NLS2002034, NRC Rule on Property Insurance - 10 CFR 50.54(w)(3)

From kanterella
Revision as of 10:29, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Rule on Property Insurance - 10 CFR 50.54(w)(3)
ML020920113
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/26/2002
From: Denise Wilson
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2002034
Download: ML020920113 (3)


Text

H Nebraska Public Power District Nebraska's Energy Leader NLS2002034 50.54(w)(3)

March 26, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Gentlemen:

Subject:

NRC Rule on Property Insurance - 10 CFR 50.54(w)(3)

Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 The purpose of this letter is to comply with the property insurance reporting requirements of 10 CFR 50.54(w)(3) on property insurance coverage. The following list provides the required information detailing the property insurance coverage maintained by Nebraska Public Power District (NPPD) and MidAmerican Energy Company for Cooper Nuclear Station at Brownville, Nebraska.

Type of Coverage Policy Policy Insurer Expiration Amount of

__ ___- -holder Number Date Coverage Primary Nuclear Property NPPD P01-070 NEIL 4/1/02 $250,000,000 Insurance part of

$500,000,000 MEC P01-070-2 NEIL 4/1/02 $250,000,000 part of

$500,000,000 Decontamination Liability, NPPD XO1-086 NEIL 4/1/02 $1,125,000,000 Decommissioning Liability, and part of Excess Nuclear Property Insurance $2,250,000,000 MEC X01-071 NEIL 4/1/02 $1,125,000,000 part of

$2,250,000,000 Total _$2,750,000,000 Cooper Nuclear Station Vý001 P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http://www.nppd.com

NLS2002034 Page 2 The coverage depicted in the above table expires on April 1, 2002. This coverage is renewed effective April 1, 2002, for the period of April 1, 2002, to April 1, 2003.

If you should have any questions or should require any additional information, please advise.

Sincerely, D. L. Wilson Vice President - Nuclear

/nr cc: Regional Administrator USNRC - Region 1V Senior Project Manager USNRC - NRR Project Directorate IV- 1 Senior Resident Inspector Cooper Nuclear Station G. L. Vanek, R. W. Beck and Associates S. E. Verbeski, AON Risk Services for MidAmerican Energy Company D. M. Blatchford NPG Distribution

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS Correspondence Number: NLS2002034 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or planned actions by the District. They are described for information only and are not regulatory commitments.

Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None i

t t

1*

i1 i

-t i

I PROCEDURE 0.42 1 REVISION 10 1 PAGE 12 OF 14