JAFP-02-0164, July 2002 Monthly Operating Report for James A. FitzPatrick

From kanterella
Revision as of 23:43, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
July 2002 Monthly Operating Report for James A. FitzPatrick
ML022320641
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/12/2002
From: Ted Sullivan
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-02-0164
Download: ML022320641 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A Ftzpatrick NPP Entergy P.O. Box 110 Lycoming. NY 13093 Tel 315 349 6024 Fax 315 349 6480 TA. Sullivan Vice President, Operations-JAF August 12, 2002 JAFP-02-0164 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station O-PI-17 Washington, D. C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Monthly Operating Report

Dear Sir:

Enclosed is the Monthly Operating Report for the James A. FitzPatrick Nuclear Power Plant for the month of July 2002.

If there are any questions concerning this report, please contact Sherard Anderson, Thermal Performance Engineer, (315) 349-6558.

TAS:BO:SB:SA:tmb Enclosure

Cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail stop OWFN 8C2 Washington, DC 20555 Mr. R. Toole ENN BWR SRC Operations Subcommittee Chairman 605 West Homer Street Ebensburg, PA 15931 JENG JAFP Files RMS (JAF)

RMS (WPO)

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JULY 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: August 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATING STATUS I. Unit name: FitzPatrick

2. Reporting period: 7/01/2002 - 7/31/2002
3. Licensed thermal power (MWT): 2536
4. Nameplate rating (gross MWE): 883.0
5. Design electrical rating (net MWE): 816
6. Maximum dependable capacity (gross MWE): 839
7. Maximum dependable capacity (net MWE): 813
8. If changes occur in capacity ratings (Items 3-7) since last report, give reasons:
9. Power level to which restricted, if any (net MWE):
10. Reasons for restrictions, if any:

NO. DATA REQUESTED THIS YR-TO-DATE CUMULATIVE MONTH 11 Hours in reporting period: 744 5,087 236,783 12 Number of hours reactor was critical: 744 5,049.7 178,209.8 13 Reactor reserve shutdown hours: 0.00 0.00 0.00 14 Hours generator on-line: 744 5,019.1 173,040.9 15 Unit reserve shutdown hours: 0.00 0.00 0.00 16 Gross thermal energy generated (MWH): 1,882,429.9 12,553,472.1 394,282,981.7 17 Gross electrical energy generated (MWH): 629,300 4,283,580 133,363,720 18 Net electrical energy generated (MWH): 608,670 4,146,585 128,491,355 19 Unit service factor: 100 98.66 73.08 20 Unit availability factor: 100 98.66 73.08 21 Unit capacity factor (using MDC net): 100.63 100.26 74.73 22 Unit capacity factor (using DER net) 100.26 99.89 66.50 23 Unit forced outage rate: 0.00 0.00 11.02 L ____________________________ £

24. Shutdowns scheduled over next 6 months (type, date, and duration of each): Refuel Outage 15 October 7, 2002
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): FORECAST ACHIEVED Initial Criticality:

Initial Electricity:

Commercial Operation:

ENTERGY NUCLEAR NORTHEAST JAMES A. FITZPATRICK NUCLEAR POWER PLANT OPERATING DATA REPORT REPORT MONTH: JULY 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: August 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 DAY NET AVERAGE DAILY DAY NET AVERAGE DAILY POWER LEVEL POWER LEVEL 1 824 17 816 2 823 18 814 3 821 19 813 4 814 20 813 5 816 21 816 6 816 22 813 7 816 23 813 8 816 24 823 9 817 25 834 10 816 26 831 11 816 27 823 12 815 28 822 13 818 29 818 14 818 30 817 15 817 31 815 16 819

REPORT MONTH: JULY 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: August 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 NO. DATE TYPE DURATION REASON METHOD OF LICENSEE SYSTEM COMPONENT CAUSE and CORRECTIVE HOURS SHUTTING EVENT CODE CODE ACTION TO PREVENT DOWN THE REPORT RECURRENCE REACTOR NO.

L .i. I.

F: FORCED REASON: METHOD: EXHIBIT G: Instructions for preparation of S: SCHEDULED A. Equipment failure (explain) 1. Manual data entry sheets for Licensee Event Report B. Maintenance or Test 2. Manual Scram (LER) file (NUREG-0161)

C. Refueling 3. Automatic Scram D. Regulatory Restriction 4. Continued E. Operator training and license examination 5. Reduced load F. Administrative 9. Other G. Operational error (explain)

H. Other (explain)

REPORT MONTH: JULY 2002 Docket No.: 50-333 Unit Name: FitzPatrick Date: August 8, 2002 Completed By: S. Anderson Telephone: (315)349-6558 OPERATIONAL

SUMMARY

The FitzPatrick plant - with the exception of minor derates for rod adjustments - operated at or near rated power for the duration of the month of July 2002.