February 2002 Monthly Operating Report for Point Beach, Units 1 & 2
ML020860506
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/15/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2002-0021
Download: ML020860506 (14)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0021 GL 97-02 March 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of February 2002.

Sincere~ly, T. J. Webb Regulatory Affairs Manager KMD Attachment cc
J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0021 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated March 15, 2002 Re: Monthly Operating Report -February 2002

DOCKET NO. 50-266 OPERATING DATA REPORT DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 920-755-6,862 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: February - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE 672.0 1,416.0 274,511.0

11. HOURS IN REPORTING PERIOD 1,416.0 225,025.8 672.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 667.3 0.0
13. REACTOR RESERVE SHUTDOWN HOURS 1,416.0 221,510.0 672.0
14. HOURS GENERATOR ONLINE 0.0 846.9 0.0
15. UNIT RESERVE SHUTDOWN HOURS 316,149,712.0 1,018,734.0 2,147,261.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 746,020.0 107,288,120.0 353,810.0
17. GROSS ELECTRICAL ENERGY GENERATED 102,290,819.5 339,233.0 715,299.5
18. NET ELECTRICAL ENERGY GENERATED (MWH) 100.0% 80.7%

100.0%

19. UNIT SERVICE FACTOR 100.0% 81.0%

100.0%

20. UNIT AVAILABILITY FACTOR 99.1% 76.2%

99.0%

21. UNIT CAPACITY FACTOR (USING MDC NET) 98.1% 74.7%

98.0%

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 4.4%

0.0%

23. UNIT FORCED OUTAGE RATE DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/01/02 COMPLETED BY: Kim M. Duescher MONTH FEBRUARY - 2002 TELEPHONE: 920-755-6862 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 11 506 21 504 1 509 12 504 22 505 2 504 13 501 23 504 3 506 14 510 24 506 4 510 15 504 25 506 5 499 16 507 26 504 6 502 17 503 27 505 7 498 18 506 28 503 8 508 9 506 19 506 10 503 20 506

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 03/12/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: February - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672.0 1,416.0 259,296.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 611.3 1,355.3 219,136.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 600.3 1,344.3 216,198.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 858,085.0 1,986,742.0 312,035,159.0
17. GROSS ELECTRICAL ENERGY GENERATED 299,230.0 690,320.0 106,418,360.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 285,305.0 660,267.5 101,443,774.5
19. UNIT SERVICE FACTOR 89.3% 94.9% 83.4%
20. UNIT AVAILABILITY FACTOR 89.3% 94.9% 83.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) 82.9% 91.1% 79.8%
22. UNIT CAPACITY FACTOR (USING DER NET) 82.4% 90.5% 78.4%
23. UNIT FORCED OUTAGE RATE 10.7% 5.1% 2.2%

"DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/01/02 COMPLETED BY: Kim M. Duescher MONTH FEBRUARY - 2002 TELEPHONE: 920-755-6862 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 11 513 21 511 1 494 12 512 22 366 2 210 13 509 23 0 3 215 14 512 24 0 4 496 15 511 25 3 5 508 16 515 26 413 6 511 17 510 27 511 7 512 18 513 28 510 8 512 514 19 514 9

10 514 20 514

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 755-6862 REPORTING PERIOD: February 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method 1 Manual A. Equipment Failure (Explain) 2 Manual Trip/Scram B. Maintenance or Test 3 Automatic Trip/Scram C. Refueling D. Regulatory Restriction 4. Continuation

5. Other (Explain)

E. Operator Training/license Examination F .Administrative G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of February was 504.81 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 755-6862 REPORTING PERIOD: February 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 1 02/01/02 SCHEDULED 0 B 5 Unit 2 power reduction from full power to 50%

for condenser water box inspection and cleaning in accordance with OP-3A 2 02/22/02 FORCED 72 D 1 Unit 2 shutdown was required due to 2P-15B SI Pump not being returned to service within the required completion time of TSAC 3.5.2A.

(1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of February was 475.5 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - FEBRUARY 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE MWH 299,230.0 690,320.0 106,418,360.0 GROSS GENERATION 30,052.5 4,974,585.5 MWH 13,925.0 TOTAL STATION SERVICE 660,267.5 101,443,774.5 MWH 285,305.0 NET OUTPUT 487.5 410.4 MWH 445.3 AVG. GROSS GENERATION FOR MONTH 513.5 492.2 MWH 498.5 AVG. GROSS GENERATION RUNNING 4.4% 4.7%

4.7%

TOTAL STATION SERVICE/GROSS GEN. 1,344.3 216,198.5 HRS 600.3 HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.25% 33.23% 32.51%

NET PLANT EFFICIENCY 10,268.9 10,497.4 BTU/KWH 10,264.2 NET PLANT HEAT RATE 28 59 9,149 DAYS NUMBER OF DAYS OF OPERATION 91.1% 79.8%

82.9%

UNIT NET CAPACITY FACTOR 94.9% 83.4%

89.3%

UNIT SERVICE FACTOR 0 92 0

SCHEDULED OUTAGES 1 1 59 FORCED OUTAGES 71.7 4,901.0 HRS 71.7 FORCED OUTAGE HOURS 5.1% 2.2%

10.7%

UNIT FORCED OUTAGE RATE UNITS MONTH YEAR CUMULATIVE NUCLEAR 1,355.3 219,136.9 HRS 611.3 HOURS CRITICAL 1,416.0 259,296.0 HRS 672.0 TOTAL HOURS POSSIBLE 0 50 0

INADVERTANT REACTOR TRIPS 60.7 40,159.1 HRS 60.7 DURATION OF REACTOR DOWN TIME 92.4% 79.3%

84.1%

REACTOR CAPACITY FACTOR 95.7% 84.5%

91.0%

REACTOR SERVICE FACTOR 1,986,742.0 312,035,159.0 MWTHR 858,085.0 THERMAL POWER GENERATED THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 15,348,266.0

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - FEBRUARY 2002 UNITS MONTH YEAR CUMULATIVE ELECTRICAL 746,020.0 107,288,120.0 MWH 353,810.0 GROSS GENERATION 14,577.0 30,720.5 4,997,300.5 MWH TOTAL STATION SERVICE 339,233.0 715,299.5 102,290,819.5 MWH NET OUTPUT 526.5 526.9 390.8 MWH AVG. GROSS GENERATION FOR MONTH 526.5 526.9 484.3 MWH AVG. GROSS GENERATION RUNNING 4.1% 4.1% 4.7%

TOTAL STATION SERVICE/GROSS GEN. 672.0 1,416.0 221,510.0 HRS HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.31% 32.36%

33.30%

NET PLANT EFFICIENCY 10,244.8 10,547.8 BTU/KWH 10,248.7 NET PLANT HEAT RATE 28 59 10,111 DAYS NUMBER OF DAYS OF OPERATION 99.0% 99.1% 76.2%

UNIT NET CAPACITY FACTOR 100.0% 100.0% 80.7%

UNIT SERVICE FACTOR 0 0 126 SCHEDULED OUTAGES 0 0 73 FORCED OUTAGES 0.0 0.0 10,227.1 FORCED OUTAGE HOURS HRS 0.0% 0.0% 4.4%

UNIT FORCED OUTAGE RATE MONTH YEAR CUMULATIVE NUCLEAR UNITS 225,025.8 HRS 672.0 1,416.0 HOURS CRITICAL 672.0 1,416.0 274,511.0 HRS TOTAL HOURS POSSIBLE 0 0 57 INADVERTANT REACTOR TRIPS 0.0 0.0 49,569.2 HRS DURATION OF REACTOR DOWN TIME 99.8% 99.9% 75.8%

REACTOR CAPACITY FACTOR 100.0% 100.0% 82.0%

REACTOR SERVICE FACTOR 1,018,734.0 2,147,261.0 316,149,712.0 MWTHR THERMAL POWER GENERATED MWTHR 1,018,734.0 THERMAL POWER GENERATED THIS FUEL CYCLE

POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

February, 2002 un.t Unit 1 vAAn Unitvna 2 V1ý7 MT v IT I DAY Gen X02 X04 X08 X27 Net Mwnr Avg Mwe i Gen .. Net Mk"-. M..

12215.5 509.0 12380.0 474.0 38.0 1.5 6.0 11860.5 494.2 1 12740.0 480.0 37.0 1.5 6.0 418.0 41.0 1.0 5.5 5044.5 210.2 38.0 1.0 5.5 12090.5 503.8 5510.0 2 12610.0 475.0 41.0 1.0 6.5 5162.5 215.1 6.5 12140.5 505.9 5630.0 419.0 3 12660.0 478.0 34.0 1.0 6.5 11915.5 496.5 509.9 12440.0 473.0 44.0 1.0 480.0 36.0 1.0 6.5 12236.5 12187.5 507.8 4 12760.0 475.0 30.0 1.0 6.5 35.0 1.0 6.5 11968.5 498.7 12700.0 5 12490.0 479.0 36.0 1.0 5.5 12265.5 511.1 5.5 12040.5 501.7 12780.0 472.0 6 12560.0 478.0 35.0 1.0 1.0 6.0 12290.0 512.1 497.5 12800.0 465.0 38.0 487.0 35.0 1.0 6.0 11941.0 512.0 7 12470.0 12800.0 465.0 40.0 1.0 5.5 12288.5 468.0 34.0 1.0 5.5 12201.5 508.4 513.8 8 12710.0 466.0 37.0 1.0 5.0 12331.0 33.0 1.0 5.0 12143.0 506.0 12840.0 9 12660.0 478.0 41.0 1.0 6.0 12325.0 513.5 6.0 12070.0 502.9 12840.0 467.0 12590.0 478.0 35.0 1.0 5.5 12314.5 513.1 10 506.1 12830.0 468.0 41.0 1.0 483.0 35.0 1.0 5.5 12145.5 12278.0 511.6 11 12670.0 467.0 38.0 1.0 6.0 35.0 1.0 6.0 12097.0 504.0 12790.0 12 12620.0 481.0 467.0 40.0 1.0 6.0 12216.0 509.0 34.0 1.0 6.0 12029.0 501.2 12730.0 13 12550.0 480.0 40.0 1.0 5.5 12278.5 511.6 5.5 12229.5 509.6 12790.0 465.0 14 12750.0 479.0 35.0 1.0 5.5 12268.5 511.2 504.3 12780.0 466.0 39.0 1.0 12620.0 478.0 33.0 1.0 5.5 12102.5 12350.5 514.6 15 12860.0 468.0 35.0 1.0 5.5 479.0 34.0 1.0 5.5 12170.5 507.1 510.0 16 12690.0 465.0 39.0 1.0 5.5 12239.5 34.0 1.0 5.5 12081.5 503.4 12750.0 17 12600.0 478.0 36.0 1.0 5.5 12320.5 513.4 1.0 5.5 12139.5 505.8 12830.0 467.0 18 12660.0 479.0 35.0 1.0 5.5 12328.5 513.7 505.9 12840.0 468.0 37.0 480.0 33.0 1.0 5.5 12140.5 12326.5 513.6 19 12660.0 12840.0 469.0 38.0 1.0 5.5 34.0 1.0 5.5 12149.5 506.2 511.4 20 12670.0 480.0 472.0 39.0 1.0 5.5 12272.5 35.0 1.0 5.5 12107.5 504.5 12790.0 21 12630.0 481.0 117.0 1.0 7.0 8780.0 365.8 1.0 7.0 12126.0 505.2 9260.0 355.0 22 12650.0 482.0 34.0 1.0 5.5 -408.5 -17.0 12099.5 504.1 0.0 0.0 402.0 12620.0 480.0 34.0 1.0 5.5 -400.5 -16.7 23 0.0 0.0 399.0 0.5 1.0 479.0 34.0 0.5 1.0 12135.5 505.6 2.7 24 12650.0 53.0 320.0 1.0 11.0 65.0 1.0 11.0 12133.0 505.5 450.0 25 12660.0 481.0 34.0 1.0 6.0 9904.0 412.7 12101.0 504.2 10410.0 450.0 49.0 12620.0 479.0 33.0 1.0 6.0 12253.5 510.6 26 12790.0 478.0 51.0 1.0 6.5 481.0 31.0 1.0 6.5 12120.5 505.0 510.3 27 12640.0 12770.0 473.0 42.0 1.0 6.5 12247.5 479.0 36.0 1.0 6.5 12077.5 503.2 28 12600.0 I

I_________

MONTHLY TOTALS - UNIT 2 MONTHLY TOTALS - UNIT 1 Gross Generation: 299,230.0 MWhr Gross Generation: 353,810.0 MWhr 13,925.0 MWhr 14,577.0 MWhr Total Station Service:

Total Station Service: Net Generation: 285,305.0 MWhr 339,233.0 MWhr 424.6 MWe Net Generation: Average Daily Power:

504.8 MWe Average Daily Power:

41 In )

PBNP UNIT 1 CYCLE 27 FEBRUARY 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 27 TOTAL CYCLE AVERAGE 960. 9281. 29719.

REGION AVERAGE 126B 350. 3245. 39232.

127A 298. 2723. 44105.

127B 677. 6396. 46338.

128A 1129. 11084. 33001.

128B 1223. 12067. 31993.

129A 1299. 12375. 12375.

129B 1144. 11035. 11035.

CORE MWTHR 1018734. 9845042. 31 .525441.

DAYS IN PERIOD/CYCLE 28 291 POWER FACTOR 99.9% 92.8%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

PROJECTED EOL BURNUP 16044. 15564.

  • BASED ON DAYS REMAINING UNTIL REFUELING DATE ASSUMING PERIOD OR CYCLE POWER FACTOR
  • EFUELING SCHEDULE DATA .................................

SCHEDULED REFUELING DATE 9/14/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS 16285. 16200. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS BURNUP FOR CYCLE 27 (MWD/MTU) 203.9 201.4 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON REMAINING EFFECTIVE FULL POWER DAYS 57.0% 57.3% BASED ON CURRENT BORON FOLLOW RESULTS.

FRACTION OF CYCLE LIFE EXPENDED ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS 95.% 90.% 85.% 80.% 75.% 70.% 65.%

POWER FACTOR 100.%

9/29/2002 10,'10/2002 10/23/2002 ii/ 7/2002 11/24/2002 12/13/2002 1/ 4/2003 TEN PPM BORON DATE 9/18/2002 10/ 1/2002 10,/13/2002 10/26/2002 11/10/2002 11/27/2002 12/17/2002 1/ 8/2003 DESIGN BURNUP DATE 9/20/2002

PBNP UNIT 2 CYCLE 25 FEBRUARY 2002 BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 25 TOTAL 804. 14373. 33528.

CYCLE AVERAGE REGION AVERAGE 223D 263. 4239. 47998.

224A 234. 3775. 39080.

225A 538. 9299. 38340.

225B 338. 5633. 43302.

226A 857. 15313. 43524.

226B 969. 17705. 41283.

227A 1032. 18510. 18510.

227B 902. 16257. 16257.

CORE MWTHR 858085. 15348266. 35804093.

DAYS IN PERIOD/CYCLE 28 439 POWER FACTOR 84.1% 95.9% "* BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

15607. 15780. "* BASED ON DAYS REMAINING UNTIL REFUELING DATE PROJECTED EOL BURNUP ASSUMING PERIOD OR CYCLE POWER FACTOR REFUELING SCHEDULE DATA ............................

SCHEDULED REFUELING DATE 4/13/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS 16660. 16660. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS BURNUP FOR CYCLE 25 (MWD/MTU) 67.0 67.0 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON REMAINING EFFECTIVE FULL POWER DAYS 86.3% 86.3% BASED ON CURRENT BORON FOLLOW RESULTS.

FRACTION OF CYCLE LIFE EXPENDED FACTORS ESTIMATED D1LTE FOR DESIC,N AND TEN PPM BURNUPS ASSUMING VARIOUS POWER 95.% 90.% 85.% 80.% 75.% 70.% 65.%

POWER FACTOR 100.%

5/10/2002 5/14/2002 5/18/2002 5/23/2002 5/29/2002 6/ 4/2002 6/12/2002 TEN PPM BORON DATE 5/ 7/2002 5/10/2002 5/14/2002 5/18/2002 5/23/2002 5/29/2002 6/ 4/2002 6/12/2002 DESIGN BURNUP DATE 5/ 7/2002

Page 1 of I Shift Operation Data February,2002 I Unit 1 i_ _ _I II

_r Unit2 Il IDayfl[!rsfl GeF0 fX4GnX2~x0X27 3- 4-5686.- 5.0 F4 ][E]

"[-*'I* * * *7323.0 [ 34.

W[ 2411 1is II24]12*016=.1

  • 0 * =7. 1**014*013.1* 0 16o.

I1* *11,24] .1* *0 - :*0

  • 34. 613. 6=.1,*oF . 1 F117 241140 ]10 .!m 10154 .1 169106* .1* .l *o I,= .

WE124][

F131 124]167.1*6.12810

  • 47. 1607014 5017.1680 164.

51F9[24]148ol~~ 1294o

  • 44. 1=4.1*=.1*.l *o 1* .

I-59 1242 I]49. *0182 .1*54 .11150 1128 0149019 . 680 166 .

I"F 1450

  • 1 96].11210158.11570 2 1,* *014,010 .1680 6 1*668.0 2930197.!668o147o16. I*..

7 24 1F24] 50106.165.1326054 01*6oo14 .1**o 6 . ,~

F-84 24]I= oo26z12050326054z 1,4 I I111*ol L84601*123zo 2 10 .1460*001 . 16682.0 6185.014170166.05688.0 62.

FI"* 241152.l],3o1 l . 3% .

  • 6390I .1* °1 . .

["0"lF24 I== .1=*=o212o332o

  • 63o.164ý174o]68o 1,*.

F""l 24 I1* .1=*o=

F2-1] 24]I *=°1=

. 00. ** 635.142017.1 80 I,

=161.l488o

  • 65lO144o19~15%o I *..

https://www.surfn-nuclear.com/wepco/cgi-bin/divers/generation/generation-meter.cgi?action= 3/1/2002

Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0021 GL 97-02 March 15, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of February 2002.

Sincere~ly, T. J. Webb Regulatory Affairs Manager KMD Attachment cc
J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0021 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated March 15, 2002 Re: Monthly Operating Report -February 2002

DOCKET NO. 50-266 OPERATING DATA REPORT DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 920-755-6,862 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES
2. REPORTING PERIOD: February - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 530.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 510.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE 672.0 1,416.0 274,511.0

11. HOURS IN REPORTING PERIOD 1,416.0 225,025.8 672.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 667.3 0.0
13. REACTOR RESERVE SHUTDOWN HOURS 1,416.0 221,510.0 672.0
14. HOURS GENERATOR ONLINE 0.0 846.9 0.0
15. UNIT RESERVE SHUTDOWN HOURS 316,149,712.0 1,018,734.0 2,147,261.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 746,020.0 107,288,120.0 353,810.0
17. GROSS ELECTRICAL ENERGY GENERATED 102,290,819.5 339,233.0 715,299.5
18. NET ELECTRICAL ENERGY GENERATED (MWH) 100.0% 80.7%

100.0%

19. UNIT SERVICE FACTOR 100.0% 81.0%

100.0%

20. UNIT AVAILABILITY FACTOR 99.1% 76.2%

99.0%

21. UNIT CAPACITY FACTOR (USING MDC NET) 98.1% 74.7%

98.0%

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 4.4%

0.0%

23. UNIT FORCED OUTAGE RATE DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/01/02 COMPLETED BY: Kim M. Duescher MONTH FEBRUARY - 2002 TELEPHONE: 920-755-6862 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 11 506 21 504 1 509 12 504 22 505 2 504 13 501 23 504 3 506 14 510 24 506 4 510 15 504 25 506 5 499 16 507 26 504 6 502 17 503 27 505 7 498 18 506 28 503 8 508 9 506 19 506 10 503 20 506

OPERATING DATA REPORT DOCKET NO. 50-301 DATE: 03/12/02 COMPLETED BY: Kim M. Locke TELEPHONE: 920-755-6,420 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
2. REPORTING PERIOD: February - 2002
3. LICENSED THERMAL POWER (MWT): 1,518.5
4. NAMEPLATING RATING (GROSS MWE): 537.7
5. DESIGN ELECTRICAL RATING (NET MWE): 515.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 532.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, (IF ANY):

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 672.0 1,416.0 259,296.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 611.3 1,355.3 219,136.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ONLINE 600.3 1,344.3 216,198.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 858,085.0 1,986,742.0 312,035,159.0
17. GROSS ELECTRICAL ENERGY GENERATED 299,230.0 690,320.0 106,418,360.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 285,305.0 660,267.5 101,443,774.5
19. UNIT SERVICE FACTOR 89.3% 94.9% 83.4%
20. UNIT AVAILABILITY FACTOR 89.3% 94.9% 83.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) 82.9% 91.1% 79.8%
22. UNIT CAPACITY FACTOR (USING DER NET) 82.4% 90.5% 78.4%
23. UNIT FORCED OUTAGE RATE 10.7% 5.1% 2.2%

"DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED MAY 15, 1997

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/01/02 COMPLETED BY: Kim M. Duescher MONTH FEBRUARY - 2002 TELEPHONE: 920-755-6862 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 11 513 21 511 1 494 12 512 22 366 2 210 13 509 23 0 3 215 14 512 24 0 4 496 15 511 25 3 5 508 16 515 26 413 6 511 17 510 27 511 7 512 18 513 28 510 8 512 514 19 514 9

10 514 20 514

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 755-6862 REPORTING PERIOD: February 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method 1 Manual A. Equipment Failure (Explain) 2 Manual Trip/Scram B. Maintenance or Test 3 Automatic Trip/Scram C. Refueling D. Regulatory Restriction 4. Continuation

5. Other (Explain)

E. Operator Training/license Examination F .Administrative G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of February was 504.81 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 03/01/02 COMPLETED BY: Kim M. Duescher TELEPHONE: 755-6862 REPORTING PERIOD: February 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS 1 02/01/02 SCHEDULED 0 B 5 Unit 2 power reduction from full power to 50%

for condenser water box inspection and cleaning in accordance with OP-3A 2 02/22/02 FORCED 72 D 1 Unit 2 shutdown was required due to 2P-15B SI Pump not being returned to service within the required completion time of TSAC 3.5.2A.

(1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of February was 475.5 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - FEBRUARY 2002 ELECTRICAL UNITS MONTH YEAR CUMULATIVE MWH 299,230.0 690,320.0 106,418,360.0 GROSS GENERATION 30,052.5 4,974,585.5 MWH 13,925.0 TOTAL STATION SERVICE 660,267.5 101,443,774.5 MWH 285,305.0 NET OUTPUT 487.5 410.4 MWH 445.3 AVG. GROSS GENERATION FOR MONTH 513.5 492.2 MWH 498.5 AVG. GROSS GENERATION RUNNING 4.4% 4.7%

4.7%

TOTAL STATION SERVICE/GROSS GEN. 1,344.3 216,198.5 HRS 600.3 HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.25% 33.23% 32.51%

NET PLANT EFFICIENCY 10,268.9 10,497.4 BTU/KWH 10,264.2 NET PLANT HEAT RATE 28 59 9,149 DAYS NUMBER OF DAYS OF OPERATION 91.1% 79.8%

82.9%

UNIT NET CAPACITY FACTOR 94.9% 83.4%

89.3%

UNIT SERVICE FACTOR 0 92 0

SCHEDULED OUTAGES 1 1 59 FORCED OUTAGES 71.7 4,901.0 HRS 71.7 FORCED OUTAGE HOURS 5.1% 2.2%

10.7%

UNIT FORCED OUTAGE RATE UNITS MONTH YEAR CUMULATIVE NUCLEAR 1,355.3 219,136.9 HRS 611.3 HOURS CRITICAL 1,416.0 259,296.0 HRS 672.0 TOTAL HOURS POSSIBLE 0 50 0

INADVERTANT REACTOR TRIPS 60.7 40,159.1 HRS 60.7 DURATION OF REACTOR DOWN TIME 92.4% 79.3%

84.1%

REACTOR CAPACITY FACTOR 95.7% 84.5%

91.0%

REACTOR SERVICE FACTOR 1,986,742.0 312,035,159.0 MWTHR 858,085.0 THERMAL POWER GENERATED THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 15,348,266.0

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - FEBRUARY 2002 UNITS MONTH YEAR CUMULATIVE ELECTRICAL 746,020.0 107,288,120.0 MWH 353,810.0 GROSS GENERATION 14,577.0 30,720.5 4,997,300.5 MWH TOTAL STATION SERVICE 339,233.0 715,299.5 102,290,819.5 MWH NET OUTPUT 526.5 526.9 390.8 MWH AVG. GROSS GENERATION FOR MONTH 526.5 526.9 484.3 MWH AVG. GROSS GENERATION RUNNING 4.1% 4.1% 4.7%

TOTAL STATION SERVICE/GROSS GEN. 672.0 1,416.0 221,510.0 HRS HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.31% 32.36%

33.30%

NET PLANT EFFICIENCY 10,244.8 10,547.8 BTU/KWH 10,248.7 NET PLANT HEAT RATE 28 59 10,111 DAYS NUMBER OF DAYS OF OPERATION 99.0% 99.1% 76.2%

UNIT NET CAPACITY FACTOR 100.0% 100.0% 80.7%

UNIT SERVICE FACTOR 0 0 126 SCHEDULED OUTAGES 0 0 73 FORCED OUTAGES 0.0 0.0 10,227.1 FORCED OUTAGE HOURS HRS 0.0% 0.0% 4.4%

UNIT FORCED OUTAGE RATE MONTH YEAR CUMULATIVE NUCLEAR UNITS 225,025.8 HRS 672.0 1,416.0 HOURS CRITICAL 672.0 1,416.0 274,511.0 HRS TOTAL HOURS POSSIBLE 0 0 57 INADVERTANT REACTOR TRIPS 0.0 0.0 49,569.2 HRS DURATION OF REACTOR DOWN TIME 99.8% 99.9% 75.8%

REACTOR CAPACITY FACTOR 100.0% 100.0% 82.0%

REACTOR SERVICE FACTOR 1,018,734.0 2,147,261.0 316,149,712.0 MWTHR THERMAL POWER GENERATED MWTHR 1,018,734.0 THERMAL POWER GENERATED THIS FUEL CYCLE

POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

February, 2002 un.t Unit 1 vAAn Unitvna 2 V1ý7 MT v IT I DAY Gen X02 X04 X08 X27 Net Mwnr Avg Mwe i Gen .. Net Mk"-. M..

12215.5 509.0 12380.0 474.0 38.0 1.5 6.0 11860.5 494.2 1 12740.0 480.0 37.0 1.5 6.0 418.0 41.0 1.0 5.5 5044.5 210.2 38.0 1.0 5.5 12090.5 503.8 5510.0 2 12610.0 475.0 41.0 1.0 6.5 5162.5 215.1 6.5 12140.5 505.9 5630.0 419.0 3 12660.0 478.0 34.0 1.0 6.5 11915.5 496.5 509.9 12440.0 473.0 44.0 1.0 480.0 36.0 1.0 6.5 12236.5 12187.5 507.8 4 12760.0 475.0 30.0 1.0 6.5 35.0 1.0 6.5 11968.5 498.7 12700.0 5 12490.0 479.0 36.0 1.0 5.5 12265.5 511.1 5.5 12040.5 501.7 12780.0 472.0 6 12560.0 478.0 35.0 1.0 1.0 6.0 12290.0 512.1 497.5 12800.0 465.0 38.0 487.0 35.0 1.0 6.0 11941.0 512.0 7 12470.0 12800.0 465.0 40.0 1.0 5.5 12288.5 468.0 34.0 1.0 5.5 12201.5 508.4 513.8 8 12710.0 466.0 37.0 1.0 5.0 12331.0 33.0 1.0 5.0 12143.0 506.0 12840.0 9 12660.0 478.0 41.0 1.0 6.0 12325.0 513.5 6.0 12070.0 502.9 12840.0 467.0 12590.0 478.0 35.0 1.0 5.5 12314.5 513.1 10 506.1 12830.0 468.0 41.0 1.0 483.0 35.0 1.0 5.5 12145.5 12278.0 511.6 11 12670.0 467.0 38.0 1.0 6.0 35.0 1.0 6.0 12097.0 504.0 12790.0 12 12620.0 481.0 467.0 40.0 1.0 6.0 12216.0 509.0 34.0 1.0 6.0 12029.0 501.2 12730.0 13 12550.0 480.0 40.0 1.0 5.5 12278.5 511.6 5.5 12229.5 509.6 12790.0 465.0 14 12750.0 479.0 35.0 1.0 5.5 12268.5 511.2 504.3 12780.0 466.0 39.0 1.0 12620.0 478.0 33.0 1.0 5.5 12102.5 12350.5 514.6 15 12860.0 468.0 35.0 1.0 5.5 479.0 34.0 1.0 5.5 12170.5 507.1 510.0 16 12690.0 465.0 39.0 1.0 5.5 12239.5 34.0 1.0 5.5 12081.5 503.4 12750.0 17 12600.0 478.0 36.0 1.0 5.5 12320.5 513.4 1.0 5.5 12139.5 505.8 12830.0 467.0 18 12660.0 479.0 35.0 1.0 5.5 12328.5 513.7 505.9 12840.0 468.0 37.0 480.0 33.0 1.0 5.5 12140.5 12326.5 513.6 19 12660.0 12840.0 469.0 38.0 1.0 5.5 34.0 1.0 5.5 12149.5 506.2 511.4 20 12670.0 480.0 472.0 39.0 1.0 5.5 12272.5 35.0 1.0 5.5 12107.5 504.5 12790.0 21 12630.0 481.0 117.0 1.0 7.0 8780.0 365.8 1.0 7.0 12126.0 505.2 9260.0 355.0 22 12650.0 482.0 34.0 1.0 5.5 -408.5 -17.0 12099.5 504.1 0.0 0.0 402.0 12620.0 480.0 34.0 1.0 5.5 -400.5 -16.7 23 0.0 0.0 399.0 0.5 1.0 479.0 34.0 0.5 1.0 12135.5 505.6 2.7 24 12650.0 53.0 320.0 1.0 11.0 65.0 1.0 11.0 12133.0 505.5 450.0 25 12660.0 481.0 34.0 1.0 6.0 9904.0 412.7 12101.0 504.2 10410.0 450.0 49.0 12620.0 479.0 33.0 1.0 6.0 12253.5 510.6 26 12790.0 478.0 51.0 1.0 6.5 481.0 31.0 1.0 6.5 12120.5 505.0 510.3 27 12640.0 12770.0 473.0 42.0 1.0 6.5 12247.5 479.0 36.0 1.0 6.5 12077.5 503.2 28 12600.0 I

I_________

MONTHLY TOTALS - UNIT 2 MONTHLY TOTALS - UNIT 1 Gross Generation: 299,230.0 MWhr Gross Generation: 353,810.0 MWhr 13,925.0 MWhr 14,577.0 MWhr Total Station Service:

Total Station Service: Net Generation: 285,305.0 MWhr 339,233.0 MWhr 424.6 MWe Net Generation: Average Daily Power:

504.8 MWe Average Daily Power:

41 In )

PBNP UNIT 1 CYCLE 27 FEBRUARY 2002 - BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 27 TOTAL CYCLE AVERAGE 960. 9281. 29719.

REGION AVERAGE 126B 350. 3245. 39232.

127A 298. 2723. 44105.

127B 677. 6396. 46338.

128A 1129. 11084. 33001.

128B 1223. 12067. 31993.

129A 1299. 12375. 12375.

129B 1144. 11035. 11035.

CORE MWTHR 1018734. 9845042. 31 .525441.

DAYS IN PERIOD/CYCLE 28 291 POWER FACTOR 99.9% 92.8%

  • BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

PROJECTED EOL BURNUP 16044. 15564.

  • BASED ON DAYS REMAINING UNTIL REFUELING DATE ASSUMING PERIOD OR CYCLE POWER FACTOR
  • EFUELING SCHEDULE DATA .................................

SCHEDULED REFUELING DATE 9/14/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS 16285. 16200. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS BURNUP FOR CYCLE 27 (MWD/MTU) 203.9 201.4 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON REMAINING EFFECTIVE FULL POWER DAYS 57.0% 57.3% BASED ON CURRENT BORON FOLLOW RESULTS.

FRACTION OF CYCLE LIFE EXPENDED ESTIMATED DATE FOR DESIGN AND TEN PPM BURNUPS ASSUMING VARIOUS POWER FACTORS 95.% 90.% 85.% 80.% 75.% 70.% 65.%

POWER FACTOR 100.%

9/29/2002 10,'10/2002 10/23/2002 ii/ 7/2002 11/24/2002 12/13/2002 1/ 4/2003 TEN PPM BORON DATE 9/18/2002 10/ 1/2002 10,/13/2002 10/26/2002 11/10/2002 11/27/2002 12/17/2002 1/ 8/2003 DESIGN BURNUP DATE 9/20/2002

PBNP UNIT 2 CYCLE 25 FEBRUARY 2002 BURNUP SYNOPSIS & REFUELING SCHEDULING DATA BURNUP DATA IN MWD/MTU THIS TOTAL PERIOD CYCLE 25 TOTAL 804. 14373. 33528.

CYCLE AVERAGE REGION AVERAGE 223D 263. 4239. 47998.

224A 234. 3775. 39080.

225A 538. 9299. 38340.

225B 338. 5633. 43302.

226A 857. 15313. 43524.

226B 969. 17705. 41283.

227A 1032. 18510. 18510.

227B 902. 16257. 16257.

CORE MWTHR 858085. 15348266. 35804093.

DAYS IN PERIOD/CYCLE 28 439 POWER FACTOR 84.1% 95.9% "* BASED ON NUMBER OF DAYS IN PERIOD OR CYCLE.

15607. 15780. "* BASED ON DAYS REMAINING UNTIL REFUELING DATE PROJECTED EOL BURNUP ASSUMING PERIOD OR CYCLE POWER FACTOR REFUELING SCHEDULE DATA ............................

SCHEDULED REFUELING DATE 4/13/2002 DESIGN TEN PPM NOTE: DESIGN BURNUP IS THE END OF CYCLE BURNUP THAT WAS 16660. 16660. USED IN THE FINAL CORE DESIGN. TEN PPM BURNUP IS BURNUP FOR CYCLE 25 (MWD/MTU) 67.0 67.0 THE CORE AVERAGE BURNUP PROJECTED AT TEN PPM BORON REMAINING EFFECTIVE FULL POWER DAYS 86.3% 86.3% BASED ON CURRENT BORON FOLLOW RESULTS.

FRACTION OF CYCLE LIFE EXPENDED FACTORS ESTIMATED D1LTE FOR DESIC,N AND TEN PPM BURNUPS ASSUMING VARIOUS POWER 95.% 90.% 85.% 80.% 75.% 70.% 65.%

POWER FACTOR 100.%

5/10/2002 5/14/2002 5/18/2002 5/23/2002 5/29/2002 6/ 4/2002 6/12/2002 TEN PPM BORON DATE 5/ 7/2002 5/10/2002 5/14/2002 5/18/2002 5/23/2002 5/29/2002 6/ 4/2002 6/12/2002 DESIGN BURNUP DATE 5/ 7/2002

Page 1 of I Shift Operation Data February,2002 I Unit 1 i_ _ _I II

_r Unit2 Il IDayfl[!rsfl GeF0 fX4GnX2~x0X27 3- 4-5686.- 5.0 F4 ][E]

"[-*'I* * * *7323.0 [ 34.

W[ 2411 1is II24]12*016=.1

  • 0 * =7. 1**014*013.1* 0 16o.

I1* *11,24] .1* *0 - :*0

  • 34. 613. 6=.1,*oF . 1 F117 241140 ]10 .!m 10154 .1 169106* .1* .l *o I,= .

WE124][

F131 124]167.1*6.12810

  • 47. 1607014 5017.1680 164.

51F9[24]148ol~~ 1294o

  • 44. 1=4.1*=.1*.l *o 1* .

I-59 1242 I]49. *0182 .1*54 .11150 1128 0149019 . 680 166 .

I"F 1450

  • 1 96].11210158.11570 2 1,* *014,010 .1680 6 1*668.0 2930197.!668o147o16. I*..

7 24 1F24] 50106.165.1326054 01*6oo14 .1**o 6 . ,~

F-84 24]I= oo26z12050326054z 1,4 I I111*ol L84601*123zo 2 10 .1460*001 . 16682.0 6185.014170166.05688.0 62.

FI"* 241152.l],3o1 l . 3% .

  • 6390I .1* °1 . .

["0"lF24 I== .1=*=o212o332o

  • 63o.164ý174o]68o 1,*.

F""l 24 I1* .1=*o=

F2-1] 24]I *=°1=

. 00. ** 635.142017.1 80 I,

=161.l488o

  • 65lO144o19~15%o I *..

https://www.surfn-nuclear.com/wepco/cgi-bin/divers/generation/generation-meter.cgi?action= 3/1/2002