MONTHYEARML20079J1811982-12-21021 December 1982 Affidavit of ML Smith Re Transshipment of Spent Fuel.Unless VEPCO Can Secure Addl Storage Space for Surry Spent Fuel, Surry Will Lose Full Discharge Capability ML19322B8961979-07-23023 July 1979 Affidavit Attesting That No Credible Analysis of Potomac Alliance Alternatives May Be Undertaken W/O Examination of Greater Body of Facts.Prof Qualifications Encl ML19209B9251979-05-30030 May 1979 Affidavit of EA Baum Re Util Schedule for Refueling Unit 1 & Importance of Installation of New Racks at Unit 2 ML19289C4821978-12-13013 December 1978 Affidavit of Rd Pollard.Certifies That Author Has Reviewed Staff Submissions Re Protection Against low-trajectory Turbine Missiles & Provided the Technical Analysis in the Ucs Reply Brief.Certificate of Svc Encl 1982-12-21
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20148M6511997-06-18018 June 1997 Comment Opposing Proposed Suppl to Bulletin 96-001 That Would Request Licensees to Take Action to Ensure Continued Operability of Control Rods L-95-045, Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors1995-10-19019 October 1995 Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors ML20080M1121995-02-27027 February 1995 Comment Re Proposed Suppl 5 to GL 88-20 IPEEE for Severe Accident Vulnerabilities. Proposed GL Suppl Should Indicate That Licensees Can Use Llnl Hazard Results of NUREG-1488 Re Revised Hazard Estimates Instead of NUREG/CR-5250 ML20073M0751994-09-23023 September 1994 Comment on Proposed Rules 10CFR30,40,70 & 72 Re Clarification of Decommissioning Funding Requirements. Permitting Access to Funds Only on Semiannual Basis Seems Unnecessarily Restrictive ML20069L5291994-06-13013 June 1994 Comment Supporting Proposed Rulemaking 50-60 Re Petition for Rulemaking & Changes to 10CFR50.54 ML20029D8251994-04-29029 April 1994 Comment Supporting Elimination of Proposed 5-yr Implementation Schedule & Believes That Current Programs Adequate to Maintain Containment Integrity ML20044G1971993-05-24024 May 1993 Comment Supporting Draft Insp Procedure Re Commercial Grade Procurement & Dedication ML20044E5721993-05-19019 May 1993 Comment Supporting Proposed Generic Ltr for Relocation of TS Tables on Instrument Response Time Limits ML20044D3271993-05-0707 May 1993 Comment Opposing Proposed GL Availability & Adequacy of Design Bases Info ML20125B6141992-12-0303 December 1992 Exemption from Requirements of 10CFR50,app a Re GDC-2 & 10CFR50.49 Re Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants ML20095J6881992-04-23023 April 1992 Comment Opposing Draft Reg Guide DG-1022, Emergency Planning & Preparedness for Nuclear Power Plants ML20077R5161991-08-14014 August 1991 Comment Supporting Petition for Rulemaking PRM-20-20 Re Reduced Total Effective Dose Equivalent to Individual Members of Public from 0.5 Rem (5 Msv) to 0.1 Rem (1 Msv) ML20235N8531989-02-14014 February 1989 Comment Supporting Chapter 1 Re Policy Statement on Exemptions Below Regulatory Concern.Policy Development for Criteria for Release of Radioactive Matl Needed for Development of Consistent Waste Mgt Practices ML20235P3311989-02-0808 February 1989 Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants ML20236P5851987-11-0909 November 1987 Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation Encl ML20138N5311985-11-0101 November 1985 Memorandum & Order Affirming ASLB 850903 Initial Decision Authorizing Director of NRR to Issue License Amend for North Anna to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry Power Station.Served on 851101 ML20133K7171985-10-18018 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20133K6801985-10-18018 October 1985 Forwards Notice of Withdrawal of Appearance in Proceeding. Requests Svc List Be Revised to Include Client Under Listed Address.W/O Encl ML20133F4241985-10-0909 October 1985 Order Stating That ASLB 850903 Initial Decision Authorizing NRR to Amend OL to Permit Receipt & Storage of Spent Fuel Should Not Be Deemed Final,Pending Further Order. Served on 851009 ML20138A9521985-10-0909 October 1985 Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl ML20134N6981985-09-0303 September 1985 Initial Decision LBP-85-34 Authorizing NRR to Issue Amends to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry.Initial Decision Effective Immediately.Served on 850904 ML20134N4381985-09-0303 September 1985 Order Granting Licensee 850621 Request to Correct Transcript.Proposed Transcript Corrections & Certificate of Svc Encl.Served on 850904 ML20129K1251985-07-18018 July 1985 Brief in Support of NRC 850718 Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing Issuance of Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies ML20129K1281985-07-18018 July 1985 Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing NRR to Issue Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies ML20129F8231985-07-12012 July 1985 Reply Opposing Concerned Citizens of Louisa County post- Hearing Brief.Licensee Proposed Findings of Sabotage & Human Error Not Addressed.Challenge of NRC EIS Conclusion Unnecessary.Certificate of Svc Encl ML20209F0021985-07-0808 July 1985 Post-hearing Brief Re Issues Raised at ASLB 850521 & 22 Evidentiary Hearings.Nrc Required by NEPA to Evaluate Alternative of Constructing & Operating Dry Cask Storage Facility,But Failed to Perform Even Cursory Review ML20209F2041985-07-0808 July 1985 Proposed Findings of Fact & Conclusions of Law Re Application for Amend to Ol,Authorizing Licensee to Ship 500 Spent Nuclear Fuel Assemblies from Surry Power Station to North Anna Station.Certificate of Svc Encl ML20128H0791985-07-0808 July 1985 Order Granting Concerned Citizens of Louisa County 850627 Motion for 7-day Extension Until 850708 to File Proposed Findings of Fact & Conclusions of Law.Served on 850708 ML20128G9471985-06-27027 June 1985 Motion for Extension of 850701 Deadline to File Proposed Findings of Fact & Conclusions of Law.Addl Wk Required Due to Addl Legal Duties.Certificate of Svc Encl ML20127F0511985-06-21021 June 1985 Proposed Findings of Fact & Conclusions of Law Re Util 820713 Application to Amend Ol,Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.Unsigned,Undated Order & Certificate of Svc Encl ML20127F0451985-06-21021 June 1985 Post-hearing Brief Requesting Board Find in Util Favor Re Proposed OL Amend Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.No Basis from Sabotage or Human Error Considerations for Denying Proposed Amend ML20128A7731985-05-22022 May 1985 Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation Encl ML20125C4081985-05-21021 May 1985 Applicant Exhibit A-H-11,consisting of Undated,Untitled Photograph H ML20125C3601985-05-21021 May 1985 Applicant Exhibit A-B-5,consisting of Undated,Untitled Photograph B ML20125C4221985-05-21021 May 1985 Applicant Exhibit A-J-13,consisting of Undated,Untitled Photograph J ML20125C3471985-05-21021 May 1985 Applicant Exhibit A-3,consisting of SAND82-2365, Assessment of Safety of Spent Fuel Transportation in Urban Environs, Dtd June 1983 ML20125C4301985-05-21021 May 1985 Applicant Exhibit A-K-14,consisting of Undated,Untitled Photograph K ML20125C3941985-05-21021 May 1985 Applicant Exhibit A-F-9,consisting of Undated,Untitled Photograph F ML20125C4361985-05-21021 May 1985 Applicant Exhibit A-L-15,consisting of Undated,Untitled Photograph L ML20125C3101985-05-21021 May 1985 Staff Exhibit S-1,consisting of Undated Environ Assessment & Finding of Proposed No Significant Impact Re 820713 & 0820 Applications for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,allowing Receipt & Increased Storage of Spent Fuel ML20125C3411985-05-21021 May 1985 Applicant Exhibit A-2,consisting of 830915 Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask Unloading & Handling Procedures ML20125C3291985-05-21021 May 1985 Staff Exhibit S-3,consisting of Forwarding NMSS Apr 1985 Environ Assessment Re 821008 Application for Authority to Construct & Operate Dry Cask ISFSI at Surry Power Station ML20125C4001985-05-21021 May 1985 Applicant Exhibit A-G-10,consisting of Undated,Untitled Photograph G ML20125C3381985-05-21021 May 1985 Applicant Exhibit A-1,consisting of 831104 Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask Loading & Handling Procedures, for Surry Power Station ML20125C3711985-05-21021 May 1985 Applicant Exhibit A-C-6,consisting of Undated,Untitled Photograph C ML20125C3791985-05-21021 May 1985 Applicant Exhibit A-D-7,consisting of Undated,Untitled Photograph D ML20125C3821985-05-21021 May 1985 Applicant Exhibit A-E-8,consisting of Undated,Untitled Photograph E ML20125C3501985-05-21021 May 1985 Applicant Exhibit A-A-4,consisting of Undated,Untitled Photograph a ML20125C3191985-05-21021 May 1985 Staff Exhibit S-2,consisting of Undated Safety Evaluation Re Increasing Spent Fuel Storage Capacity.Proposed Mods to Spent Fuel Pool & Transshipment/Storage of Spent Fuel Acceptable ML20125C4131985-05-21021 May 1985 Applicant Exhibit A-I-12,consisting of Undated,Untitled Photograph I 1997-06-18
[Table view] |
Text
_ _ _ _ _ _ _
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
) Docket Nos. 50-338/339-OLA-2 VIRGINIA ELECTRIC )
AND POWER COMPANY )
(North Anna Power Station, Units 1 and 2)
Affidavit of Marvin L. Smith On December 21, 1982, there appeared before me Marvin L.
Smith, who, first being sworn by me, stated and affled as follows:
- 1. I am Marvin L. Smith. I live at 5707 Hillview Drive, Mechanicsville, Virginia. I am employed by Virginia Electric and Power Company as Supervisor, Nuclear Engineering. I i.
responsible for coordinating the activities that the Company is carrying out to provide interim storage for spent nuclear fuel from the reactors at the Company's Surry and North Anna Power Stations. I am familiar with the Company's nuclear fuel management plans, including its estimates of future spent fuel inventories, and with its plans for shipping spent fuel from l Surry for storage at North Anna.
- 2. Based on current fuel management plans, unless Vepco can secure additional storage space for spent fuel from its Surry Power Station, Surry will lose full core discharge capability l during the refueling outage of Surry Unit 2 that is scheduled to begin in November 1984. If the Surrv Units continue to operate f 8212280130'821222 l i
PDR ADOCK 05000330 l
-G PDR . _ .
L - . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l
,- L ,
4 as planned, Vepco will lose in 1987 the ability to store even the one-third of the fuel cores that would have to be replaced if Surry Units 1 and 2 are to continue to operate.
- 3. NRC does not require Vepco to maintain full core dischargh~ capability. It is prudent to do so, however, because l l
if a unit cannot be operated without maintenance or repairs that require removal of all the fuel from the reactor, and if there is no place to store the fuel temporarily, the unit must be shut down. Vepco estimates that with both Surry Units off-line, it would incur additional energy costs of $350 million per year in 1982 dollars. Vepco has had to make unscheduled full core discharges on three occasions in the past.
- 4. Vepco has concluded that the most desirable option available ts it for preventing the loss of full core discharge l
capability at the Surry Power Station in the fall of 1984 and the I
subsequent loss of refueling capability is to ship spent fuel presently at Surry to North Anna for storage there. Accordingly, i
Vepco has filed a license amendment application with NRC that would authorize it to store up to 500 Surry spent fuel assemblies in the North Anna Units 1 and 2 spent fuel pool.
- 5. Storage of Surry spent fuel assemblies at North Anna would, of course, hasten the day when the North Anna pool would be filled. Thus, Vepco has also applied to NRC for a license amendment authorizing the installation of neutron-absorbing racks at North Anna Units 1 and 2. If both of these applications are approved, the dates for loss of full core discharge capability would be extended to 1990 or beyond for the Surry and North Anna 1
l
1 Power Stations. Between now and 1990, Vepco will have an opportunity to evaluate options for providing additional storage )
I beyond such dates and to implement one or more options. l 6.
In order to preserve full core discharge capability at Surry, Vepco must move at least 7 and possibly as many as 15 spent fuel assemblies prior to the beginning of the refueling of Surry Unit 2 projected for November 1984.
- 7. Several constraints affect the timing of shipments from Surry to North Anna:
(a) Vepco plans to avoid shipping spent fuel from Surry to North Anna while any nuclear unit at either Station is in a refueling outage. There is only one crane in each fuel pool, and so shipment or receipt of spent fuel during a refueling outage could disrupt and prolong the movement of fuel back and forth between the reactor being refueled and its spent fuel pool. In addition, a refueling outage, which occurs roughly every 18 months at each unit, is a time when certain types of maintenance must be performed. Every effort is made to perform all maintentace during a refueling outage that would otherwise require a special shutdown of l the unit. Thus refueling outages are times of intensive l maintenance and repair work, and any work that does not have to be done during an outage is not done. Shipment and receipt of spent fuel does not have to be done during a refueling outage.
(b) Refuelings during 1984 are presently scheduled as L follows:
North Anna Unit 1: January 6 - February 17, 1984 Surry Unit 1: June 10 - July 22, 1984 i
. -4 North Anna Unit 2: October 19 - November 30, 1984 Surry Unit 2: November 15 - December 30, 1984 (c) Vepco wishes to avoid shipping spent fuel during December through March due to the high probability that sev$re weather will disrupt the shipping campaign. 3 I
- 8. Based on the foregoing constraints Vepco has two j 1
" windows" during which it can ship spent fuel in 1984. The first is in April and May and the second in August and September 1984.
Vepco plans to ship 36 spent fuel assemblies from Surry to North Anna during a four-week period within each of those " windows."
- 9. North Anna Unit I has been off-line for repairs since 1
May 1982. During efforts to restart the Unit in December 1982, l the generator was damaged, and it is now estimated that the Unit will remain off-line until April 1983. The Company is reviewing l
I the refueling outage schedule set out in paragrapi 7 (b) in light l of the longer-than-expected outage of North Anna Unit 1, and I
\
l expect that the dates shown in paragraph 7 (b) will be changed as i
a result. But I do not believe that these changes will make a material difference in the time when the Company will need to begin storing Surry fuel at North Anna.
- 10. Thus, in order to carry out its program for storing Surry fuel at North Anna, Vepco must receive a license amendment approving its proposal prior to April 1984. In any event, it is essential that Vepco ship from 7 to 15 assemblies no later than during the August and September 1984 " window," if it is to maintain full core discharge capability at Surry, and so it must have a favorable decision, if one is appropriate, by the end of July 1984.
l
l
,.* 5-
- 11. The installation of neutron-absorbing racks in the North Anna Units 1 and 2 pool should not be done when a refueling outage is going on at North Anna. In addition, it shou 3d not be done when spent fuel from Surry is being received at North Anna.
Vepco esEimates that installing these racks will take from one to
- two months. j
- 12. It is economically desirable to install the neutron-absorbing racks prior to the storage of any Surry spent fuel at North Anna and before the 1984 North Anna Unit 2 refueling outage is carried out. This would avoid the double handling of about 100 assemblies. Thus, the best time to install the new racks would be during February and March 1984.
Obviously, meeting this schedule is not essential to the Company in the same way that it is essential to receive approval before August 1984 of the proposal to store Surry fuel at North Anna.
But it is certainly desirable.
- 13. Vepco has reviewed the status of applications filed by utilities with NRC for license amendments authorizing the installation of high density or neutron-absorbing racks. As of l
}
March 1982, 58 such applications had been filed by 41 different utilities. Hearings were held on nine of those proceedings. The time from filing to issuance of a license amendment in contested proceedings ranged from one to two years, though one proceeding lasted 38 months. In addition, there has been one contested proceeding involving an application for permission to store spent fuel from one station at another. The time between filing of the
- __ - _______ _ _ __ ~
application in that proceeding and issuavce of the initial decision-was 26 months.
I
~
T[4t4m b Marvin 1. Smith '
Commonwealth of Virginia )
) To wit:
City of Richmond )
Subscribed and sworn to before me in my jurisdiction aforesaid this 21st day of December 1982.
My commission expires: % 9 /f /98Y C=Qos Q. .