCES, INC.

and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.

AFFIRMATION I, M. J. Meisner, being duty sworn, state that I am Director, Nuclear Safety and Regulatory Affairs of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources,  ;

inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc.

to sign and file with the Nuclear Regulatory Commission, this application for amendment of the l Operating License of the Grand Gulf Nuclear Station that I signed this application as Vice President, Operations GGNS of Entergy Operation , Inc.; and that the statements made and the matters set forth therein are true and correct to e best of y knowledge,information and belief.

1

/ "w I M. J. Meisner STATE OF MISSISSIPPI County of Claiborne SUBSCRIBED AND SWORN TQefpre me, a Notary Public,in and for the County and State above l

named, this /ON day of -rgem ,1995.

T (SEAL)

- (210 -

\ Notary Public '

E Y FI'EUC MY COMMISSION EXPIRES JINE 5,1999 Il0KDE:D THRU STEGAIL NoTAKy strxim

_ _ - _ - _ _ _ - _ - - _ - _ _ _ - _ _ _ _ _ _ .