Riv Status of Fire Protection Inspections
ML040360411
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/14/2004
From:
NRC Region 4
To:
References
FOIA/PA-2003-0358
Download: ML040360411 (2)


Text

RIV STATUS OF FIRE PROTECTION INSPECTIONS Completed first round of FP Triennial Inspections in 2002 Completed second round of FP Triennials at 3 sites to date (DC, CGS, PV)

Early Focus/Findings (January 2000 - June 2001)

  • Separation of redundant trains in the same fire area (App R, III.G.2)
  • Redundant SSD equipment was free of fire damage (App R, III.G.2)
  • Fire protection features (detection, suppression)

Later Focus/Findings (June 200i to Present, Incorporated Lessons-learned)

  • Manual actions in lieu of ensuring SSD equipment is free of fire damage (III.G.2)
  • Alternative shutdown - timing of manual actions
  • Emergency communications
  • Select less risk significant areas - expect the issues to be of less risk significance
  • URI for manual actions in III.G.2 areas (pending licensing basis review)
  • URI for ASD timing issues (pending licensee actions)
  • APV for associated circuits r Manual Actions Findings (manual actions In lieu of meeting Il.G.2 requirements)
  • Early findings were processed as non-compliances using the SDP process.
  • Later findings were processed iaw IP 71111 .05T guidance (Green NCV if manual actions are reasonable and feasible)

Alternative Shutdown Findings (III.G.3)

  • Findings associated with the ability of operators to perform actions outside the control room within analyzed time constraints.
  • Findirf~s associated with the timing of ASD _lactionsJheejbentidh e regosg ions______________ ________
  • Findings associated with the adequacy and quality of ASD procedures.

... I Jt\7V D'cS )RITJ r In r~l.,, .; . , I; .. is 1.~. l 45 Any hr, '1i V !4 {

Associated Circuits/Multiple Hot Shorts/Mechanistic Damage Issues \ U 0

  • For these issues, we have opened 4 URIs and 2 APVs
  • Guidance coming in early Sept for NRC and in Oct for industry and public
  • mechanistic damage and multiple hot shorts issues?
  • definition of associated circuits vs. required circuits?
  • Begin inspections using the new guidance early next year?

Compensatory Measures

  • RIV reviews comp measures in place at the time of the inspections.
  • RIV inspectors perform walkdowns to verify that comp measures are in place, if necessary.
  • To date no findings of significance have been identified.
  • The licensee's FPP defines comp measures. Licensee's may change their FPP as long as it doesn't affect their ability to achieve and maintain SSD. .

Licensing Basis

  • Difficult and time-consuming for both the licensee and NRC to assemble the licensing basis. SERs not always clear wrt what exactly was reviewed and approved.
  • Understanding of the LB is time-consuming and sometimes controversial, requiring the region to consult with OGC.
  • At least one other region saves/files the LB of each plant during the first round, so that this does not need to be performed from scratch during subsequent triennials.

Would like to see

  • Resolution of Heymc issue
  • Definition of adversely affect (re: license condition that states that licensee's may make changes to their FPP as long as they do not adversely affect their ability to achieve and maintain SSD.)
  • Guidance on licensing basis - particularly if licensee submittals can be considered in determining the LB. Usually they are not listed as part of the FPP in the license condition.