Rev 3 of Test Spec 23A6999, Isolation Condenser & Passive Containment Condenser Test Requirements
ML20078R014
Person / Time
Site: 05200004
Issue date: 01/09/1995
From: Fortin A
GENERAL ELECTRIC CO.
To:
Shared Package
ML20078R003 List:
References
23A6999, NUDOCS 9502220166
Download: ML20078R014 (51)


Text

'

Enclosure to MFN No. 025-95 EIS IDENT: ISOL COND/PSCC TEST REQ

& GE Nuclear Energy 23As999 REv 3 SH NO. 1 REVISION STATUS SIIEET DOCUMENT TITLE ISOLATION CONDENSER & PASSIVE CONTAINMENT CONDENSER TEST REQUIREMENTS LEGEND OR DESCRIPTION OF GROUPS TYPE: TEST SPECIFICATION FMF: SBWR l - DENOTES CHANGE MPL ITEM NO: B32-3030fr15-3030 REVISIONS C A PRELIMINARY ISSUE DMH5018 NOV 121991 1 FE WILHELMI SEP 291992 RJA DMH5738 CHKBY FE WILHELMI GW FITZSIMMONS 2 A. FORTIN AUG 231994 RJA CN015SS 84LLM CHK BY: A. FORTIN 3 A. FORTIN JAN 0 9 E g;3 CN01911 CHK BY: A. FORTIN PRINTS TO MADE BY APPROVALS GENER AL ELECTRIC CON 1PANY 175 CURTNER AVENUE FE WILHELM1 ()4/23/91 GW FITZSIMMONS I1/12/9i S AN JOS E, CA 95125 Cif KD BY ISSUED '

FE WILilELMI 11/12/91 GA BAYLIS 11/12/91 CONT ON SHEET 2 EIS l

I 9502220166 950215 PDR ADOCK 05200004 A PDR j

1 h GE Nuclear Energy 23A6999 REV 3 su No. 2 TABLE OF CONTENTS SHEET NO.

1. SCOPE 4
2. APPLICABLE DOCUMENTS 4 2.1 GE-Nuclear Energy Documents 4 2.2 Ansaldo Documents 4 2.3 Other Documents 5 3.

DESCRIPTION AND GENERAL TEST REQUIREMENTS 5 3.1 Introduction 5 3.2 Test Objectives - Passive Containment Condenser 5 3.3 Test Objectives-Isolation Condenser Tests 5

.3.4 General Strategy and Description of Tests 6 3.5 Deleted 6 3.6 Test Plan and Procedures 7 3.7 Quality Assurance Requirements 7 3.8 Data Transmittal and Reporting Requirements 8

4. TEST FACILITY REQUIREMENTS S 4.1 Facility Requirements for the PCC 8 4.2 Facility Requirements for the IC 12 4.3 Data Recording Requirements (PCC and IC Tests) 23
5. PASSIVE CONTAINMENT CONDENSER TESTS 30 5.1 General Test Procedures 30 5.2 PCC Test Strategy 31 5.3 Data Processing / Analysis General Requirements 38
6. ISOLATION CONDENSER TESTS 39 6.1 General Test Procedures 39 6.2 Required Test Conditions 40 6.3 Data Processing / Analysis General Requirements 43 APPENDICES:

A. REFERENCE NIATRIX OF PCC TEST CONDITIONS 46 it REFERENCE MATRIX OF IC TEST CONDITIONS 50 1

1 l

l

O 1

h GE Nuclear Energy 23A6999 REV 3 su No. 3 LIST OF FIGURES SHEET NO.

4-1 SCHEMATIC OF PCC TEST FACILITY 13 4-2 REQUIRED DIMENSIONS FOR PCC TEST POOL 14 4-3 LOCATION OF PCC WALL TEMPERATURE MEASUREMENTS 15 4-1 PCC STRUCTURAL INSTRUMENTATION 16 4-5 SCHEMATIC OF IC TEST FACILITY 24 4-6 REQUIRED DIMENSIONS FOR IC TEST POOL 25 4-7 IC STRUCTURAL INSTRUMENTATION 26 61 BASIC IC TEST CYCLES 44 62 REQUIRED IC INLET PRESSURE FOR TEST CONDITION NO.1 45 LIST OF TABLES l-1 Required Thermal-1lydraulic Measurements-PCC Test 17 4-2 Requit ed Structural Measurements-PCC Test IS 1-3 Required Thermal-Hydraulic Measurements-IC Test 27 1-1 Required Structural Measurements-IC Test 28 4-5 Water Quality Requirements 29 i

)

l

)

l <

h GE Nuclear Energy 23A6999 REV 3 sn so. 4 TEST SPECIFICATION FOR IC & PCC TESTS

1. SCOPE This document specifies the requirements for tests of full-scale prototypes of the isolation condenser (IC) and passive containment cooling (PCC) condenser designed for use in the Simplified Boiling Water Reactor (SBWR). The purpose of the tests is to confirm the thermal hydraulic and structural adequacy of the Ansaldo designed hardware for use in the SBWR.
2. APPLICABLE DOCUMENTS 2.1 GE-Nuclear Enerev Documents
a. Isolation Condenser System Piping and Instrumentation Diagram, Drawing Number 107E5154.
b. 1 solation Condenser System Design Specification, Document Number 25A5013.

i

c. Isolation Condenser System Interlock Block Diagram, Drawing Number 137C9292. l
d. Isolation Condenser System Process Flow Diagram, Drawing Number 107E6073.
c. Passive Containment Cooling System Piping and Instrumentation Diagram, Drawing Number 107E5160.
f. Passive Containment Cooling System Design Specification, Document Number 25A5020.
g. l'assive Containment Cooling System Piocess Flow Diagram, Drawing Number 107E6072.
h. SBWR Composite Design Specification, Document Number 23A6723.
i. Containment Configuration Data Book, Document Number 25A5044.

2.2 Ansaldo Documents

a. IC II.X. Equipment Requirements Specification. Document Number SBW 5280 TN1XN014000.

l b PCC Equipment Requiiements Specification. Document Number SBW 5280 TNIXN015000.

c. Passive Containment Cooling and Isolation Condenser Prototype Structural Instrumentation, Document Number SBW 5280-TNIX-1115000,
d. IC Pool Compartment Arrangement. Drawing Number SBW5280DMNN1103.

t h GE Nuclear Energy 23A6ogo REV 3 su so. 5

e. IC Prototype General Arrangement. Drawing Number SBW5280DhlNX1106.  ;
f. PCC Pool Compartment Arrangement. Drawing Number SBW52SODh!NX1102.
g. PCC Prototype General Arrangement. Drawing Number SBW5280Dh1NX1105.

2.3 Other Documents

a. "SBWR Design and Certification Program, Quality Assurance Plan", Report NEDG-31831, hlay 1990.
b. " Fluid hieters, Their Theog and Application", ash!E, Sixth Edition,1971. l l

l

3. DESCRIPTION AND GENERAL TEST REQUIREh!ENTS 3.1 Jntroduction. The tests specified in this document are part of the program to design and certify the SBWR. The IC system and the PCC system perform vital roles in removing heat from the reactor vessel and the coritainment during certain postulated operating and accident conditions.

Full-scale, prototypical condensers for these systems are to be tested at full pressure, temperature and flow conditions.The test facilities specified for this program are not representative of the SBWR systems of which these condensers will be a part. The specified tests are component " Design Qualification Tests" tests and therefore the test system performance is not intended nor expected to ,.

be representative of the SBWR system performance.

3.2 Test Objectives- Passive Containment Coolingfondenser. The general objectives of the full-scale PCC test are as stated in the following paragraphs. The specific objecdves described in Paragraph 5.1.1 provide additional details to the general objectives.

3.2.1 Theimal-Hvdraulic. Confirm that the Ansaldo designed PCC meets the the mal-hydraulic performance requirements for use in the SBWR. Performance requirements are specified in Reference f. of Paragraph 2.1.

3.2.2 Structural. Confirm that the mechanical design of the Ansaldo PCC is adequate to assure the structural integrity of the unit for the expected SBWR lifetime process service conditions.

3.3 Test Ohicctives -Isolation Condenser Tests. The general objectives of the full-scale IC test are as stated in the following paragraphs. The specific objectives of Paragraph 6.1.1 provide additional details to the general objectives.

3.3.1 Thermal-Hvdraulic. Confirm that the Ansaldo designed IC meets the thermal-hydraulic performance requirements for use in the SBWR. Performance requirements are specified in Reference b. of Paragraph 2.1.

3.3.2 Structural. Confirm that the mechanical design of the Ansaldo IC is adequate to assure the structural integrity of the condenser for the SBWR lifetime process service conditions expected between In Service Inspections.

h GE Nuclear Energy 23Acooo REV 3 su n a 3.3.3 In Service Inspection. Confirm the adequacy of proposed In Service Inspection (ISI) procedures and methods by performing NDE tests prior to testing and after thermal-hydraulic testing has been completed. (Test Requestor will provide NDE testing ofIC.)

3.3.4 Leak Detection Methods. Record reference data for use in evaluation of proposed methods for IC system leak / break detection. (See Paragraph 6.1.1.4) 3.4 General Stratetry and Description of Tests 3.4.1 Definitions. This specification uses the following definitions in referring to the various responsibilities related to the PCC and IC tests:

Test Requestor -The organization requesting the tests and specifying the requirements, i.e. the SBWR Design Team (GE lead).

. Test Performer-The organization responsible for the test facility and performance of the tests, i.e. SIET.

Responsible Test Engineer-The engineer, representing the Test Requestor, responsible for supervising the preparations for testing and the test performance. For the PCC and IC tests this is an ENEA engineer.

3.4.2 PCC Tests. A full-scale unit (two modules) of the Ansaldo designed PCC as described by the documents referenced in 2.2.b and 2.2.g will be tested to accomplish the objectives stated in Section 3.1. Most of the testing will be done at near-steady-state conditions covering the range of the process variables required for SBWR. The condenser pool temperature for most tests will be the equilibrium (steady-state) value and the water levelin the pool will be maintained at the normal level (full). The inlet (drvwell) pressure, the steam flow rate and the flow rate of noncondensible gases in the inlet steam will be systematically varied. The tests will include sufficient pressure / temperature cycles (five times the number of cycles used for design) to confirm the struc tural in tegrity.

3.4.3 IC Tests. One-half (single module) of a full-scale unit of the Ansaldo designed IC as described by the documents referenced in 2.2.a and 2.2.e will be tested to accomplish the objectives stated in Section 3.2. The majority of the tests will be slow transients simulating the thermal cycles defined in the IC design specification. It is planned to perform 1/3 of the expected lifetime thermal cycles. At the conclusion of the testing the condenser will be inspected, using the normalISI procedures, to confirm that there is no excessive deformation, crack initiation or excessive crack  ;

growth rate.

Periods of steady-state operation at various conditions will be used to confirm the adequate capacity  !

of the condenser and verify the expected thermal hydraulic charactensucs.

3.5 DELETED

I h GE Nuclear Energy 23asooo REV 3 su so. ,

3.6 Test Plan and Procedures. The tests shall be performed in accordance with a Test Plan and Procedures (TP&P) document to be prepared and issued by the Test Performer and approved by the Responsible Test Engineer. The TP&P shall be a traceable and retrievable document of test requirements consisting of the following parts:

a. Section 1 -Test Plan. Describe how the test is to be set up and performed to meet the quality assurance requirements, any special or unique safety or chemical hazard conditions associated with the test, and the test requirements specified in this document.
b. Section 2 - Quality Assurance (QA) Plan. Determine the quality assurance requirements and describe how they are met, including instrumentation (calibration and accuracy), confirmation of test item identification, test record information (date, performer, results, corrective actions, etc.), certificatien of test personnel, satisfying of environmental conditions, and establishment of test equipment conditions, data logging, data acquisition systems, and others needed to satisfy test requiiements.
c. Section 3 -Test Procedures. Describe the specific procedures required to perform the test in accordance with test and quality assurance requirements.

3.6.1 Test IInid/ Decision Points. The following hold / decision points shall be established for this program:

a. The Responsible Test Engineer will review and approve the Test Plan and Procedures before

'est initiation.

b. The Responsible Test Engineer (or his appointed iepresentative) will review and approve the test setup, ConfIgttration, and plannCd test Conditions prior to caCh test run.

3.7 hll31ktv Asslirance RcQtlircinents 3.7.1 General Requnements. The organization performing the testing (also referred to herein as the Test Performer) shall have a quality assurance program that is in compliance with the documents referenced in Paragraph 2. The Test Performer shall provide copies of their quality assurance documents upon request of the Test Requestor for review and approval. All discrepancies shall be resolved prior to program start.

3.7.2 Audit Rauiiem ents. The Test Requestor reserves the right to perform an audit to verify that the Test Performc 's quality assurance program is in place and being followed.

3.7.3 Notification. The Test Performer has the responsibility to notify the Responsible Test Engineer with documentation of; (a) any changes in the test procedure, (b) any failure of the test device to meet performance r equirements, (c) any revisions or modifications of the test device, and (d) the dates when tests are expected to be performed Notification < hall be provided at least five working days in advance, whenever possible.

l

h GE Nuclear Energy 23Asooo REV 3 su so. 8 3.7,4 Test Data / Records / Reports. The Test Performer's quality assurance personnel shall review all test data, records, and reports. All test records, analyses and verification records shall be organized by the Test Performer into a Design Record File (DRF).

3.8 Data Transmittal and Reportine Reauirements 3.8.1 Data Transmittal. The Test Performer shall provide the Test Requestor with a copy of all test data, in a format approved by the Responsible Test Engineer.

3.8.2 Reports. A brief Apparent Test Results (ATR) report will be prepared for each test, as defined by the Test Number in Appendices A and B, within one week following performance of the test. A Final Test Report (FFR) will contain the data, analysis and results of all tests and shall be transmitted to the Test Requestor within two months of the completion of testing.

3.8.3 Design Record File. The Test Performer shall submit the test DRF, or a copy, to the Test Requestor within 1 month after completion of the Final Test Report.

3.8.4 Disposition of Test Articles. The Test Performer shall remove the Prototype Condensers from the test facility following the conclusion of the Test Program and return this equipment to the Test Requestor.

4. TEST FACILITY REQUIREMENTS 4.1 Facility Reauirements for the PCC 4.1.1 Principal Functions and Components. The test facility must have a tank simulating the PCC pool in SBWR. A full-size PCC unit will be provided by the Test Requestor to be mounted inside this tank. The facility must be able to supply steam, water and noncondensible gases in quantities and at conditions which are representative of those anticipated for the SBWR PCC. Thermal hydraulic and structural instrumentation will be installed for measuring the parameters ofinterest. The rate of heat transfer from the inlet gas (steam and noncondensibles) to the PCC pool will be determined.

The heat losses from the inlet gas supply lines to the surroundings shall be minimized and shall not exceed 1 MWth. -

Figure 4-1 gives an approximate schematic of the PCC test facility. The principal components of this facility shall be:

A supply of saturated steam.

A supply of noncondensible gases (air or nitrogen and helium).

Condensate drain tank.

Noncondensible vent tank.

PCC pool tank.

Piping and valves.

I l

l

& GE Nuclear Energy 23A6999 REv 3 sn xo. 9 4.1.2 Test Variables. The independent test variables shall be:

PCC inlet pressure.

Inlet. steam flow rate.

Inlet noncondensible flow rate.

The following variables need to be controlled:

Temperature of the inlet steam or steam / gas mixture.

PCC pool level (supply makeup to maintain constant level).

PCC pool temperature (maintain constant).

Condensate tank pressure (maintain equal to PCC inlet pressure).

Condensate tank level (control tank drain flow).

Vent tank level (control tank drain flow).

Dependent variables:

Vent tank pressure or PCC differential pressure.

Condensate flow rate (heat transfer rate).

4.1.3 Comnonent Reauirements.

4.1.3.1 Steam and Noncondensible Gas Supplies. Saturated steam with quality greater than 99.8%

shall be supplied to the PCC at a controllable flow rate for PCC inlet pressure in the range 69 to 689 kPa gage (10 to 100 psig). Available continuous steam flow rate shall be at least 6.5 kg/s (14.3 lb/s) at 689 kPa (100 psig). It is desirable to have available a continuous steam flow rate of 0.75 kg/s (21.5 lb/s) at 6S9 kPa gage (100 psig) (based on 20 MWth).

Noncondensible gases (air or nitrogen and helium) shall be supplied to the PCC at a controllable flow rate for PCC inlet pressure in the range of 69 to 689 kPa gage (10 to 100 psig). Steam / gas mixtures in the range of 0 to 50 noncondensible mass percent are required. Noncondensible mass percent is defined as 100 multiplied by the ratio of the noncondensible mass to the total mass.

The noncondensible gas supplies shall be sized such that the following flow rates can be provided to the PCC:

Air (or nitrogen) 2700 Nm3/h at 69 to 689 kPa gage (1678 SCFM at 10 to 100 psig)

Helium Sufficient to fill the PCC with helium at 6S9 kPa gage (100 psig) in 13 minutes.

The flow rates of steam and noncondensible gas shall be controlled using critical flow devices so the flow rates are independent of the PCC inlet pressure. The flow rates can be controlled either by variation of the stagnation pressure or the critical flow area or a combination. Provision shall be made to control the temperatme of the steam or steam / gas mixture at the PCC inlet. For steam tests, the inlet steam shall be saturated, or with a specified superheat For tests with a steam / gas mixture, the temperature shall be controllable between saturated and 44 C (80 F) superheated.

h GE Nuclear Energy 23a69ao REv 3 su so. 10 4.1.3.2 PCC Pool Tank. The PCC pool tank shall be a rectangular elevated tank, open to the atmosphere for the purpose of containing the PCC and the water which cools it. The tank shall be covered, and shall have an opening of 2 m2 (21.5 ft2 ) in the wall,250 mm (9.S in) above the pool normal water level, for boil-off. The tank shall be large enough and have provisions for internally attaching, with prototypical mounting hardware, a complete full-scale two-module PCC unit, and prototypical inlet, vent and condensate drain piping. The pool depth shall be sufficient to submerge the PCC to a prototypical water level. The required dimensions of the pool are shown in Figure 4-2.

Systems shall be provided to fill the pool with highly purified water prior to a test, to control the tank level and replace boil-off during a test, and to drain the pool for maintenance or modifications to the PCC. The makeup water system shall be sufficient to maintain a constant pool level at the maximum condensation rate for a period of at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Pool boil-off (no moisture canyover) with 15 NIWth heat transfer was calculated to be approximately 6.9x10-3 m3/s (110 gpm). The makeup water shall be the same quality as the pool water. It shall be distributed in the pool such that nonprototypical flow patterns and temperature distributions are avoided.

The water quality requirements for the PCC pool tank are shown in Table 4-5.

4.1.3.3 Condensate Drain Tank. A tank shall be provided for collecting the water condensed and drained from the PCC. The condensate drain tank shall be a closed tank, normally pressurized above atmospheric and partially filled with water. The elevation between the PCC pool tank bottom and the condensate drain tank water level shall be adjustable between 2.0m (6.6ft) and 3.5m (11.5ft). The condensate from the PCC shall discharge to the drain tank beneath the water level. A line shall be provided to drain water fiom the tank during a test to maintain the water lesel at a controlled position. The tank and drain shall be sized such that flooding of the tank is prevented and good conu ol of water level can be maintained during testing with the greatest expected condensate flow rate. The condensate flow rate for 15 hlWth heat transfer at GS9 kPa gage (100 psig) steam inlet pressure was calculated to be S.2x10-3 m3/s (130 gpm).

The condensate drain tank shall be provided with systems to fill the tank to a predetermined level, ,

and to control that level during a test at a constant value by adjusting the rate of tank drain. The  !

tank gas-space during testing shall be maintained at the same pressure as the PCC inlet flow. The method of equalizing pressure with the PCC inlet shall not divert flow from the PCC inlet line. l Figure 4-1 shows one method of controlling condensate tank pressure by injecting high pressure air into the tank and using a pressure control valve on the gas outlet line.

Venting of the gas space in the tank may be necessan for pr essure control or if noncondensible gas is car ried into the PCC drain.

4.1.3.4 Noncondensible Vent Tank. Noncondensible gases, separated in the PCC shall be vented to l a closed tank. The elevation of the highest expected water level in the vent tank should be lower than the lowest expected water level in the condensate drain tank. At some conditions the flow into the vent tank may include uncondensed steam, noncondensible gases and liquid condensate canied over h om the PCC lower plenum. The vent line from the PCC shall terminate in the vent tank. The vent line discharge in the tank shall be arrangco such that testing may be performed with discharge eithei submeiged, as in SBWR or unsubmerged. Pr ovision shall be made to drain water

h GE Nuclear Energy 23Asooo REv 3 su so. 11 from the bottom of the vent tank and to condense steam which may pass through the PCC vent without condensing.

The vent tank shall be provided with systems to fill the tank to a predetermined level, and to maintain that level during a test. Provision shall be made to measure water flow rate from the vent tank drain,in the event that condensate from the PCC is carried over in the vent line.

The vent tank gas discharge pipe shall be provided with a system to control the tank pressure by throttling vent tank exhaust. During tests with no noncondensible inlet flow to the PCC it may be necessaiy to pressurize the vent tank by some means such as injecting air directly into the vent tank as suggested by Figure 4-1. Although the system is shown to control vent tank pressure, the variable used for setting up the desired test conditions will be PCC inlet pressure.

4.1.3.5 Pipintr. The piping for the inlet gases, condensate drain and venting shall be as prototypical as is practical with respect to inside diameter, irreversible hydraulic losses and elevation differences.

The piping external to the PCC pool shall be thermally insulated as necessaiy to:

1. Minimize the heat losses to the surroundings
2. Ensure an accurate measure of the condensing capacity of the PCC.

Routing shall avoid nonprototypical opportunities for steam pocketing. The vent line shall include a gate valve or flanges for a blind orifice to provide capability to physically prevent venting of the l'CC.

i 4.1.4 losu ument llequirements (PCC) '

4.1.4.1 General Remiirements. All test instrumentation shall be provided by the Test Performer ,

and shall be calibrated against standards traceable to the U. S. National Institute of Standards and l Technology or equivalent.

)

l 4.1.4.2 Thermal-Hvdraulic. The required thermal-hydraulic measurements, the required accuracy l and the proposed digital sampling frequency for the PCC are listed in Table 4-1. The required i accuracy in Table 4-1, is given as the "two standard deviation" level of a normally distributed error, ,

i.e. there is a 95% probability that the error does not exceed the specified value. 1 Inside and outside tube wall temperature measurements are required on four tubes at nine axial positions on each tube. The preferred tubes for these measurements are I A,4A,5Q and SQ The location of these tubes in the tube bundle is illustrated in Figure 4-3. The axial locations of the measurements aic shown below:

Location Number 1 2 3 4 5 6 7 8 o Distance Above Tube Centerline (cm) 750 650 550 450 250 50 -150 -150 -750

\

GE Nuclear Energy 23As999 sn so. 12 REv 3 Thermocouples and lead wires shall be installed such that flow disturbances are minimized.

4.1.4.3 Structural. The required structural measurements for the PCC are listed in Table 4-2 and the numbered instrument positions identified in Figure 4-4. The positions are only indicative: the exact locations will be defined by Ansaldo after the stress analysis. See Reference 2.2.c. The two PCC condenser modules are referred to as "A" and "B". Module B is instrumented in only a few positions for comparison with Module A and for confirmation of symmetrical performance. The types of structural measurement required for the PCC are acceleration, displacement, strain, permanent strain and surface temperature.

Acceleration measurements will be made primarily for the purpose of evaluating vibration characteristics and detection of possible condensation / water hammer loads. Piezoelectric accelerometers are recommended for these measurements. The required temperature range is 10 to 177 C (50 to 350 F). The unfiltered signals shall be recorded in analog form with a recorder having a bandwidth of 1 - 500 Hz.

Linear displacement measurements are required at points specified in Table 4-2 with an accuracy of i0.2 mm (0.008 in).

Total strain on the surface shall be determined at the locations and directions specified in Table 4-2. In general, monodirectional strain gages should be used to determ;ne the total strain. At some positions refen cd to in Table 4-2, multiple measurements are specified at the same position.

All strain gages shall be compensated for temperature variations in the range of 10 to 177 C (50 to 350 F) and shall be waterproof.

Peimanent strain shall be measured at the locations and directions specified in Table 4-2, by surface scribe maiks. The distance between scribe maiks will be measured prior of testing, once during the test and at the end of the tests, to determine if there has been any permanent strain.

PCC external surface temperatures shall be measured at the locations shown in Table 4-2 and Figure 4-4 with an accuracy (2 std. dev.) of 3 C (5 F) or beuer. The temperature range is 10 to 177 C (50 to 350*F).

4.2 Facility Requirements for the IC 4.2.1 Principal Functions and Components. A schematic diagram illustrating the essential features of the facility required for testing the IC is shown in Figure 4-5. The principal components of the test facility shall be:

Simulated reactor pressure vessel (RP;').

Steam supply.

Supply of high pressure noncondensible gas (es).

IC pool tank.

Piping and valves.

The test facility must supply steam, water and noncondensible gases in quantities and at conditions which are iepresentative of those anticipated for the SPMR IC

00tLOFF 4 g i I i 0

< > 4- MAKEUP PCC

^ POOL TANK h

-M I DRAIN O

if Q

1f M HEATER On rri T

m VENT a g

u d LINE g

P

__ CRITICAL CRITICAL N

AIR

-- FLOW DEVICE

_-; FLOW DEVICE M> >

p ,, ,,,,

DRAIN PCV L LlNE AIR X X -

CONDENSATE TANK L ----

VENT  :

STEAM SUPPLY NON-CONDENSIBLE G AS SUPPLY TANK [ h$

g@

8 E

FIGURE 4-1. SCIIEMATIC OF PCC TEST FACILITY v.

9 G

e GE Nuclear Energy 23Assoo su so. 14 REV 3 w

L1 t O O O OPENING FOR POOL BOILOFF.

AREA = 2.0 m2 (21.5 ft2)

D 670 mm H

(26.4 in) 5450 mm

\Y

__ (214.6 in)

NWL O f107.3)

> 4650 mm L

(> 183 in) 860 mm ll (33 9 in) 260 mm H1 (9 8 in) 5.8 m (MIN)

(228 inches) 4.4 m (REF) ,

(173 inches)

~

+

H l

FIGURE 4-2. REQUIRED DIMENSIONS FOR PCC TEST POOL

( GE Nuclear Energy 9 0999 su so. 1s

^

/

/ /

'^ \\

8 O  :

8 8  ;

8 8 r 8 8 L O O n 5

N. o o

O

.-O

[-80 0 s 8 8 8 8  ;;

8 8 8

O 8

O 8 8  :

O O '

! i .i.i 9

/i !!!!! ! !\

l;l l!l 54$4$4$4 I FIGURE 4-3. LOCATION OF PCC WALL TEMPER ATURE MEASUREMENTS

h GE Nuclear Energy 2sAs999 REV 3 sn xo.1s 10

- - y ' [ F- - s, l l

[ h, 3 '

, l 10 c

ATJ  :

l l cr4tI.P -

i

4. _ . _ . .__4.p_L.[ .p 4

'\ g,s._

4 l Y" 7 l

l l d

!  ! ~x l b l g l ZVERT f (,3 5 f] f l ] i

[

h(

1 SIMILARLY LOCATED ON UPPER HEADER) n L g

_A W

j, r y

W j -I 8

T i,

l'N -

UNIT B UNIT A NOTE: NUMBERS REFER TO INSTRUMENTS LISTED IN TABLE 4 c FIGURE 4-4. PCC STRUCTURAL INSTRUMENTATION

4 h GE Nuclear Energy 23A6999 REv 3 sn x0. 17 Table 4-1. IEQUIRED THERMAL HYDRAULIC MEASUREMENTS-PCC TEST Accuracy Frequency (2 Std. (samples Measurement Units Expected Range Dev.) per sec)

Pressures:

noncondensible gas inlet, kPa gage (psig) 0-760 (0-110) 2%* 0.1 steam inlet, kPa gage (psig) 0-760 (0-110) 2% 0.1 PCC inlet, kPa gage (psig) 30- 690 (5-100) 2% 0.1 condensate tank gas space, kPa gage (psig)30-690 (5-100) 2% 0.1 PCC upper plenum, kPa gage (psig)30-690 (5-100) 2% 0.1 vent tank gas space, kPa gage (psig) 30- 690 (5-100) 2% 0.1 Differential pressures:

condensate tank / vent tank, kPa (psi) 0-30 (0-5) 2% 0.1 upper plenum / lower plenum, kPa (psi) 0-30 (0-5) 2% 1 condensate tank / upper plenum, kPa (psi) 0 -30 (0-5) 2% 1 Flow rates:

steam inlet, kg/s (Ib/s) 0-12 (0-25) 2% 0.1 noncondensible inlet, kg/s (Ib/s) 0 - 3 (0 - 5) 2% 0.1 condensate, kg/s (lb/s) 0-12 (0-25) 2% 0.1 vent line gas, kg/s (Ib/s) 0 - 3 (0 - 5) 2% 0.1 pool makeup, 1/s (gpm) 0-13 (0-200) 2% 0.1 Temperatures:

steam inlet, deg C (deg F) 100-177 (212-350) 3 (5) 0.1 noncondensibic gas inlet, deg C (deg F) 100-177 (212-350) 3 (5) 0.1 upper plenum, deg C (deg F) 100- 171 (212-340) 3 (5) 0.1 PCC inlet dry bulb, deg C (deg F) 100-171 (212-340) 3 (5) 0.1 lower plenum, deg C (deg F)10-171 (50-340) 3 (5) 0.1 drain line, deg C (deg F)10-171 (50-340) drain tank, 3 (5) 0.1 deg C (deg F)10-171 (50-340) 3 (5) 0.1 vent line dry bulb, deg C (deg F)10-171 (50-340) 3 (5) 0.1 vent tank, deg C (deg F)10-171 (50-340) 3 (5) 0.1 PCC pool (6 places), deg C (deg F)10-100 (50-212) 3 (5) 0.1 tube wall (inside & outside) deg C (deg F)82-171 (180-340) 3 (5) 0.1 pool makeup water, deg C (deg F)10-100 (50-212) 3 (5) 0.1 Water levels (collapsed):

PCC pool, m (ft) 3.5-5.0 (11.5-16.4) 0.03 (0.1) 0.1 drain tank. m (ft) 0 - 6.5 (0- 21.2) 0.03 (0.1) 0.1 drain line m (ft) 0-6.0 (0-19.7) vent tank, 0.03 (0.1) 0.1 m (ft) 0 - 6.5 (0 - 21.3) 0.03 (0.1) 0.1 lower plenum m (ft) 0 - 3.0 (0 - 9.8) 0.03 (0.1) 0.1 Other (indir ect):

heat s ejection rate, MWth 0-15 0.3 0.02 system heat losses, MWth 0 - 0.5 0.05

  • 0.02

- % means percent of full-scale l

h GE Nuclear Energy 23AGogo REv 3 snxo.18 Table 4-2. REQUIRED STRUCTURAL MEASUREMENTS-PCC TEST Module A Quantity Position No. of at each Total Measurement / Location Number Positions Position Meas. Direct Notes Acceleration:

steam distributor 10 1 3 3 X,Y,Z mid-length of tube 5 5 2 10 X, Y upper header cover 11 1 3 3 X,Y,Z Displacement:

inlet /headerjunction 3 1 2 2 X,Z note 1 steam distributor 10 1 1 1 Z note 1 lower header support 12 2 1 2 Y Total Strain: note 8 inlet elbow 2 1 2 2 axial note 1 inlet /headerjunction 3 1 ') ') Z note I upper header /tubejunction 4 5 1 or 2 7 Z notes 1,4 tube / lower headerjunction 6 3 1 3 Z notes 1,3 lower header 7 ') ') 4 X, Y note 1 lower header cover 9 1 ') " Z, X note 1 upper header 1 2 4 8 X , 7. notes 1,5 upper header cover 11 1 4 4 X, Z notes 1,5 upper header cover bolts 13 3 1 or 2 5 Y notes 1,6 lower header cover bolts 14 3 1 or 2 5 Y notes 1,6 drain / lower headerjunction 8 ') " X, Z 1 note I lower header supports 12 1 " "

Z note 1 Pelluanent Strain; inlet /headerjunction 3 1 1 1 7.

upper header /tubejunction 5 3 1 3 Z note 3 lower header /drainjiinction S 1 ') "

Z Temperature:

steam line 2 1 1 1 notes 1,2 Instrument positions are illustrated on Figure 4-4.

Notes:

1. The sampling intenal shall be 15 sec. during steady-state.

2.

Instrument elevation shall correspond to the normal water level of the pool.

3. Tubes c, e, f
4. Tubes / quantity: a/1, b/2, c/2, c/1, f/1
5. Two instrument inside, two outside
6. Three bolts at 120,2 with two instruments, I with one instrument.
7. One instrument inside, one outside.

S.

Ifit's not practical to locate the strain gage at ajunction, locate the strain gage near the junction.

h GE Nuclear Energy 23A6999 REV 3 su so. 19 Table 4-2. REQUIRED STRUCTURAL MEASUREMENTS-PCC TEST (Continued)

Module A (Continued)

Quantity Position No. of at each Total Measurement / Location Number Positions Position Meas. Direct Notes Temperature:

inlet /headerjunction 3 1 1 1 note 1 upper header /tubejunction 4 3 1 3 notes 1,3 tube / lower headerjunction 6 3 1 3 notes 1,3 lower header 7 2 1 2 note 1 lower header cover 9 1 1 1 note 1 upper header 1 ') ') 4 notes 1,7 upper header cover 11 1 2 2 notes 1,7 drain / lower headerjunction 8 1 1 1 note 1 Instrument positions are illustrated on Figure 4-4.

Notes:

1. The sampling inteival shall be 15 sec. during steady-state.
2. Instrument elevation shall correspond to the normal water level of the pool.
3. Tubes c, e, f
4. Tubes / quantity: a/1, b/2, c/2, c/1, f/ l i Two instrument inside, two outside
6. Thice bolts at 120.2 with two instruments, I with one instrument.
7. One instrument inside, one outside.

Module Il Quantity Position No. of at each Total Measurement / Location Number Positions Position Meas. Direct Notes Temperature:

upper header /tubejunction 4B 3 1 3 notes 1,3 tube / lower headerjunction 611 3 1 3 notes 1,3 lower header 711 2 1 2 note 1 upper header 111 2 1 2 Insu ument positions are illustrated on Figure 4-4.

Notes:

i

1. The sampling inteival shall be 15 sec. during steady-state. '

2.

Module 11is used for dual module PCC tests only. Position ntunbers coirespond to Module A positions with the same number without the letter suffix.

3. Tubes c, e and f.

l l

h GE Nuclear Energy 23A6999 REV 3 su so. 20 4.2.2 Test Variables. The independent test variables are:

Drain valve position (open or closed).

IC inlet steam pressure.

Noncondensible gas inlet How rate.

Composition of noncondensible gas.

The following variables shall be controlled:

IC pool tank level (supply makeup to maintain constant level).

IC pool tank temperature.

IC pool water quality.

Steam supply vessel water level.

4.2.3 Component Reanirements 4.2.3.1 Steam and Noncondensible Cases. Saturated dry steam (quality greater than 99.8%) shall be supplied to the IC at a controllable pressure in the range 0.48 to 9.48 hlPa gage (70 to 1375 psig). Available continuous steam now rate shall be at least 14.3 kg/s (31.6 lb/s) at 8.618 SIPa gage (1250 psig) (based on 20 h1Wth).

Provision shall be made for injection of noncondensible gases (nitrogen or air and helium) into the IC stcam supply at a controlled and measured rate. The noncondensible gases will be injected at steam pressures in the range 0.48 to 8.618 h1Pa gage (70 to 1250 psig). The gas supplies shall be sized such that the Isolation Condenser can be Elled with the gas at 8.618 h!Pa gage (1250 psig) in approximately 30 minutes.

The possible need to provide the capability to heat the noncondensible gases or the gas / steam mixture shall be considered.

4.2.3.2 IC Pool Tank. The IC pool tank shall be a rectangular elevated tank, open to the atmosphere, for the urpose g of containing the IC and the water which cools it. The tank shall be large enough and have provision for internally attaching, with prototypical mounting hardware, a full-scale, single-module IC test unit (one-half of a full unit), and prototypical inlet, vent and condensate drain piping. The upper steam header and upper steam pipe transition Etring shall be Exed so as to prevent sliding in the horizontal direction to simulate worst case suppoi conditions.

The pool depth shall be sufEcient to submerge the IC to a prototypical water level. The required dimensions for the IC test pool are shown on Figure 4-6. The pool shall be covered, and shall have an open area for venting pool boiloff. The open area of the vent shall be 1 m2 (10,3 ft2 ),

The IC Pool Tank shall be provided with systems to 011 the pool with highly purined water prior to a test, to replace boiloff and maintain constant water level and temperature during a test. Systems shall be provided to cool the poolinventory between tests and to drain the pool for maintenance or modincations to the IC. The water quality requirements for the IC pool are shown in Table 4-5.

h GE Nuclear Energy 23A6ago REV 3 sn xo. 21 The makeup water system shall be sufficient to replace pool boiloff and water entrained with the steam and to maintain a constant pool level at the maximum condensation rate for a period of at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Pool boiloff (no carryover) with 20 MWth heat transfer was calculated to be approximately 9.3x10-3 m3 s/ (147 gpm). The makeup water shall be the same quality as the pool water. It shall be distributed in the pool such that non-prototypical flow patterns and temperature distributions are avoided.

The pool cooling system shall provide for control of pool heatup and cooldown rates typical of SBWR to adequately simulate the design thermal cycles.

4.2.3.3 Simulated RPV. A pressure vessel shall be provided to simulate the reactor pressure vessel (RPV) and supply saturated steam to the IC. The vessel shall be partially filled with saturated water and the steam supply to the IC shall be taken from above the water level and the condensate from the IC shall be returned to the vessel below the water level. The vessel shall be heated with a source sufficient to maintain vessel pressure with maximum heat rejection by the IC.

4.2.3.4 Pipine and Valves. The piping for the IC inlet steam, condensate drain and venting shall be as prototypical as is practical with respect to inside diameter, irreversible hydraulic losses and elevation differences. The piping shall be thermally insulated and routing shall avoid nonprototypical opportunities for steam pocketing.

The condensate drain line shall have a valve for startup of the IC. The valve shall meet the leakage (through the valve) and opening time requirements of SBWR IC valve (see document reference in Paragraph 2.1 h.) A valve size as small as 102mm (4-inch) may be used provided the total IC loop in eversible hydraulic losses (piping, elbows, valves and condenser) do not exceed 6.3 psi at the maximum flow rate (Reference document 2.1 a, note 5). The valve and operator shall be supplied by SIET. The condensate drain line shall include a loop seal of at least 0.5 m (20 inches) elevation at the return to the simulated RPV.

The condensate drain line shall have a bypass line around the drain valve. The bypass line shall include a small valve (approximately 20mm ( 3/4-inch)) for simulating drain valve leakage.

The steam supply pipe and the condensate return pipe shall be designed to produce a stress in bending which corresponds to the maximum allowable pipe bending stress of 1.5 Sm which is caused by combined mechanical, seismic, and thermal expansion loads at S.618 MPa gage (1250 psig),302 C (575 F). Direction of deflection shall be selected to maximi 7.e the resultant suess on the piping and nozzles between the transition fittings and headers.

As an alternative, guides or lugs may be provided at the lower end of these pipes, at locations to be defined by Ansaldo. If this alternative is selected, the Test Performer shall define the load and moment on the steam supply and condensate drain pipe connections that results from the test facility piping arrangement.

4.2.3.5 Vent 1.ines. Vent lines shall be provided on the IC from both the upper and lower plenum.

Each line shall be manually controlled by a normally-closed, fail-closed solenoid valve and shall have a 12.7 nun (1/2-inch) flow restricting oiifice to limit the venting rate as in SBWR. Provision shall be made for measuring the vohune of gas vented from the IC.

1

h GE Nuclear Energy 23a6999 REv 3 su so. 22 It is expected that noncondensible gases injected into the inlet steam will separate in the IC and eventually fill the upper and/or lower IC plenum, and reduce the heat removal capability. The vent lines shall be used, as described in Paragraph 6.2.1, during tests to remove the noncondensible gases from the IC and restore capacity. The vent lines shall be actuated by manual opening of the solenoid valves. It is desired to manually simulate the automatic venting scheme of the SBWR IC system during some tests (See Reference document 2.1.c.).

4.2.3.6 Elbow Flow Meters. Two horizontal cibows in both the steam supply line and the condensate drain line shall be equipped for use as elbow flow meters. These devices represent the elbow meters used in the SBWR IC system and are not intended to be used for flow measurement in the IC tests. For the SBWR IC system, the elbow flow meters will provide a signal to indicate the occurrence of a break in the IC inlet or condensate drain lines. Their purpose in the SIET test is to provide a measurement of the "IC startup transient" operating signal and noise levels.

One elbow on each of the two lines shall be the same pipe diameter as used in the SBWR IC and the other shall have approximately half of the flow area of the SBWR IC elbow meters. Ninety-degree, long radius (R/d = 1.5), cibows shall be used and the pressure taps shall be in the outer and inner circumferences of the elbow midplanc,45 degrees from the inlet end. The pressure tap holes shall be 6 mm (0.236 in) in diameter. There must be no burrs, wire edges or other irregularities on the inside of the pipe at the nipple connection or along the edge of the hole through the pipe wall.

The diameter of the hole should not decrease within a distance of 12 nun (0.472 in) from the inner surface of the pipe but may be increased within a lesser distance.

Where the pressure hole breaks through the inner surface of the pipe there must be no roughness, burrs nor wire edge. The edge of the hole may be left truly square or may be dulled (rounded) very slightly.

Connections to the pressure holes should be made by nipples, couplings, or adapters welded to the outside of the pipe. It is important that no part of any such fitting projects beyond the inner surface of the pipe.

It is desirable that the velocity profile of the fluid stream entering the elbow be fairly uniform and free of swirls. The recommendations of the document referenced in Paragraph 2.3.b regarding straight lengths of pipe upstream and downstream of the elbows shall be followed as much as possible. Condensation pots shall be used on the pressure tap lines if necessary to keep the line full of water.

4.2.4 Instrumentation Re_quirements (IC) 4.2.4.1 General Requiicments. All test instrumentation shall be provided by the Test Performer and shall be calibrated against standards traceable to the U. S. National Institute of Standards and Technology or equivalent.

4.2.4.2 Thermal-livdraulic. The required thermal hydraulic measurements, the required accuracy and the proposed digital sampling frequency for the IC are listed in Table 4-3. The required accuracy in Table 4-3, is given as the "two standard deviation" level of "normally" distributed error, i.e. there is a 95G probability that the error does not exceed the specified value.

1 l

h GE Nuclear Energy 23Acovo REv 3 su m 23 Temperature, steam flow, condensate flow and pressure instruments shall be provided to monitor the heatup and cooldown rates of the coolant and the heat transfer from the condenser during the thermal cycle conditions to be tested.

Temperature measurements shall be made on the vertical section of steam pipe which connects to the steam header below pool water level. The purpose of this measurement is to detect condensate return valve or IC unit leakage when the IC is in the hot standby (fully pressurized) non-operating mode with the condensate return valves closed. Six temperature elements shall be located on the outside of the steam pipe spaced at 0.lm (3.9-inch). The upper element shall be at the pool normal water level elevation.

4.2.4.3 Structural. The required structural measurements for the IC are listed in Table 4-4 and the numbered instrument positions identified in Figure 4-7. The positions are only indicative: the exact locations will be defmed by Ansaldo after the stress analysis of the IC. See reference 2 2.c. The types l

of str uctural measurement required for the IC are acceleration, displacement, strain, surface temperature and surface scribe marks for measurement of permanent strain.

Acceleration measurements will be made primarily for the purpose of evaluating vibration characteristics and detection of possible condensation / water hammer loads. Pie /.oelectric accelerometers are iecommended for thes< measurements. The required temperature range is 10 to 314 C (50 to 598 F).

Linear displacement measurement is iequired at points speciGed in Table 4-4 with an accuracy of 40.2 mm (0.00S in).

Total strain on the surface shall be determined at the lccations and directions speciGed in Table 4-4. In general, monodirectional strain gage should be used to determine the total strain. At some '

positions referred to in Table 4-1, multiple measurements aie specined at the same position. All strain gage.s shall be compensated for temperature variations in the range of 10 to 314 C (50 to l 598"F) and shall be waterproof.

IC external surface temperatmes shall be measured at the locations shown in Table 4-4 and Figure I

4-7 with an accuracy (2 std. dev.) of 3 C (5 F) or better. The temperature range is 10 to 314 C (50 to 59S*F).

Permanent strain shall be measured at the locations and directions specified in Table 4-1 by surface sciibe marks. The distance between sciibe mar ks will be measm ed prior of testing, once during the test and at the end of the tests, to determine if there has been any permanent strain.

4.3 I)ata Recm dinglenoirements (PCC and IC Tests) 4.3.1 Data Acquisition. A digital data acquisition system, of adequate capacity to monitor and s ecord all specified measm ements, shall be supplied by the Test Performer. The measurements shall be recorded,in digital format, on magnetic tape or disk for later calculation and analysis of test icsults. Sampling frequency for each measurement shall be adjustable. Preliminary sampling freqluency icquirements are shown on Tables +1 through 4-1, but values may be aanged prior to testmg l

l

________ _ . - . - _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ - _ - _ _ _ - _ _ - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - -----J

- as 9

UO:STURE --

^^

SEPARATOR Y '

10 POOL POOL MAKEUP __

g V

COCLER

.s n VENT L!NES g

v =

_ Ak N D

STEAM FILL Q Sfs"S To ic y , y V @

JL VALVE jg l

l l l CONDENSATE CRAIN f

DRAIN I I I

~ l LOOP SEAL 1 1 1 { (0.5 m) l no STEAM SUPPLY t.c G AS VOLUME MEASUREMENT WC h

HIGH PRESSURE NON-CONDENSIBLE GAS FIGURE 4-5. SCIIEMATIC OF IC TEST FACILITY ,,,

2

GE Nuclear Energy 2sAsooo su so. 25 REv 3 w

L1

[ ) f O

L t

O 920 mm H

(36.2 in)

- k -

903 mm 0

(35.6 in)

~~

50 D 3520-+mm 0 w

(138.5 + 2 in) t > 4802 mm

(> 189 in)

_ NW1.

x.m hh

+

5 8 m (M N)

(228 inches) 4 4 m (REF)

(173 inches)

+1 H

FIGURE 1-6. REQUIRED DIMENSIONS FOR 1C TEST POOL

( GE Nuclear Energy 23A6999 su so. 26 REV 3 -

I -

D( '\

h a p-3 h '

! n.g W ,,

j.....___._ ~__.. p.

>  ?

l g _ _

.i A

A A t 1 3o e l

0',.

l K f ;%L/ ,  ;

'}. % (- K+ f)

V s

Q

\

m - n x __^ -

1 s

\ l

/

c h/ y m

--+ X

/

Z VERT g,.j;.q;,, b

^ 't . i

\

3_>

AA FIGURE 4-7. IC STRUCTURAL INSTRUMENTATION

h GE Nuclear Energy 23A6999 REV 3 sH.No. 27 Table 4-3. REQUIRED THERMAL HYDRAULIC MEASUREMENTS-IC TEST Accuracy Frequency (2 Std. (samples Measurement Units Expected Range Dev.) per sec)

Pressures:

steam vessel, MPa gage (psig) 0.4-10.34 (70-1500) 2%* 0.1 IC inlet, MPa gage (psig) 0.4-10.34 (70-1500) 2% 0.1 IC upper plenum, MPa gage (psig) 0.4-10.34 (70-1500) 2% 0.1 Differential pressur es:

IC inlet /IC vent line, kPa (psi) 0 - 69 (0-10) 2% 0.1 IC inlet /IC drain line, kPa (psi) 0 - 69 (0-10) 2% 0.1 upper plenum / lower kPa (psi) 0 - 69 (0 -10) 2% 0.1 plenum, elbow meter taps (4), kPa (psi) 0 - ? (0 - ?) 2% 0.1 Flow rates:

steam inlet, kg/s (lb/s) 0 - 16 (0- 35) 2% 0.1 noncondensible inlet, kg/s (lb/s) 0 - 0.3 (0 - 0.5) 2% 0.1 IC pool makeup, 1/s (gpm) 0-11.4 (0-180) 5% 0.1 Temperatures:

IC inlet steam, deg C (deg F) 157-314 (315-59S) 3 (5) 0.1 IC inlet pipe (6), (leak det.) deg C (deg F) 100-314 (212-598) 3 (5) 0.1 drain line, deg C (deg F)10-314 (50-598) 3 (5) 0.1 vent lines (2), deg C (deg F)10-314 (50-598) 3 (5) 0.1 steam vessel, deg C (deg F)65-314 (150-59S) 3 (5) 0.1 IC pool (12 places), deg C (deg F)10-104 (50-220) 3 (5) 0.1 pool makeup water, deg C (deg F) 10 104 (50-220) 3 (5) 0.1 pool outlet temperature, deg C (deg F)10-104 (50-220) 3 (5) 0.1 tubes (3 @ 5 axial locations), deg C (deg F)10-314 (50-598) 3 (5) 0.1 Water levels (collapsed):

IC pool, m (f t) 3.5 - 5.5 (l 1.5 - 1 S.0) 0.03 (0.1) 0.1 simulated RPV, m (ft) later (later) 0.03 (0.1) 0.1 drain line, m (ft) later (later) 0.03 (0.1) 0.1 vent lines (2), m (f t) later (later) 0.03 (0.1) 0.1 Other (indirect):

IC heat rejection rate, M Wth 0-20 01 0.02 system heat loss, MWth 0-1 0.1 0.02

- % means percent of full-scale

h GE Nuclear Energy 23A6999 REV 3 su so. es Table 4-4. REQUIRED STRUCTURAL MEASUREMENTS-IC TEST Quantity Position No. of at each Total Measurement / Location Number Positior.s Position Meas. Dir. Notes Acceleration:

mid-length of tube 5 5 2 10 X,Y note 2 drain line curve 9 1 3 3 X,Y,Z lower header cover 16 1 1 1 Z upper header cover 2 1 3 3 X,Y,Z Displacement:

Steam distributor 1 1 1 1 Z note 1 drain / lower headerjunction 8 1 1 1 Z note 1 steam pipe lower zone 13 1 1 1 Z note 1 Total Strain:

inlet / upper headerjunction 3 1 6 6 X,Y,Z notes 1,3 upper header /tubejunction 4 5 1 or 2 7 Z notes 1,2,8 mid-length of tube 5 3 1 3 circ. notes 1,4 tube / lower headerjunction 6 3 1 3 Z notes 1,4 lower header 7 9 9 4 X,Y note 1 lower header cover 16 1 9 9 X,Z note I upper header 15 2 4 S X,Y notes 1,5 upper header cover 2 1 4 4 X,Z notes 1,5 drain / lower headerjunction S 1 4 4 X,Z note I drain line cune 9 1 9 9 Y note 1 drain line/ drain tube 10 1 4 4 X note 1 upper header cover bolts 11 3 2 or 1 5 Y notes 1,6 lower header cover bolts 14 3 2 or 1 5 Y notes 1,6 guard pipe / distributor 12 1 3 3 X,7. notes 1,7 support 17 1 9 9 X,45 note I upper header near support 18 1 4 4 X,Y notes 1,5 Instrument positions are illustrated on Figure 4-7.

Notes:

1. The sampling interval shall be 1 sec. during transients,1 minute during steady-state.
2. Tubes a, b, c, e, f.
3. Three instruments above normal water level, three below.
4. Tubes c, e, f.
5. Two instruments inside, two outside.
6. Three bolts at 120,2 with two instruments, I with one.
7. Two in Z direction, one in X.

S. Two instruments on tubes b and c, one on tubes a, e, f.

9. Near level of pool water.
10. One instrument inside, one outside.

h GE Nuclear Energy 23A6999 REV 3 su so. 29 Table 44. REQUIRED STRUCTURAL MEASUREMENTS-IC TEST (Continued)

Quantity Position No. of at each Total l Measurement / Location Number Positions Posidon Meas. Dir. Notes i Permanent Strain:

inlet / upper headerjunction 3 1 3 3 Y,Z,45 note 9 condensing tube bend 4 3 1 3 Z note 4 drain / lower headerjunction 8 1 1 1 2 Temperature:

guard pipe / distributor 12 1 1 1 note 1 inlet pipe / upper header 3 2 2 4 notes 1,5 upper header /tubejunction 4 3 1 3 notes 1,2 tube / lower headerjunction 6 3 1 3 notes 1,4 lo'wer header 7 2 1 2 note 1 upper header 15 2 2 4 notes 1,2 drain line bend 9 1 1 1 note 1 upper header cover 2 1 9 ') notes 1,10 lower header cover 16 1 1 1 note 1 Instrument positions are illustrated on Figure 4-7.

Table 4-5. WATER QUALITY REQUIREMENTS Water Quality Parameter Requirement Chloride (ppb) < 20.0 Sulf ate (ppb) < 20.0 Silica (ppb as SiO2) < 1000 Conductivity at 25"C (77 F), (micro S/cm) < l.2 pil at 25 C (77 F) min - 5.6 max - S.6 Corrosion Product Metals (ppb)

Fe insoluble I < 20.0 Soluble Cu Total < l.0 All Other Metals < 9.0 Sum < 30.0

h GE Nuclear Energy 23A6999 REV 3 siiNo. 30 The unfiltered accelerometer signals shall be recorded in analog form with a recorder having a bandwidth of 1 - 500 Hz.

Physical measurements such as scribe mark distances and other NDE measurements not recordable in magnetic format will be recorded in writing on data sheets to be prepared by the Test Performer as part of the Test Plan and Procedures document.

4.3.2 Test Obsenations. Qualitative obsenations of test conditions such as leakage of steam or water, discoloration of materials, erosion or corrosion of parts, etc. shall be noted for each test.

These obsenations shall be recorded in a log book. The entries will be reviewed for appropriate action by the Responsible Test Engineer.

5. PASSIVE CONTAINMENT CONDENSER TESTS 5.1 General Test Procedures 5.1.1 Specific Test Objectives. The general objectives of the PCC test (Paragraph 3.1) can be accomplished by means of the following specific objectives.

5.1.1.1 Thermal-Hvdraulic

a. Measure the steady-state heat removal capability over the expected range of SBWR conditions:

inlet pressure concentration of noncondensible gases PCC differential pressure pool-side bulk average water temperature pool-side water level

b. Confirm that when a mixture of steam and noncondensible gases flows into the PCC, the uncondensed gases will be discharged from the vent line and the condensate will be discharged from the drain kne. '

1 1

c. Confirm that heat transfer and flow rates are stable and without large fluctuations.  !
d. Confirm that there is no condensation water hammer during the expected startup, shutdown and operating modes of the PCC.
c. Measure the inside and outside wall temperatures at " typical" tube locations to:
i. Provide diagnostic information for the investigation of unexpected condenser performa n ce.

l ii. Confirm the understanding of tubeside performance gained from other test programs. I iii. Provide a f undamental data base for confirmation of TRACG simulation of poolside perfor ma n ce.

h GE Nuclear Energy asA6999 REV s su so. s1 5.1.1.2 Structural

a. Confirm that the stress levels at criticallocations on the PCC do not exceed design values for the following conditions:
i. Standby operation at normal containment pressure, temperature, gas content and relative humidity.

ii. Pneumatic leak testing.

iii. Transition from operation at normal containment conditions to LOCA and severe accident conditions.

b. Confirm that cyclic loads at critical locations on the PCC, resuhing from flow and/or condensa-tion induced vibration, do not exceed design values during expected periods of PCC operation.
c. Demonstrate, by performing 5 times the expected number of pressure and thermal cycles that the PCC will successfully survive 60 years of SBWR service.

{ 5.2 PCC Test Strategv. The PCC tests will be a series of steady-state tests at specified steam flow l rate, noncondensible flow rate, inlet gas temperature and inlet pressure (equivalent to dywell).

The condensate tank pressure will be equal to the inlet pressure and the vent tank pressure will be adjusted to obtain the specified PCC inlet pressure. The PCC pool will be maintained at a constant level (full) and equilibrium bulk average temperature during most tests. The PCC will be brought to the specified conditions and allowed to stabilize,i.e. reach a condition of steady-state heat transfer and allowed to operate for approximately 15 minutes at these conditions. Data will be recorded during pool heatup and for the period of steady operation.

The types of PCC tests which are considered to be necessary to achieve the objectives in Paragraph 5.1.1 are listed in Paragraph 5.2.1. Each of these test types is described in more detail in Paragraphs 5.2.2 through 5.2.9. It should be noted that the procedures described in the paragraphs are proposals and not requiiements. The Test Performer may elect to use alternative or modified procedures which accomplish the same objective. The actual test procedures will be part of the Test Plan and Procedures document described in Paragraph s.6.

A matrix of the test conditions required for the PCC is provided in Appendix A.

h GE Nuclear Energy 23A6999 REv 3 su No. 32 5.2.1 Types of Tests Reauired for the PCC. The types of tests to be performed with the PCC have been defined as follows:

A.l.1. Steady state pedormance - saturated steam / air mixtures.

A.l.2. Steady state performance - superheated steam / air mixtures A.l.3. Steady state performance - steam only ,

A.2.1. Effect of pool water level- saturated steam j A.2.2. Effect of pool water level- saturated steam / air mixtures A.3.1. Additional Structural Tests - simulated LOCA pressurization A.3.2. Additional Structural Tests - simulated leak testing 11.1. Deleted 1 B.2. Effect oflow density noncondensibles 5.2.2 Description of Test Tvne A.1.1 Definition: Two Modules, Steady State - Saturated Steam / Air General Test Procedure:

1 Set up selected constant values of air and steam flow rates (ma and ms respectively) according to l procedures determined during shakedown testing. Adjust PCC inlet pressure to maximum value, Pi (max) using vent tank discharge valve. Adjust inlet mixture temperature to saturated condition.

Allow PCC pool water to heat up to steady state bulk average temperature. Trim valve settings to adjust inlet temperature and pressure to prescribed values.

I Record data at approximately 5 inlet pressure values between Pi(max) and Pi(min) or until a specified PCC delta P limit is reached. The delta P limit will be approximately 14 kPa (2 psi), but will be specified by the Responsible Test Engineer prior to the test. liepeat for each selected value of ma and ms. (See sketch below.)

FOR m3 = CONST ap = ap UMIT

/ m3 = m3 (MAX)

N N

m3 (k gJs) Pi (MIN) m 3=CONST Pi (MAX) 1 r, g g g g ms = m3 (M;N)

/

90 090 Pi (k Pa g)

l h GE Nuclear Energy 2sAsoog REv 3 sn so. 33

)

Independent Variables:

1. Pool level- maintain constant at normal level (full).
2. Inlet' gas temperature - set at saturation value corresponding to the inlet pressure and gas  !

mixture or the specified degrees of superheat above saturation.

3. Inlet steam flow rate, ms - see Test Conditions.
4. Inlet air flow rate, ma - see Test Conditions.

l

5. Inlet pressure, Pi- see Test Conditions for range of values.

Test Conditions:

I See Reference Test Slatrix, Appendix A.

5.2.3 Description of Test Tvne A.1.2 Definition : Two N!odules, Steady State - Superheated Steam / Air General Test Procedure: i Procedure is the same as Tests A.l.1. Repeat three of the saturated test conditions from A.l.1, each l at two values of superheat, i.e. six test conditions (each with 5 inlet pressure values). Test conditions l to be repeated are 3,7, and 23. The superheat values are to be determined (TBD) by analysis prior to testing. The Test Recluestor will provide the superheat values to the Test Performer.

Independent Variables:

Same as Tests A.l.l.

Test Conditions: l

{

1 1

See Reference Test Slatrix, Appendix A.

5.2.4 Description of TenTwe A 1.3 l Definition : Two .\lodules, Steady State - Steam Only When the PCC is tested with steam flow only, the performance can be affected by the presence of noncondensible gas trapped in the PCC tubes. Two conditions will be considered for Tests A.I.3: 1.

No air in PCC tubes and,2. Air in PCC tubes.

_ General Test Procedure - No air in PCC tubes:

The spectacle flange in the vent line may or may not be closed for these tests. This will be decided on the basis of the shakedown tests.

h GE Nuclear Energy 23A6999 REV 3 su so. sa Purge all air from the system prior to start of testing. The condenser is now similar to the IC, i.e.

with steam Dow rate as the independent variable, the inlet pressure will adjust to match the capacity of the PCC.

Operate the PCC at the same steam Dow rates used in Test Conditions 1 - 30 (~7 values) and record data. Inlet pressure should not be allowed to increase above 600 kPa (100 psig).

Independent Variables:

1. Pool level- maintain constant at normal level.
2. Inlet gas temperature - adjust as specified in the Test Conditions according to the measured PCC inlet pressure. Values of superheat to be determined (TBD) by analysis prior to testing.
3. Inlet steam now rate - see Test Conditions.
4. Inlet air Dow rate - no air How for these tests.

Test Conditions:

See Reference Test hiatrix, Appendix A.

General Test Procedure - Air in PCC tubes:

Close spectacle flange on vent line. Purge all air from system with steam prior to start of test. Set up the specified saturated steam flow rate and stabilize operation (inlet pressure). Bleed air slowly into inlet line to PCC at a metered rate and record data as inlet pressure increases. Cease testing when pr essure stops increasing or approaches 690 kPa (100 psig).

Independent Variables:

1. Pool level- maintain constant at normal level (full).
2. Inlet gas temperature - adjust to the saturated temperature (or the specified superheat) of the steam at the initial (ptuged) pressure and maintain constant throughout the test.
3. Inlet steam now rate - see Test Conditions.
4. Inlet air now rate - adjust to a rate which will fill the condenser in approximately 15 to 30 minutes at the stabilized inlet pressure.

Test Conditions:

See Reference Test Statrix, Appendix A.

4 h GE Nuclear Energy 23Asooo REV 3 su so. 35 5.2.5 Description of Test Type A.2 Definition: Two Modules, Effect of Pool Water Level General Test Procedure:

These tests will demonstrate, for a limited set of conditions, the effect of pool water level decrease on the performance of the PCC. It is proposed to do this by recording data while slowly lowering pool water level either by allowing the water to boil away without refilling or by slowly draining.

When the low level is reached in the pool, ambient water will be slowly added to refill the pool, while continuing to record the data.

A.2.1 Saturated steam: Purge all air from the system and repeat Test Condition No. 41, allowing the pool water level to decrease to about 50% of normal level or until the inlet pressure reaches approximately 100 psig.

A.2.2 Saturated steam / air mixtures: Repeat Test Conditions 15 and 30, allowing the pool water level to decrease to about 50% of normal level or until the inlct pressure reaches approximately 100 psig. Start with the minimum values ofinlet pressure and maintain vent tank discharge valve position throughout the test.

Independent Variables:

1. Pool level- begin test with normal level (full) and allow to decrease to 50% of normal. Slowly refill and end test with pool again at the normal level.
2. Inlet gas temperature - adjust to saturation value corresponding to the inlet pressure and gas mix tlit e.

i

3. Inlet steam flow rate, ms - see Test Conditions. l
4. Inlet air flow rate, ma - see Test Conditions.
5. Inlet pressure, Pi- see Test Conditions. For Conditions 55 and 56 start at the minimum inlet l pressure determined for Test Conditions 15 and 30 respectively.

Test Conditions:

See Reference Test Matrix, Appendix A.

5.2.6 Description of Test Type A.3 Definition: Two Modules, Additional Structural Tests To confirm the PCC structural design adequacy for the Si!WR design lifetime, the test program must include testing the PCC for at least five times the number of design basis presstu e/ temperature cycles. The performance test includes most of these conditions, except for the LOCA and the pneumatic leak testing.

h GE Nuclear Energy 23Ae999 REV 3 siixo. 36 Definition: A.3.1. Simulated LOCA Pressurizations The design basis is two LOCAs during the sixty year design life of the PCC. For the test,10 simulated LOCA cycles must be performed.

General Test Procedure:

The PCC is to be rapidly pressurized with saturated steam to 379 kPa(g) (55 psig) and 151*C (303 F). The vent tank discharge valve must be partly open during pressurization to purge air from the PCC tubes and permit heating. The total time period for the pressurization and data recorr.ing is approximately 30 minutes. The flow rate of steam rcquired to achieve these conditions can ';e determined either by shakedown testing or from previously run two-module tests. If the steam supply is not large enough to maintain the required pressure with a steam-only inlet flow to the PCC, air flow can be added. Pre-adjustment of the vent tank discharge valve position by " trial and error" may be necessary.

Independent Variables:

1. Pool level - maintain constant at normal level (full).
2. Pool temperature - start with pool at ambient temperature and allow to heat up in response to PCC performance.
3. Inlet gas temperature - adjust to saturated temperature at 379 kPa (g) (55 psig).
4. Inlet steam flow rate - to be determined.
5. Inlet air flow rate - no air flow for these tests unless it is required to achieve the final required pressure.

Test Conditions:

This procedure is to be performed a total of 10 times. The pressurization transient for the PCC must meet the following requirements:

PCC Inlet Pressure Required Time to (kPa (g) (psig) Reach Pressure 175 (25.4) start (l) 249 (36.1) < 30 sec 261 (37.8) < 65 sec 379 (55) < 30 min (1) The unit is initially pressurized with air at ambient conditions.

h GE Nuclear Energy 23A6999 REV 3 su No. 37 Definition: A.3.2. Simulated Pneumatic Leak Test Pressurizations.

The PCC design basis assumes that the unit will be pneumatically pressurized for leak testing 60 times during its design life. Each leak test will consist of closing the inlet, vent and condensate lines and pressurizing the PCC with air to 758 kPa(g) (110 psig). The pressure will be maintained long enough to demonstrate that the PCC does not leak. For the structural test, it is required to simulate five times the number ofload cycles produced by these leak tests.

General Test Procedure:

Close off the inlet, vent and condensate lines as necessary to permit pressurization with air to 758 kPa(g) (110 psig). Pressurize with air to the required pressure, hold pressure for approximately 1-2 minutes and release pressure. The unit may be partially filled with water to reduce the time required for pressurizing. The PCC should be checked for leaks by verifying the absence of air bubbles in the pool approximately once for each fifty cycles.

Independent Variables:

1. Pool level- maintain constant at not mal level (full).
2. Pool temperature - ambient.
3. Inlet gas temperature -less than 60 C (140 F).
4. Inlet steam flow rate - none required.
5. Inlet air flow rate - sufficient to perform approximately 8 cycles per hour.

Test Conditions:

Perform 300 of these test cycles.

5.2.7 Deleted 5.2.8 Deleted 5.2.9 Description of Test Type It2 Definition : Effect of Low Density Noncondensibles General Test Procedme:

Perform tests similar to the two module tests, A.l.3, part 2., except using helium and helium / air mixtur es in place of air.

Close spectacle flange on PCC vent line. Purge all air from system with steam prior to start of test.

Set up saturated steam flow rate and stabilize operation (inlet pressure). Bleed the noncondensible gas slowly into inlet line to PCC at a meter ed rate and record data as inlet pressure increases. Cease testing when pressure levels out or approaches 100 psig.

h GE Nuclear Energy 23Assoo REv 3 su so. 38 1

Independent Variables:

1. Pool level- maintain constant at normal level (full).
2. Inlet gas temperature - adjust to the saturated temperature of the steam at the initial (purged) pressure and maintain constant throughout the test.
3. Inlet steam flow rate - see Test Conditions.
4. Inlet air flow rate - see Test Conditions.
5. Inlet helium flow rate - adjust to a rate which will fill the condenser in approximately 15 to 30 minutes.

Test Conditions:

See Reference Test Matrix, Appendix A.

5.3 Data Processine/Analvsis General Reauirements. The processing and analysis of the recorded test data shall be done by the Test Performer in three steps which are described as " quick look",

" preview" and " full processing and analysis", Equipment and software necessay for the specified data processing shall be provided by the Test Performer.

The Test Performer shall prepare a plan for verification of the accuracy of all data acquisition and data reduction software. This plan shall be approved by the Test Requestor and verification shall be completed by the Test Performer prior to the start of testing.

The objective of the " quick look"is to provide all of the information needed to proceed with the preparation for the next test. This shall consist primarily of verification that the objectives of the test run weic achieved, idemitication of any instruments which may have failed or performed incorrectly during the test, and reviewing structural data to insure the integrity of the condenser for the next test. The goalis to complete this phase of the data reduction within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the completion of a test. -

The " preview" phase has the purposes of providing representative results from the most significant measurements to be used in the " Apparent Test Results" report, specified in Section 3.7.2, and to aid in defining the details of the remainder of the analysis. It may be that the most convenient way to do this analysis is interactively with the data reduction computer. Time history plots of key parameters shall be prepared and examined to determine time periods of significant interest for moic detailed analysis. Summarv plots and digital data tables of typical performance shall be prepared. Time periods and parameters of most significance shall be selected for processing during the " full pr ocessing and analysis" phase. The " preview"is expected to be completed within 2 to 4 days following the test.

The plots and tables for the Final Test Report, specified in Section 3.7.2, will be generated during the " full processing and analysis" phase to be completed within approximately two inonths after the test. The purpose of this phase is to organize the data in a form that provides an integrated

h GE Nuclear Energy usasoog REV 3 su so. so interpretation of the test results to show the performance of the condenser and demonstrate that the test objectives have been achieved.

The follmying general data reduction software capabilities shall be available:

Conversion of all recorded signals to digital values in engineering units. Units shall be as defined in the SBWR Composite Specification referenced in Paragraph 2.1.g.

Print tables of digital values of recorded signals in engineering units for selected time periods.

Calculate and prepare tables of mean, standard deviation, minimum and maximum value of all measurements (in engineering units) during a specified time period.

Plot graphs of any selected test variable as a function of time (time histog) for any selected test time window. Be able to plot groups of 1 to 6 test variables on a single graph.

Spectral analysis for determination of the primag frequencies present in the accelerometer, strain gage, and possibly some pressure signals.

6. ISOIATION CONDENSER TESTS 6.1 General Test Procedures 6.1.1 Specinc Test Obiectives. The general objectives of the IC test (Paragraph 3.2) can be accomplished by means of the following specific objectives.

6.1.1.1 Thermal livdraulic a.

.\leasure the steady-state heat removal capability over the expected range of the following SBWR conditions:

steam piessure concentration of noncondensible gases pool. side bulk average water temperature pool-side water level

b. Confirm that tube-side heat transfer and flow rates are stable and without large fluctuations.

c.

Confirm that the vent line(s) and the venting strategy for pmging noncondensible gases i perform as requir ed during IC operation.

l

d. Confirm that the condensate a cturn line performs its function as required during steady state and u ansient operation and that water level oscillations and condensation induced flow '

os T : ions do not impair heat iemoval capacity,

c. .\leasure the heat loss from the IC when it is in the standby mode, with the condensate drain valves closed, l l

h GE Nuclear Energy 23a6999 REV 3 su so. 40

f. Measure the " drain time" for the IC upper plenum during the IC startup transient.

6.1.1.2 Structural

a. Demonstrate, using, when possible, prototypical NDE testing methods, that a specified fraction of the required IC thermal cycles, together with unexpected load cycling, results in no excessive deformation, crack initiation or excessive crack growth rate. (The Test Requestor will provide the NDE testing ofIC.)
b. Confirm that the stress levels at critical locations on the IC do not exceed design values for the following conditions:
i. Reactor heatup from a cold condition to saturation temperature at reactor operating pressure (IC hot standby) and subsequent cooldown, with the IC condensate return valves closed (i.e., IC does not operate).

ii. Isolation condenser startup and operation following a rapid increase from reactor normal operating pressure, and subsequent shutdown of the IC and return to standby at a reduced pressure.

iii. Periods ofIC operation (on the order of two hours) with constant steam conditions inside the tubes and low temperature (ambient rising to 100 C (212 F)) water on the outside,

c. Confirm that cyclic stress levels at critical locations on the IC, resulting from flow and/or condensation induced vibration, do not exceed design values during expected periods of IC operation.

6.1.1.3 In Service inspection. Confirm the adequacy of proposed In Service Inspection (ISI) procedures and methods by performing NDE tests prior to thermal-hydraulic testing and after testing has been completed.

6.1.1.4 Leak Detection Niethods. Record reference data for use in evaluation of proposed methods for IC system leak / break detection.

a. Measure and record the dynamic differential pressure signal from clbow flow meters in the steam supply and condensate return lines during the IC startup transient and at standby and normal operating conditions.
b. Measure the temperature distribution in the IC inlet pipe with a simulated leak in the IC or IC condensate drain line.

6.2 Jicquired Test Conditions. The IC tests will essentially be representative of the cyclic duty expected of the isolation condenser as used in the SBWR. The test will include cycles equivalent to approximately one-third of the design lifetime of the IC,i.e. 20 years of operation. Each isolation condenser test will consist of a cycle corresponding to one of five basic types. The five cycle types are described below and illustrated in Figure 6-1.

GE Nuclear Energy 2sA6999 su so. al REv 3 During one Type 1 cycle, early in the testing, determine the system heat losses and measure inlet pipe temperature distribution with condensate drain valve bypass line open.

A reference matrix of test conditions for the IC is presented in Appendix B. This matrix is intended for use in designing the test facility and planning the test program but the final test conditions will be specified in the Test Plan and Procedures document and may differ from those shown in Appendix B.

6.2.1 Descrinti6n of Basic Test Cvcles Initial Conditions for All Cvele Types:

The condensate drain valve is closed and the IC is filled with water. The IC pool shall be full and the initial water temperature at the specified value.

Type 1 " Normal" IC Operation:

1. Heat up and pressurize with steam from ambient to pressure Pl at a rate of approximately 56 C (100 F) per hour.
2. Allow the system to stabilize at P1 and then open condensate drain valve.
3. As condensation reduces the inlet pressure, increase the inlet steam flow rate as necessaiy to stabilize the condenser inlet pressure at P2. If the specified value of P2 cannot be sustained at the maximum steam flow rate (20.\lW), then perform the test at the maximum sustainable pressure below P2.
4. Continue steady condenser operation at these conditions for a period of time, T2.
5. At the end of the time period, T2, depressurize and cool down the system at approximately 56 C (100 F) per hour.

Tvpc 2 " Normal"IC Operation + Performance Data:

1.

Heat up and pressurize with steam from ambient to pressure Pl at a rate of approximately 56 C (100 F) per hour.

2. Allow the system to stabilize at P1 and then open condensate drain valve.

3.

As condensation reduces the inlet pressure, increase the inlet steam flow rate as necessaiy to stabilize the condenser inlet pressure at P2. If the specified value of P2 cannot be sustained at the maximum steam flow rate (20.\lW), then perform the test at the maximum sustainable pressure below P2.

4. Continue steadv condenser operation at these conditions for a period of time, T2.

5 Reduce the inlet pressuie to P3, at approximately 56 C (100 F) per hour and stabilize.

h GE Nuclear Energy 23A6999 REV 3 su so. 42

6. Maintain condenser operation at pressure P3 for a time period T3, long enough to record steady-state pedormance data.
7. At the end of the time period T3, depressurize and cool down the system at approximately 56 C (100 F) per hour.

Tvne 3 " Normal"IC Operation + Noncondensible Gas Effects:

1. Heat up and pressurize with steam from ambient to pressure P1 at a rate of approximately 56*C (100 F) per hour.
2. Allow the system to stabilize at P1 and then open condensate drain valve.
3. As condensation reduces the inlet pressure, increase the inlet steam flow rate as necessary to stabilize the condenser inlet pressure at P2. If the specified value of P2 cannot be sustained at the maximum steam flow rate (20 MW), then perform the test at the maximum sustainable pressure below P2.
4. Continue steady condenser operation at these conditions for a period of time, T2.
5. Reduce the inlet pressure to P3, at approximately 56 C (100 F) per hour and stabilize.
6. Begin injection of noncondensible gas at known rate. Maintain steam flow rate and allow inlet pressure to increase to a maximum or to PV (which ever is lower).

7.

Open the vent valve and bleed off the noncondensible gas until the pressure stops decreasing or to P3. Close the vent valve.

8. Depressurize and cool down the system at approximately 56 C (100*F) per hour.

Tvne 4 - Reactor Heatup/Cooldown without IC Operation:

1.

Heat up and pressurize with steam from ambient to pressure P1 at a rate of approximately 56 C (100 F) per hour.

2.

Depressurize and cool down the system at approximately 56 C (100 F) per hour. The condensate drain valve is not opened during this cycle.

Tvne 5 - Simulate ATWS Event:

1.

Ileat up and pressurize with steam from ambient to pressure P1 at a rate of approximately 56 C (100'F) per hour.

2. Allow the system to stabilize at P1 and then increase pressure rapidly (approximately 0.5 minutes) to P2 and open condensate drain valve.

I

h GE Nuclear Energy 23a6999 REV 3 su so. 43

3. As condensation reduces the inlet pressure, increase the inlet steam flow rate as necessary to stabilize the condenser inlet pressure at P3. If the specified value of P3 cannot be sustained at the maximum steam flow rate (20 MW), then perform the test at the maximum sustainable pressure below P3.
4. Continue steady condenser operation at these conditions for a period of time, T3.
5. At the end of the time period, T3, depressurize and cool down the system at approximately 56 C (100 F) per hour.

6.2.2 Data Recording. The duration of each cycle will be in the range of 7 to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and therefore it will not be necessary to record all data at high sample rates throughout each test. It may be desirable to record some data at very low sample rates and some at high rates for only certain time periods of the test.

6.3 Data Processine/Analvsis General Reouirements. The general requirements for data processing and analysis for the IC are the same as those specified for the PCC in Paragraph 5.3.

4

GE Nuclear Energy 2sas999 su.xo. 44 REv 3 TYPE 1 TYPE 4 a ;L P1 - p,_

T2 l - P2 {

E l l E  %,

0 0 Q $ 9 E

a

\ E *$ i a

>  ?

TIME (T) TIME (T)

TYPE 2 TYPES P2 -

a a P1 - pi _

{  ! T2 $* - P2 -l j - P3 E l 3 E / $

~Y 5

h I S $

O. O h \

E g E

\

TIME (T) TIME (T)

KEY:

. TYPE 3 STABitt2E PRESSURE (NONCONDENSIBLE GAS) AND TEMPERATURES a

p _ e OPEN DRAIN VALVE E ' T2 ' _ py x OPEN VENT VALVE g / AT PRESSURE PV a g P3 -

0 9 E 9

\

+

TIME (T) j 1

l FIGURE 6-1.11ASIC IC TEST CYCLES 1

l l

l

e e

10.0 e

n1 9.5 '

C

% - O a

a e-Q) 7 g 9.0 -

31 - :Ds E m M

e, D X

8.5 -

e e

8.0 e s to 12 14 16 18 20 22 INITIAL POOL TEMPERATURE (deg C) h, g g@

.8 FIGURE 6-2. REQUIRED IC INLET PRESSURE FOR TEST CONDITION NO.1 e

-2 9

h GE Nuclear Energy 23A6999 REV 3 su no. 46 Appendix A- REFERENCE MATRIX OF PCC TEST CONDITIONS Test Tvoe A.l.l. Steady State Performance - Saturated Steam / Air Mixtures Test Conditions (See Par. 5.2.2.):

Test Condition Steam Fh,w Air Flow Range ofInlet Pressure Superheat Number kg/s (lb/s) kg/s (lb/s) kPa g (psig) deg. C (deg. F) 1* 0.45 (1.0) 0.014 (0.030) 193-790 (28-115) 0 (0) 2 1.4(3.0) 0.014 (0.030) 207-790 (30-115) 0 (0) 3* 2.5 (5.5) 0.027 (0.060) 207-790 (30-115) 0 (0) 4* 3.6 (8.0) 0.027 (0.060) 207-790 (30-115) 0(0) 5* 5.0 (l1.0) 0.027 (0.060) 207-790 (30-115) 0(0) 6* 5.7 (12.5) 0.027 (0.060) 207-790 (30-115) 0 (0) 7* 6.6 (14.5) 0.027 (0.060) 207-790 (30-115) 0 (0) 8* 1.4 (3.0) 0.076 (0.17) 193-790 (28-115) 0 (0) 9 5.0 (l1.0) 0.076 (0.17) 207-790 (30-115) 0 (0) 10* 5.7 (12.5) 0.076 (0.17) 207-790 (30-115) 0 (0) 11* 6.6 (l4.5) 0.076 (0.17) 207-790 (30-115) 0 (0) 12* 0.45 (l.0) 0.16 (0.35) 138-535 (20-78) 0 (0) 13 2.5(5.5) 0.16 (0.35) 193- 653 (28-95) 0(0) 14* 3.6 (8.0) 0.16 (0.35) 193-790 (28-115) 0 (0) 15 5.0 (l1.0) 0.I6 (0.35) 193- 790 (28-115) 0 (0) 16 6.6 (14.5) 0.16 (0.35) 200-790 (29-115) 0 (0) 17 2.5(5.5) 0.41 (0.90) 172- 604 (25 88) 0 (0) 18 5.0 (l1.0) 0.41 (0.90) 186- 639 (27-93) 0 (0) 19 5.7 (12.5) 0.41 (0.90) 193- 653 (28-95) 0 (0) 20* 5.0 (l1.0) 0.59 (l.29) 179- 611 (26-89) 0 (0) 21* 6.6 (14.5) 0.59 (1.29) 186- 639 (27-93) 0 (0) 22 1.4 (3.0) 0.86 (l.9)97-453 (14- 66) 0(0) 23 5.0 (11.0) 0.86 (1.9) 159-584 (23-85) 0 (0) 24* 5.7 (12.5) 0.86 (1.9) 165- 597 (24-87) 0(0) 25 6.6 (14.5) 0.86 (l.9) 179- 611 (26- 89) 0 (0)

  • These tests are oflow priority. If necessary, these tests need only to be performed at one inlet pressure. It is preferred that the pressure be near 300 KPag.

,s h GE Nuclear Energy 23A6999 REV 3*

su No.' 47 Test Tvoe A.1.1 (Continued) l Test Condition '

Number  !

26 I Deleted 27 28  :

29 30 l i

Test Duration: It should be possible to do one air flow / steam flow combination at approximately 5 i values ofinlet pressure in one test day. Total estimated time forTests A.I.1 is 30 test days.

Test Tvoe A.1.2. Steadv State Performance-Superheated Steam / Air Mixtures l Test Conditions (See Para. 5.2.3): ,

t Test  !

Condition Steam Flow Air Flow Range ofInlet Pressure Superheat i Number kg/s (lb/s) kg/s (Ib/s) kPa g (psig) deg. C (deg. F) l 31 <- Deleted e I 39~  ;

+-- Deleted -+

33 +- Deleted -+ i 34 4- Deleted a 35 5.0 (l1.0) 0.86 (1.9) 159-584 (23-85) b 20 (36) 36 5.0 (11.0) 0.86 (1.9) 159-584 (23-85) 30 (54) )

Test Duration: Estimated time to complete Tests A.I.2 is six test days. j l

. __-. - ..-l

w GE Nuclear Energy 23a6999 su so. 48 g, 3 Test Tvne A.l.3. Steadv State Performance - Steam Ontv Test Conditions - No air in PCC tubes (See Para. 5.2.4):

Test l

Condition Steam Flow Air Flow Superheat Number kg/s (Ib/s) kg/s (lb/s) deg. C (deg. F) 37 0.45 (1.0) 0 (0) 0 (0) 38 1.4(3.0) 0 (0) 0 (0) 39 2.5(5.5) 0 (0) 0 (0) 40 3.6 (8.0) 0 (0) 0 (0) 41 5.0 (11.0) 0 (0) 0 (0) 42 5.7 (12.5) 0 (0) 0 (0) 43 6.6 (14.5) 0 (0) 0 (0) 44 1.4 (3.0) 0 (0) 15 (27) 45 1.4 (3.0) 0 (0) 20 (36) 46 1.4 (3.0) 0 (0) 30 (54) 47 5.0 (11.0) 0 (0) 15 (27) 48 5.0 (11.0) 0 (0) 20 (36) 49 5.0 (11.0) 0 (0) 30 (54)

Test Duration: These tests are estimated to require four test days for completion.

Test Conditions- Air in PCC Tubes (See Para. 5.2.4):

Test Condition Steam Flow Air Flow Superheat Number kg/s (.lb/s) kg/s (lb/s) deg. C (deg. F) 50 1.4 (3.0) very low 0 (0) 51 5.0 (11.0) veiy low 0 (0) 52 1.4 (3.0) very low 20 (36) 53 5.0 (11.0) very low 30 (54)

Test Duration: These tests are estimated to require two test days for completion.

o h GE Nuclear Energy 23A6999 REV 3*

su No. 49 Test Tyne A.2.1. Effect of Pool Water Level- Saturated Steam Test Tyne A.2.2. Effect of Pool Water Level- Saturated Steam / Air hfixtures Test Conditions:

Test Condition Steam Flow Air Flow Range ofInlet Pressure Superheat -

Number kg/s (Ib/s) kg/s (Ib/s) kPa g (psig) deg. C (deg. F) 54 5.0 (11.0) 0 (0) (dependent variable) 0 (0) 55 5.0 (11.0) 0.14 (0.31) (start at minimum) 0 (0) 56 6.6 (14.5) 0.86 (1.9) (start at minimum) 0 (0)

Test Duration: These tests are estimated to require four test days for completion.

Test Tvne A.3.1. Additional Structural Tests- Simulated LOCA Pressurization. See Paracranh 5.2.6.

Test Tyne A.S.2. Additional Structural Tests- Simulated Leak Testine. See Paracranh 5.2.6.

Test Tvne 11.1. Deleted Test Tvpe 11.2. Effect of Low Densitv Noncondensibles Test Conditions:

Test Condition Steam Flow Helium Flow Air Flow Superheat Number kg/s (Ib/s) kg/s (Ib/s) kg/s (Ib/s) deg. C (deg. F) 75 1.4 (3.0) veiy low 0 (0) 0(0) 76 5.0 (11.0) veiy low 0 (0) 0 (0) 77 1.4 (3.0) veiy low 3.4 X He flow 0 (0) 78 5.0 (11.0) very low 3.4 X He flow 0 (0)

Test Duration: These tests should be achievable in two test days.

i l

I l

O h GE Nuclear Energy 23A6999 REv 3 sitso. 50 Appendix B - REFERENCE MATRIX OF IC TEST CONDITIONS Each isolation condenser test will consist of one of the basic IC test cycles defined in Paragraph 6.2.

Inlet Pressure, P2 Inlet Pressure, P3 Initial Test No. Inlet Pool Cond. of Cycle Pressure, P1 Temp.

No. Cycles Type hf Pag (psig) hlPag (psig) T2,h hlPag (psig) T3, h Deg C (F) Notes 1 3 1 9.480 (1375) 8.618 (1250) 2 < 21 (70) 1,2,9 2 2 2 8.618 (1250) 8.618 (1250) 2 7.920 (1150) 0.5 < 32 (90) 1 3 2 2 8.618 (1250) 8.618 (1250) 2 7.240 (1050) 0.5 < 32 (90) 1 4 2 2 8.618 (1250) 8.618 (1250) 2 6.21 (900) 0.5 < 32 (90) 1 5- 2 2 8.618 (1250) 8.618 (1250) 2 5.52 (800) 0.5 < 32 (90) 1 6 2 2 8.618 (1250) 8.618 (1250) 2 4.83 (700) 0.5 < 32 (90) 1 7 2 2 8.618 (1250) 8.618 (1250) 2 4.14 (600) 0.5 < 32 (90) 1 8 2 2 8.618 (1250) 8.618 (1250) 2 3.45 (500) 0.5 9

< 32 (90) 1 9 9 2 8.618 (1250) 8.618 (1250) 2.76 (400) 0.5 < 32 (90) 1 10 ') 9 8.618 (1250) 8.618 (1250) 2 2.07 (300) 0.5 < 32 (90) 1 11 9 ')

8.618 (1250) 8.618 (1250) 2 1.38 (200) 0.5 < 32 (90) 1 12 1 3 8.618 (1250) 8.618 (1250) 2 1,4 0.48 (70) < 32 (90) 13 1 3 8.618 (1250) 8.618 (1250) 9 9.07 (300) < 32 (90) 1,4 14 3 3 8.618 (1250) 8.618 (1250) 2 4.83 (700) 1,5

< 32 (90) 15 1 3 8.618 (1250) 8.618 (1250) 2 7.24 (1050) < 32 (90) 1,4 16 16 1 8.618 (1250) 2 8.618 (1250) < 32 (90) 1,6,7 17 85 4 8.618 (1250) < 32 (90) 18 1 5 8'618 (1250) 9.480 (1375) 8.618 (1250) 2 < 32 (90) 1,8 Notes:

1. If the specified pressure, P2, cannot be sustained with maximum steam flow rate (20 N!W), then perform the test at the maxinuun sustainable pressure below P2.

2.

The inlet pressure P1, can be reduced in accordance with Figure f>-2 if the initial pool temperature is less than 17 C (62 F).

3.

Time period, T3, is approximate. Conditions at P3 should be maintained long enough to record steady-state condenser performance data.

4.

Inject air and vent from bottom vent. Ilegin venting at 7.653 hlPag (1110 psig) or when pressure peaks.

l 1

1

o h GE Nuclear Energy 23a6ooo REV 3 su so. 51 FINAL Notes (Continued):

5. Three tests as follows:

inject air and vent from the bottom vent inject air and vent from the top vent first then bottom vent inject air /heham mixture and vent from top vent first then bottom vent.

Begin venting all tests at 7.653 MPag (1110 psig) or when pressure peaks.

6. Total number of cycles for test conditions 1 through 16 shall be 45. Number of cycles of Test Condition 16 can be adjusted to maintain this totalif other conditions are repeated, added or deleted.
5. For one test, after time T2, continue to run at pressure P2 without pool refill until pool level decreases to mid-height of condenser tubes.
8. This test cycle should be done at the end of the test series.
9. On the first cycle (or very early in the test), determine system heat losses at pressure P1 and temperatures in the IC inlet pipe with the condensate drain valve closed. Then open the cor.densate drain valve bypass line slightly and record heat losses and temperature distribution.

Repeat by further opening the bypass line valve and recording data until there is little change in IC inlet pipe temperature.