Monthly Operating Rept for June 1995 for Clinton Power Station,Unit 1
ML20086K040
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/30/1995
From: Hollon M
ILLINOIS POWER CO.
To:
Shared Package
ML20086K036 List:
References
NUDOCS 9507190347
Download: ML20086K040 (4)


Text

- - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ . . _ _ ._______ _ ___ ___ - _ _ ___

Attichm:nt 1 to U-602470 Page 1 of 4 i

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month June 1995 None l

\

t j

1 9507190347 950713 PDR ADOCK 05000461 R PDR

l l

Attechment 1 to U-602470 l I

Page 2 of 4 AVERACE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 06/30/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 MONTH June 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 924 17 917 2 922 18 916 3 922 19 914 4 921 20 914 5 920 21 914 6 918 22 892 7 917 23 882 8 919 24 913 9 920 25 885 10 919 26 912 11 918 27 913 12 920 28 913 13 920 29 912 14 919 30 913 15 918 31 N/A 16 918

m

-s  ; '.

Attacharnt 1 to U-602470 Page 3 of 4 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT _Glinton l' DATE 06/30/95 l COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 OPERATING STATUS

1. REPORTING PERIOD: June 1995 GROSS HOURS IN REPORTING PERIOD: 222
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 239I.t MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 2]2 DESIGN ELECTRICAL RATING (MWe-Net): ill
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Epn2
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMUIATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL... 720.0 3.062.9 48.814.8
6. REACTOR RES ERVE SHUTDOWN HOURS . . . . . . . . . 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE. . . . . . . . . . . . ... 720.0 2.963.6 47.388.0 ,
8. UNIT RESERVE SHUTDOWN HOURS............ 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) . . . 2.084.611 7.581.588 126.047.786
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 688.068 2.487.297 41.644.248
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 658.164 2.364.162 39.640.340
12. REACTOR SERVICE FACTOR................. 100.0% 70.5% 73.3%
13. REACTOR AVAILABILITY FACTOR............ 100.0% 70.5% 73.3%
14. UNIT SERVICE FACTOR.................... 100.04 68.2% 71.1%
15. UNIT AVAILABILITY FACTOR............... 100.0% 68.2% 71.1%

16 .~ UNIT CAPACITY FACTOR (Using MDC)....... 98.3% 58.5% 64.0%

17. UNIT CAPACITY FACTOR (Using Design MWe) 98.0% 58.3% 63.8%
18. UNIT FORCED OUTAGE RATE................ 0.0% 5.0% 9.0%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA 1

M -- s - w mie,,, w w t-w-

Attachment 1 to U-602470 -

Page 4 of 4 *

,1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 .

UNIT Clinton 1 DATE 06/30/95 -

COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MOh"ni June 1995 METHOD OF TYPE SHUTTING DOk'N F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS NONE (1) Reason A-Equipment Failure (explain), B-Maintenance or Test, C-Refueling, D-Regulatory Restriction, E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method 1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)

-__. _ _ _ - _ - -