ML022540610

From kanterella
Revision as of 16:42, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Prairie Island, Continuation of Predecisional Enforcement Conference
ML022540610
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/11/2002
From: Lanksbury R
NRC/RGN-III/DRP/RPB5
To:
References
EA-02-068
Download: ML022540610 (4)


Text

September 11, 2002 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS NOT OPEN TO PUBLIC ATTENDANCE Name of Licensee: Nuclear Management Company, LLC Name of Facility: Prairie Island Nuclear Generating Plant EA Number: EA-02-068 Docket Nos.: 50-282, 50-306 Date and Time of Meeting: Tuesday, September 17, 2002, 1:00 p.m. - 3:00 p.m. (CDT)

Location of Meeting: NRC Region III Office 801 Warrenville Rd.

Lisle, IL 60532 Purpose of Meeting: Continuation of a predecisional enforcement conference to discuss apparent violations of the NRC requirement to provide complete and accurate information related to the April 13, 2001, request for a Notice of Enforcement Discretion for the D6 emergency diesel generator and the subsequent NRC special inspection in May 2001. A licensee engineer who was not able to attend the predecisional enforcement conference on August 2, 2002, will be providing his perspective on the issues.

Category: This meeting is closed to the public because it is based on the finding of an Office of Investigations report that has not been publicly disclosed. The ADAMS accession number of the letter describing the apparent violations is ML021140236.

NRC Attendees:

G. Grant, Director, Division of Reactor Projects Others as designated Licensee Attendees:

M. Nazar, Site Vice-President, Prairie Island Others as designated

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel at Region III, other than those listed above, should be made known to Michael Kunowski by telephone at 630/829-9618 or e-mail at MAK3 by COB September 16, 2002.

Approved by: /RA/

Roger D. Lanksbury, Chief Branch 5 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

B. W. Sheron, Associate Director for Projects Licensing and Technical Review, NRR J. Zwolinski, Director, Division of Licensing and Project Management, NRR G. Tracy, Chief, Division of Inspection Program Management, IOLB, NRR H. Nieh, Region III Coordinator, OEDO S. Bajwa, Project Directorate, Division of Licensing and Project Management, NRR J. Lamb, Division of Licensing and Project Management, NRR D. Spalding, Division of Licensing and Project Management, NRR T. Kim, Division of Licensing and Project Management, NRR S. Miranda, Division of Licensing and Project Management, NRR B. Mozafari, Division of Licensing and Project Management, NRR D. Hood, Division of Licensing and Project Management, NRR F. Congel, Director, OE J. Luehman, Deputy Director, OE J. Dixon-Herrity, Enforcement Specialist, OE L. Dudes, Enforcement Coordinator, NRR OEMAIL G. E. Grant, Director, Division of Reactor Projects, RIII S. A. Reynolds, Deputy Director, Division of Reactor Projects, RIII J. A. Grobe, Director, Division of Reactor Safety, RIII R. J. Caniano, Deputy Director, Division of Reactor Safety, RIII R. Lanksbury, Chief, Branch5, Division of Reactor Projects J. Lara, SRI, Kewaunee P. Krohn, SRI, Point Beach S. Ray, SRI, Prairie Island S. Burton, SRI, Monticello P. Prescott, SRI, Duane Arnold J. Lennartz, SRI, Palisades DRS Branch Chiefs (RNG, DEH, JMJ3, KXR)

R. M. Lickus, Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2)

J. Kweiser, ORA P. Buckley, ORA D. Holody, RI C. Evans, RII G. Sanborn, RIV H. B. Clayton, RIII K. Lambert, RIII