ML023090393

From kanterella
Revision as of 02:39, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
September 2002 Exam 50-395/2002-301 Final Admin & Walk-through JPMs
ML023090393
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/13/2002
From: Ernstes M
Division Reactor Projects III
To: Byrne S
South Carolina Electric & Gas Co
References
50-395/02-301, ES-301, ES-301-1 50-395/02-301
Download: ML023090393 (138)


See also: IR 05000395/2002301

Text

ES-301 Administrative Topics Outline Form ES-301-1 (R8, S1)

Facility: ___Summer________________ Date of Examination: __9/9-13/02___

Examination Level (circle one): RO / SRO Operating Test Number: ___1_____

Administrative Describe method of evaluation:

Topic/Subject 1. ONE Administrative JPM, OR

Description 2. TWO Administrative Questions

A.1 Conduct of Review of License Operator Status Report to determine

Operations current active licenses. (Shift Turnover)

Conduct of Determine adequate shift manning

Operations

A.2 Equipment Evaluation of Surveillance Test results

Control

A.3 Radiation Determine personnel exposure limit for non-essential personnel

Control

A.4 Emergency Plan Classify an Emergency Plan Event

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM Admin A.1.a

REVIEW OF LICENSED OPERATOR STATUS REPORT TO

DETERMINE CURRENT ACTIVE LICENSES

APPROVAL: APPROVAL DATE:

REV NO: 0

CANDIDATE

EXAMINER:

SRO ONLY

THIS JPM IS APPROVED

TASK:

341-001-03-03 CONDUCT SHIFT AND RELIEF TURNOVER

TASK STANDARD:

Determine that not all the oncoming licensed operators have current active licenses.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

CLASSROOM PERFORM

REFERENCES:

TOOLS: SAP-200, Conduct of Operations, Attachment I

Watchstanding Authorization Report, (License Operators Status

Report)

C Shift September Schedule

EVALUATION TIME 10 TIME CRITICAL NO 10CFR55: 41b10

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Normal plant operations

Shift turnover is being conducted

INITIATING CUES: As the oncoming Shift Supervisor, perform step 2.c of Attachment 1, of

SAP-200, Conduct of Operations.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes Yes Perform SAP-200, Attachment I, Step 2.c. Review the Licensed Operator Status

Report and determine that not all oncoming

licensed operators have current licenses.

G. Ervin has called in sick, and the only

available replacement licensed operators

on-shift are B. Stroup (ABLL) and Bill

Davis (rover), both of whom failed the

most recent requalification exam and are

currently inactive. Examinee should

determine that a callout is required for G.

Ervin.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: Admin A.1.a

DESCRIPTION: REVIEW OF LICENSED OPERATOR STATUS REPORT TO DETERMINE CURRENT

ACTIVE LICENSES

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM Admin A.1.b

DETERMINE ADEQUATE SHIFT MANNING

APPROVAL: APPROVAL DATE:

REV NO: 0

CANDIDATE

EXAMINER:

SRO ONLY

THIS JPM IS APPROVED

TASK:

TASK STANDARD:

Complete review of the FEP manning sheet and identify that additional staffing is needed.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

CLASSROOM PERFORM

REFERENCES:

TOOLS: SAP-200, Conduct of Operations, Attachment I

C Shift September Schedule

FEP Manning Sheet

OPS Training Matrix

EVALUATION TIME 10 TIME CRITICAL NO 10CFR55: 41b10

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Normal plant operations

Shift turnover is being conducted

The Shift Test Specialist presents the FEP manning sheet to the Shift

Supervisor and requests assistance determining if staffing is adequate.

INITIATING CUES: As the oncoming Shift Supervisor, review the FEP manning sheet as

required by SAP-200.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes No Review the FEP Manning Sheet to determine Review FEP Manning Sheet and determine

shift manning. that additional staffing is needed. The

student must determine that the only

available option would be to move the

rover (Bill Davis) to the B NRO (CB

Operator watch) Bill Davis or B. Boyd can be used to

provide a qualified fire brigade leader.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: Admin A.1.b

DESCRIPTION: DETERMINE ADEQUATE SHIFT MANNING

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM Admin A.2

EVALUATION OF SURVEILLANCE TEST RESULTS

APPROVAL: APPROVAL DATE:

REV NO: 0

CANDIDATE

EXAMINER:

SRO ONLY

THIS JPM IS APPROVED

TASK:

342-026-03-02 REVIEW RESULTS OF SURVEILLANCE TESTS

TASK STANDARD:

Correctly determine that STP 205.004 does not pass the acceptance criteria.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

CLASSROOM SIMULATE

REFERENCES:

TOOLS: STP 205.004 and attached data sheets.

STTS

EVALUATION TIME 15 TIME CRITICAL NO 10CFR55: 41b8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: TS required surveillance has been completed on "B" RHR pump.

INITIATING CUES: You are the Control Room Supervisor and STP 205.004, RHR PUMP AND

VALVE OPERABILITY TEST, has been completed and given to you for

review. Determine if STP 205.004 meets the acceptance criteria..

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes Yes Review STP-205.004 Test Data. Determine that the Test Data does not

meet the acceptance criteria of

STP-205.004. Stroke time for MVG 8809B

exceeds maximum allowed stroke time,

which requires the valve to be declared

inoperable per the acceptance criteria of

STP 205.004. Return as forund valve

lineup has MVG 8706B restored to the

incorrect position.

The applicant recognize that the

Surveillance Test Task Sheet STTS No.

(0211867) did not match the STTS No. on

the STP-205.004 data sheets (0211197).

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: Admin A.2

DESCRIPTION: EVALUATION OF SURVEILLANCE TEST RESULTS

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM Admin A.3

DETERMINE PERSONNEL EXPOSURE LIMIT FOR

PERSONNEL

APPROVAL: APPROVAL DATE:

REV NO:

CANDIDATE

EXAMINER:

SRO ONLY

THIS JPM IS APPROVED

TASK:

TASK STANDARD:

The examinee correctly determines the exposure limit (same limitations as if not in a SAE).

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

CLASSROOM PERFORM

REFERENCES:

TOOLS: Personnel exposure record

HPP-153

EPP 20

EPP 1.3

EVALUATION TIME 15 TIME CRITICAL NO 10CFR55: 43b4

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None.

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The site is in a SAE due to an inability to establish any feedwater flow to

any SG's (LOCA greater than charging pump capacity with bleed and

feed initiated) and the actions of EOP 15.0 are currently in progress. The

OSC is in the process of being manned, but all building operators have not

been released to the OSC by the Shift Supervisor at this time. An

auxiliary operator from the operating shift is assisting with emergency

duties. He has worked at V.C. Summer for only 3 months and is interim

qualified IB. He previously worked at another nuclear plant for the first 6

months of the year (two quarters) and his exposure records have not

been obtained from his previous employer. HP has indicated that his NRC

Form 4 cannot be completed and verified until that information has been

obtained. His current exposure record at V.C. Summer is attached.

INITIATING CUES: The OSC Supervisor has requested that the Shift Supervisor, as IED,

authorize a verbal extension for the new operator to the federal

exposure limit as a planned dose using the limit specified in EPP 20,

Attachment III for all activities. Given the plant is in a SAE and the

personnel exposure history of the operator, determine the exposure limit

for the operator and if an extension is permissible..

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No No A. Determine if the normal Admin limits can be Step 3.2.1 of EPP-020 allows the IED/ED

Yes waived by EPP-020. to waive the normal administrative limits.

Yes No B. Determine limits for TEDE, TODE, LDE, SDE Correctly calculate exposure limit for

(WB), and SDE (ME). personnal. The examinee should

determine that the missing exposure

records for the first six months of the

year require a reduction in the annual

limits by 25% per quarter per HPP-153,

step 4.4. The examinee should also

determine that an extension is required

since the operator has already received

1000 mrem TEDE per HPP-153, step 4.7.

The limits are as follows per HPP-153:

TEDE (step 4.3.2) 4000 mrem per current

year x 50% = 2000 mrem - 1000 mrem

already received = 1000 mrem. TODE

(step 4.3.3) 40,000 mrem per current year

x 50% = 20,000 mrem - 200 mrem already

received = 19,800 mrem. LDE (step

4.3.4) 12,000 mrem per current year x

50% = 6,000 mrem - 0 mrem = 6,000

mrem. SDE, WB (step 4.3.5) 40,000 mrem

per current year x 50% = 20,000 mrem - 0

mrem = 20,000 mrem. SDE, ME (step

4.3.6) 40,000 mrem per current year x

50% = 20,000 mrem - 0 mrem = 20,000

mrem. An exposure extension cannot be

authorized per HPP-153, step 4.9, since

the current year occupational exposure is

not documented on an NRC Form 4 and

has not therefore been signed by the

effected individual to confirm the reported

values are correct.

Post Exam Note: This JPM was modified by the facility between NRC approval and the JPM administration. The

modification was not discussed with the NRC until just before it was to be administered. This change resulted in the

need to revise the critical step and expected action and eliminate the requirement to calculate any limits. The final

expected action follows:

Identify that Health Physics Procedure HPP-153, Administrative Exposure Limits, is superceded by Emergency Plan

Procedure EPP-020, Emergency Personnel Exposure Control, in an emergency. Correctly determine that a verbal

extension to an individuals administrative exposure limits can be suspended or modified verbally by the IED, Interim

Emergency Director, per Section 3.2 of EPP-020.

SAT UNSAT

Approved cue

The student may not calculate the exposure limit based on the fact that an

extension is not permissible per HPP-153. If the examinee correctly determines that

no extension can be granted, Ask them to determine the maximum exposure limit that

could be requested for the operators extension when the request was made per HPP-153.

Modified cue the day of the exam

The student may not calculate the exposure limit based on the fact that an extension is not permissible per

HPP-153. If the examinee correctly determines that no extension can be granted, ask them to determine the

maximum exposure that could be received by the operator based on exposure histrory (ie remaining exposure).

The student may also correctly determine that the normal admin limits may be waived by the IED per step 3.2.1

of EPP-020. If the student makes this determination, point out that step 4.2.2 requires a return to normal

exposure control per HPP-153 when conditions allow, and that conditions are such that these limits should be

utilized.

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

REFERENCE ALLOWED

QUESTION

ANSWER

CANDIDATE'S RESPONSE:

TIME:

REFERENCES:

JPM NO: Admin A.3

DESCRIPTION: DETERMINE PERSONNEL EXPOSURE LIMIT FOR PERSONNEL

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM Admin A.4

CLASSIFY EMERGENCY PLAN EVENT

APPROVAL: APPROVAL DATE:

REV NO: 0

CANDIDATE

EXAMINER:

SRO ONLY

THIS JPM IS APPROVED

TASK:

344-019-03-02 CLASSIFY EMERGENCY EVENTS REQUIRING EMERGENCY PLAN

IMPLEMENTATION

TASK STANDARD:

Emergency classification evaluated as an ALERT based on one of the following;

281 ONGOING SEVERE SECURITY THREAT

292 MANMADE PHENOMENON

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES:

TOOLS: EPP-001

EVALUATION TIME 10 TIME CRITICAL No 10CFR55: 45(a)11

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Severe weather warnings for the site.

The plant was at 100% power prior to the event.

An armed intrusion is in progress.

The RWST has been destroyed by an explosion.

INITIATING CUES: Classify the event per EPP-001 and indicate the basis for the

classification.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes No Evaluates plant conditions and classifies and Determines ALERT Emergency Action

Provides the basis for each event PER EPP-001 Level based on 281 or AND 292.

281 - Alert, Security safeguards contingency event

which results in adversaries commandeering an area

of the plant, but not impacting shutdown capability.

292 - Alert, Known explosion at facility resulting in

major damage to plant structures or equipment. For

onsite explosion: Observation of damage by

explosion.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: Admin A.4

DESCRIPTION: CLASSIFY EMERGENCY PLAN EVENT

IC SET:

INSTRUCTIONS:

COMMENTS:

ES-301 Control Room Systems Form ES-301-2 (R8, S1)

and Facility Walk-Through Test Outline

System / JPM Title Type Code* Safety

Function

a. Transfer to Cold Leg Reciriculation JPS-5 DS 3

b. Loss of Intermediate Range Instrumentation JPS-029 LDS 7

c. Stuck Rod JPS-043 DS 1

d. Identify and isolate RCS leak to CCWS JPS-042 DS 8

e. Response to imminent pressurized thermal shock NS 4P

JPS-93

f. Manually initiate Reactor Building Spray JPSF-019 AS 5

g. Transfer in-service charging pump (NRC) JPSF-046 DAS 2

a. Locally start an Emergency D/G during a loss of offsite DA 6

power (with Failure of field to flash) JPPF-012

b. Control Room evacuation (duties of BOP operator) M 8

(Modified JPPF-049)

c. Establish Demineralizer Water Alternate cooling to DAR 1

Charging Pumps (Failure of Chilled Water Supply)

(New JPPF-NRC)

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol

room, (S)imulator, (L)ow-Power, (R)CA

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO JPS-005

TRANSFER TO COLD LEG RECIRCULATION

APPROVAL: DOW APPROVAL DATE: 6/20/2002

REV NO: 9

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-136-05-01 TRANSFER RHR FROM COLD LEG INJECTION TO COLD LEG RECIRCULATION

TASK STANDARD:

ECCS is shifted from Cold Leg Injection to Cold Leg Recirculation without losing suction to the RHR,

RB Spray, or Charging pumps or dead-heading a charging pump. Trains are split to remove

vulnerability to passive failure.Train "A" is aligned for Hot Leg Recirc.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: EOP-2.2

TOOLS:

EVALUATION TIME 20 TIME CRITICAL NO 10CFR55: 45(a)7

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The plant has tripped and Safety Injected from 100% due to a DBA LOCA.

CCW was shifted to fast speed in the active loop in preparation for cold

leg recirculation. RWST level has decreased to 18% and containment

sump level has increased above 413'. "C" Charging pump was OOS prior

to the event. EOP-2.2 has been entered from EOP-2.0, LOSS OF

SECONDARY COOLANT.

INITIATING CUES: RWST LO-LO-LVL-XFER TO SUMP annunciator is received at 18% RWST

level. CRS has directed the NROATC to transfer ECCS to Cold Leg

Recirculation and prepare for Hot Leg Recirculation per EOP-2.2 starting

at STEP 3.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes Yes Implement Attachment I, RHR/SPRAY Implements Attachment I by depressing

SWAPOVER. Depress both RESET TRAIN both RESET TRAIN A(B) RB SPRAY

A(B) RB SPRAY. pushbuttons.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Verify annunciator XCP-612 3-2 (RB SPR Verifies annunciator XCP-612 3-2 (RB

ACT) clears. SPR ACT) clears.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Yes Yes Align RHR to the Sumps. (Closes RWST Verifies MVG-8811A and 8812A, RHR

suction valves after verifying sump valves SUMP A TO RHR PP A, indicates red light

open. ON, green light OFF. MVG-8809A, RWST

TO RHR PP A indicates red light OFF,

green light ON. MVG-8811B and 8812B,

RHR SUMP B TO RHR PP B, indicates red

light ON, green light OFF. MVG-8809B,

RWST TO RHR PP B indicates red light

OFF, green light ON.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

Yes Yes Align RB Spray to the Sumps. (Closes RWST Verifies MVG-3004A and 3005A, SUMP

suction valves after verifying sump valves ISOL LOOP A, indicates red light ON,

open. green light OFF. MVG-3001A, RWST TO

SPRAY PUMP A SUCT indicates red light

OFF, green light ON. MVG-3004B and

3005B, SUMP ISOL LOOP B, indicates red

light ON, green light OFF. MVG-3001B,

RWST TO SPRAY PUMP SUCT, indicates

red light off, green light on.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

Yes Yes Verify at least one train of RHR has been Verifies RB SUMP TO RHR PUMP valves

aligned to the RHR sumps. MVG-8811A&B and MVG-8812A&B open.

Verifies RWST TO RHR PUMP,

MVG-8809A&B are closed.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Yes Yes Reset both SI Reset Train "A" and Train "B". SI RESET TRAIN A&B switches

momentarily taken to the RESET position.

SI AUTO BLOCK light illuminates and SI

AUTO light goes to dim.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

Yes Yes Align Charging Pumps for Cold Leg Ensures both RHR Pumps A(B) are

Recirculation: Ensure both RHR Pumps A(B) running by verifying red light on, green

are running. light off, proper amps and flow indicated.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Yes Yes Close both MVG-8887A(B) RHR LP A(B) TO MVG-8887A(B) both indicate red light off,

HOT LEGS green light on.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No Yes Isolate the Charging Pump miniflow lines: Turns Power lockout Train "A" to on then

Close MVG-8106, CHG PP. places MVG-8106 switch to close.

Verifies red light off, green light on. Turn

Train "A" power lockout switch to off.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No Yes Close MVT-8109 A(B)(C), CHG PP A(B)(C). Places MVT-8109 A(B)(C) to close.

Verifies red light off, green light on for

each valve.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Yes Yes Open MVG-8706A(B), RHR LP A(B) TO CHG Places MVG-8706 A(B) switch to open.

PP. Verifies red light on, green light off for

each valve.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Yes Yes Close LCV-115B(D), RWST TO CHG PP SUCT. Places LCV-115B(D) to close. Verifies red

light off, green light on for each valve.

CUES: SAT

The examinee must wait until MVG-8706A (B) are full open before closing UNSAT

LCV-115B (D).

COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

Yes No Verify stable flow on FI-943, CHG LOOP B Verifies flow is stable on FI-943, CHG

CLD/HOT LG FLOW GPM. LOOP B CLD/HOT LG FLOW GPM.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

No No Verify two charging pumps are running CHG/SI PUMP A and B indicates red light

ON, green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

No Yes Check 'C' charging pump aligned to 'A' train. CHG/SI PUMP C XFER SWITCH XET 2000C

on Train "A" light is lit.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 16 STEP STANDARD:

Yes Yes Split charging pump suction & discharge lines. MVG-8131A and (B), LP B SUCT TO CHG

PP C, indicates red light OFF, green light

ON. MVG-8885, CHG LP A ALT TO COLD

LEGS, indicates red light ON, green light

OFF. MVG-8133A and (B), CHG PP C TO

LP B DISCH, indicate red light OFF, green

light ON.

CUES: SAT

To prevent dead-heading "A" Chg Pp (miniflows closed), 8885 must be opened UNSAT

BEFORE closing 8133A or B. If not opened prior to, constitutes failure of this JPM.

COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

No No Ensure both MVB-9503A(B) are open. Verifies MVB-9503A(B) open by

observing red light on, green light off.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

No No Complete alignment of RB Spray for RESET PHASE A - TRAIN A(B) CNTMT

recirculation: Reset Containment Isolation. ISOL and RESET PHASE B - TRAIN A(B)

CNTMT ISOL momentarily depressed.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 19 STEP STANDARD:

Yes No Close MVG-3002A(B) NAOH TO SPRAY PUMP MVG-3002A(B) both indicate red light off,

A(B) SUCT green light on

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 20 STEP STANDARD:

Yes No Place both ESF LOADING SEQ A(B) RESETS ESF LOADING SEQ A(B) RESETS

to: NON-ESF- LCKOUTS, AUTO-START switches momentarily taken to the

BLOCKS. NON-ESF LOCKOUT position and then to

the AUTO START BLOCKS position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 21 STEP STANDARD:

Yes No Establish Instrument Air to the RB. Operator verifies/starts one Instrument Air

Compressor. PVA-2659, INST AIR TO RB

AIR SERV and PVT-2660, AIR SPLY TO

RB indicate red light ON, green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 22 STEP STANDARD:

No No Verify RHR Sump are NOT blocked. Notes normal RHR pump amps and

discharge pressure.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 23 STEP STANDARD:

Yes No Shift the CCW Train to fast speed in the Active Verifies CCW Train "A" is running in fast

Loop. speed.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 24 STEP STANDARD:

No No Determine if transfer to Hot Leg Recirculation Checks initial conditions and determines

will be required: Check if this procedure was that this procedure was entered from

entered from EOP-2.0, LOSS OF SECONDARY EOP-2.0.

COOLANT.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 25 STEP STANDARD:

No Yes Prepare for Hot Leg Recirculation: Ensure MVG-8801A, HI HEAD TO COLD LEG INJ,

MVG-8801B, HI HEAD TO COLD LEG INJ. is indicates red light OFF, green light ON.

open. Close MVG-8801A.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPS-005

DESCRIPTION: TRANSFER TO COLD LEG RECIRCULATION

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPS-029

LOSS OF INTERMEDIATE RANGE INSTRUMENTATION

APPROVAL: DOW APPROVAL DATE: 6/20/2002

REV NO: 4

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-033-05-01 RESPOND TO INTERMEDIATE RANGE INSTRUMENTATION CHANNEL

FAILURE

TASK STANDARD:

Power level stable at approx 10-4% reactor power. Level trip switch for N35 is in BYPASS.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: AOP-401.8

TOOLS:

EVALUATION TIME 5 TIME CRITICAL No 10CFR55: 45(a)4

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: A Reactor Startup is in progress per GOP-3. Reactor power is approx

10E-5 CPS. P-6 has been blocked.

INITIATING CUES: The CRS directs NROATC to respond to annunciator(s).

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes Yes Stabilize reactor power at current power NROATC drives control rods inward to

level. achieve a stable 0 DPM SUR and stabilize

reactor power.

CUES: SAT

The student may refer to ARP for directions to AOP-401.8. UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

Yes Yes Bypass the level trip for NI-35. Positions the level trip switch for NI-35 to

the BYPASS position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes Verify IR & SR TRIP BYPASS annunciator Observes IR&SR TRIP BYP annunciator

energizes. (XCP-620-4-5) energizes by visual

observation and acknowledges alarm.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Check if Reactor Power is less than 7.5 x Verifies Reactor Power is greater than 7.5

10E-6%. x 10E-6%.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Verify P6 is bright, Verifies P6 status light is illuminated.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No No Monitor the operable IRNI channel Verifies NI-36 operating properly.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No No Ensure NR-45 selected to operable channel. Selects NR-45 to NI-36 position and

verifies NI-35 is not selected.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPS-029

DESCRIPTION: LOSS OF INTERMEDIATE RANGE INSTRUMENTATION

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPS-043

STUCK ROD

APPROVAL: DOW APPROVAL DATE: 6/20/2002

REV NO: 4

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-004-05-01 RESPOND TO CONTROL ROD MISALIGNMENT

TASK STANDARD:

The misaligned rod has been identified and control bank "D" has been aligned with the misaligned

control rod.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: AOP-403.5

TOOLS:

EVALUATION TIME 15 TIME CRITICAL No 10CFR55: 45(a)8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Reactor power is being reduced from 75% at a rate of 1%/min.

INITIATING CUES: CRS directs NROATC to perform the immediate and followup actions of

AOP-403.5.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes No Rotate rod control bank selector switch to Rotates the ROD CNTRL BANK SEL

MAN. switch to the MAN position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No No Stop any turbine load changes in progress. Stops all turbine load changes by

depressing load set INCREASE pushbutton

until AT SET LOAD light illuminates.

CUES: SAT

Spare operator may perform if directed. UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No No Maintain Tavg-Tref within 5F. Adjust turbine load to keep Tavg and Tref

within 5 degrees.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Monitor DRPI and step counter to identify Monitors DRPI and determines that rod

misaligned control rod and affected control K-10 in bank "D" is misaligned high from

rod bank. other rods in bank "D".

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Record control rod data. Records misaligned control rod

information; records control rod positions

and group step counter demands.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No No Record Control Rod positions and Group step Records rod and group data.

counter demands.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No No Notify I&C Dept to investigate the cause of the Notify I&C Department to investigate.

failure.

CUES: SAT

If necessary, prompt operator to identify stuck rod. Examiner informs the operator UNSAT

that the CRS has recorded rod positions and made proper notifications.

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No No Notify personnel and obtain information. MDS, Rod Control Engineer, I&C, and

Reactor Engineering notified. Power level

and recovery rate obtained.

CUES: SAT

Cue operator that CRS will notify MDS, Rod Control Sys Engineer, I&C, and Reactor UNSAT

Engineering. Cue operator that power level for rod recovery is <75% and rate of

control rod movement is ó12 steps/minute. Cue operator I&C has determined there

is no electrical problem.

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Yes Yes Rotate rod control bank selector switch CW to Rotate ROD CNTRL BANK SEL switch to

the affected bank position. the CBD position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

Yes Yes Drive the affected bank, 6 steps in the Drives Bank "D" rods 6 steps OUT

direction the rod is misaligned while monitoring (toward stuck rod).

DRPI.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

No Yes Return affected bank to its original position. Drives Band "D" rods 6 steps IN.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Yes Yes Determine if misaligned rod moved or failed to Determines that rod K-10 failed to move.

move.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

Yes Yes Rotate rod control bank selected switch CCW Rotates ROD CNTRL BANK SEL switch to

to manual. MAN.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

Yes Yes Drive control bank to align with the misaligned Drives control rod bank "D" out to align

control rod. with control rod K-10 (All Bank "D" rods at

same DRPI position).

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

No No Determine if plant shutdown is required. Determines plant shutdown is required.

CUES: SAT

Prompt student for next action if not stated. UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPS-043

DESCRIPTION: STUCK ROD

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPS-042

IDENTIFY AND ISOLATE RCS LEAK TO CCWS

APPROVAL: DOW APPROVAL DATE: 6/20/2002

REV NO: 3

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

344-001-03-02 ANALYZE INDICATIONS TO DETERMINE THAT ABNORMAL PLANT EVENT IS

IN PROGRESS

TASK STANDARD:

Intersystem leakage stopped by isolating letdown per ARP-019-XCP-644, pt 1-3.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: ARP-019-XCP-644

TOOLS:

EVALUATION TIME 15 TIME CRITICAL No 10CFR55: 45(a)9

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The plant is operating at 100% power with all systems in Automatic.

INITIATING CUES: CRS directs NROATC to respond to RM-L2A HI RAD annunciator.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No No Verify automatic action has occurred Verifies green light ON for PVV-7096, CC

SURGE TK VLV.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No No Verify high radiation via COMPONENT Identifies COMPONENT COOLING LIQUID

COOLING LIQUID MONITORS on XCP-644 MONITORS RML2A RADIATION MONITORS

meters and R/R-5 trending up and are

above high alarm setpoint on XCP-644.

CUES: SAT

R/R-5 Is trending up and agrees with RML-2A. UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No No Notify Health Physics personnel to survey Instruct Health Physics personnel to check

CCW system. radiation levels in CCW system in the

areas of letdown heat exchanger, RCS

and PZR sample coolers, RCP Thermal

Barrier lines, Excess Letdown Heat

Exchanger for abnormal radiation levels.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Notify Chemistry to sample CCW. Notifies Chemistry to sample CCW system.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Monitor MCB indications for leak. Checks no white lights on M1-CC and

M2-CC.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Yes Yes Determine leak is in Letdown Hx NROATC announces leak is in letdown Hx

from MCB and RMS indications

CUES: SAT

WHEN THE OPERATOR INDICATES THE LEAK LOCATION cue them that the CCW UNSAT

return line from LETDOWN HEAT EXCHANGER reads 400 mR/hr.

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No No Places excess letdown in service per HCV-137 indicates red light OFF, green

SOP-102 light ON. MVG-9583 indicates red light

ON, green light OFF. PVT-8153 and 8154

indicate red light ON, green light OFF.

Adjusts HCV-137 pot. as necessary.

CUES: SAT

WHEN EXAMINEE DETERMINES LEAK IS IN LETDOWN HX CRS DIRECTS NROATC TO UNSAT

PERFORM THE ACTION IN THE ARP TO ISOLATE LEAKAGE FROM THE LTDN HX

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Yes Yes Closes PVT-8149A (B, C), LCV-460, LCV-459 PVT-8149A,B,C LTDN ORIFICE A,B,C ISOL

and PVT-8152 and LCV-459, 460 and PVT-8152 LTDN

LINE ISOL indicates red light OFF, green

light ON.

CUES: SAT

ISOLATION OF LETDOWN FLOW PATH BY ANY ONE OF LCV-459, LCV-460, UNSAT

8149A/B/and C, IS SUFFICIENT TO ACCOMPLISH TASK.

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No No Closes PCV-145 Places LO PRESS LTDN PCV-145 A/M

station in MANUAL and reduces output to

zero

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No No Closes FCV-122 Places CHG FLOW FCV-122 A/M station in

MANUAL and reduces output to zero

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

No No Adjusts HCV-186 seal injection control valve Adjusts INJ FLOW HCV-186 Hagan

to maintain 6-13 gpm per pump potentiometer if necessary to keep RCP

A/B/C INJ FLOW GPM

(IFI-130A/127A/124A) between 6 and 13

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

Monday, August 26, 2002 Page 7 of 9

JPM QUESTIONS

Monday, August 26, 2002 Page 8 of 9

JPM NO: JPS-042

DESCRIPTION: IDENTIFY AND ISOLATE RCS LEAK TO CCWS

IC SET:

INSTRUCTIONS:

COMMENTS:

Monday, August 26, 2002 Page 9 of 9

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPS-093

RESPOND TO IMMINENT PRESSURIZED THERMAL

SHOCK

APPROVAL:GAL APPROVAL DATE:08/23/02

REV NO: 0

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-098-05-01 RESPOND TO ANTICIPATED PRESSURIZED THERMAL SHOCK

TASK STANDARD:

Depressurize the RCS in accordance with EOP-16.0 through step 16.c. The use of applicable Human

Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc)

and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES:

TOOLS:  : EOP-16.0

EVALUATION TIME 15 TIME CRITICAL NO 10CFR55: 45a8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Plant was operating at 100% reactor power.

Events have occurred that resulted in three faulted S/Gs

EOP-16.0 is entered from EOP-12.0, Monitoring of Critical Safety

Functions

EOP-16.0 step 1 has been completed.

INITIATING CUES: CRS directs NROATC to perform the actions of EOP-16.0 step 2 through

step 16.c.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

Yes Yes Check RCS Tcold stable or increasing Check RCS Tcold on TR-410.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Check PZR PORV Block Valves Verify Power is available to the PZR

PORV BLOCK VALVES as indicated by

the position indicating lights on the

switches for MVG-8000A, B, C are

illuminated. At least one Block Valve Red

indicating light is lit and Green light is

extinguished.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes Check if either XCP-6106 1-11 and 2-11 or Indicating lights on XCP-6106 are verified.

XCP-6106 1-12 and 2-12 are bright.

CUES: SAT

If monitor lights are not bright step 4 may be bypassed. UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Verify RCS pressure is less than 450 psig. Verify RCS pressure on at least one of

the following PI-402A, 402B, 403, PR-402.

CUES: SAT

This step may be bypassed if step 3 monitor lights are not bright. UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Verify PZR pressure is less than 2335 psig. Verify PZR pressure on at least one of the

following PI-455, 456, 457, 444, 445,

PR-444.

CUES: SAT

This step may be bypassed if monitor lights in step 3 are bright. UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Ensure all PZR PORVs are closed. The Green indicating lights on the PORV

switches are illuminated and the Red lights

are extinguished.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No Yes Verify SI flow on FI-943, CHG LOOP B Flow is verified on FI-943.

CLD/HOT LG FLOW GPM.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No Yes Check if SI can be terminated. Check is RCS subcooling on TI-499A(B) is

greater than 80 degrees. RVLIS level

indicated on LI-1311(1321) or

LI-1312(1322) is greater than; 0

RCPs=61%NR; 1 RCP=28%WR; 2

RCP=38%WR; 3RCP=83%WR.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Yes Yes Reset both SI Reset Train A(B) Switches. Both SI Reset switches actuated, the SI

ACT light goes dim and the SI AUTO

BLOCK light illuminates.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No No Reset Containment Isolation. Depress both the Train A and Train B

Phase A reset pushbuttons. Depress both

the Train A and Train B Phase B reset

pushbuttons.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

No No Place both ESF Loading Seq A(B) Resets to; Position Both ESF Loading Sequencer

switches to NON_ESF Lockout and

AUTO-START Blocks.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Yes Yes Establish Instrument Air to the RB. Verify B Instrument Air Compressor is

running and direct unit 5 to reset the

relays on A Instrument Air Compressor.

Open PVA-2659, INST AIR TO RB AIR

SERV as indicated by the Red indicating

light illuminated and the Green indicating

light extinguished. Open PVT-2660, AIR

SPLY TO RB as indicated by the Red

indicating light illuminated and the Green

indicating light extinguished.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

Yes Yes Stop the following SI Pumps and place in Stop any RHR Pump operating in the SI

Standby. mode as indicated by the Red light

extinguished and the Green light lit. Stop

all but one Charging Pump as indicated by

Only one Charging Pump Red indicating

light Lit.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

Yes Yes Establish Normal Charging. Close FCV-122 as indicated by the Red

closed indicating light on the manual

controller being illuminated. Open both

MVG-8107 and 8108 as indicated by the

Red open light illuminated and the Green

closed light extinguished. Adjust FCV-122

to obtain 60 gpm as indicated on FI-122.

Close both MVG-8801A(B) as indicated by

the Green indicating light lit and the Red

indicating light extinguished.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

Yes Yes Verify SI flow is not required. Check is RCS subcooling on TI-499A(B) is

greater than 30 degrees. RVLIS level

indicated on LI-1311(1321) or

LI-1312(1322) is greater than; 0

RCPs=61%NR; 1 RCP=28%WR; 2

RCP=38%WR; 3RCP=83%WR.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 16 STEP STANDARD:

Yes Yes Verify RCS Thot is stable. Verify RCS Thot as read on TR-413.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

Yes Yes Isolate all SI Accumulators. Checks if RCS subcooling on TI-499A(B)

is greater than 30 degrees. Checks if

RVLIS level indicated on LI-1311(1321) or

LI-1312(1322) is greater than; 0

RCPs=61%NR; 1 RCP=28%WR; 2

RCP=38%WR; 3RCP=83%WR. Directs IB

Operator to unlock and close the breakers

for the Accumulator Discharge Isolation

Valves XMC1DA2X 08AE - XVG8808A-SI

XMC1DA2X 08FJ - XVG08808C-SI

XMC1DB2Y 16IM - XVG8808B-SI ,

indicated by the position indicating lights

for the valves illuminating.

Close all the Accumulator Discharge

Isolation Valves as indicated by the Green

position indicating lights illuminated and

the Red indicating lights extinguished.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

Yes Yes Depressurize the RCS to reduce subcooling. Cycle one PZR PORV as necessary to

deprssurize the RCS using the MCB

control switch. Operate Charging Pumps

and valves as necessary to maintain RCS

subcooling greater than 30 degrees as

indicated on TI-499A(B).

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 19 STEP STANDARD:

Yes Yes Continue depressurization until either of the RCS Subcooling as indicated on

following are met; TI-499A(B) is less than 40 degrees OR

PZR Level is greater than 68% (54%) as

indicated on LI-459A, 460, 461 OR RCS

pressure is less than 125 psig as

indicated on PI-402A, 402B, 403, PR-402

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 20 STEP STANDARD:

Yes Yes Stop RCS depressurization. Close any open PZR PORV as indicated

by the Green indicating lights being

illuminated and the Red indicating lights

extinguished.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPS-093

DESCRIPTION: RESPOND TO IMMINENT PRESSURIZED THERMAL SHOCK

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPSF-019

MANUALLY INITIATE REACTOR BUILDING SPRAY

APPROVAL: TRH APPROVAL DATE: 8/2/2002

REV NO: 6

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

026-005-01-01 MANUALLY INITIATE REACTOR BUILDING SPRAY

TASK STANDARD:

At least one train of containment spray is manually actuated with >2500 gpm per EOP-1.0. RCPs are

secured due to Phase B actuation when directed by procedure. The use of applicable Human

Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc)

and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: EOP-1.0

TOOLS:

EVALUATION TIME 5 TIME CRITICAL NO 10CFR55: 45(a)8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The reactor has tripped from 100% power and an SI has occurred.

INITIATING CUES: The CRS directs the NROATC to perform step 8 of EOP-1.0.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No No Recognizes failure of RB spray to actuate. Verifies RB pressure >12.05 PSIG, and RB

SPR ACT and PHASE B ISOL annunciator

are not lit.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No No Actuate RB Spray by placing both CS-SGA1 Places (CS-SGA1 and CS-SGA2) to the

and CS-SGA2 switches to ACTUATE ACTUATE position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Yes No Actuate RB spray by placing both CS-SGB1 Places (CS-SGB1 AND CS-SGB2) to the

and CS-SGB2 switches to ACTUATE. ACTUATE position.

CUES: SAT

If examinee attempts to operate the two train A switches (top pair), he should UNSAT

recognize failure of spray to actuate and operate the Train B (bottom pair) of

switches.

NOTE: If examinee does not operate the Train B (bottom pair) of switches, then

steps 4 through 7 are critical steps.

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Verify all RB spray, phase B isolation monitor PHASE B Isol monitor lights are bright on

lights are bright. XCP-6105.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No No Ensure MVG-3001A(B) RWST to spray pump MVG-3001A&B indicates red light ON,

A(B) SUCT, are open. green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No No Ensure MVG-3002A(B) NAOH to spray pump MVG-3002A&B indicates red light ON,

SUCT, are open. green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No No Ensure MVG-3003A(B) SPRAY HDR ISOL MVG-3003A&B indicates red light ON,

LOOP are open. green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Yes No Ensure both RB spray pumps are running. A&B RB Spray Pumps are running by red

light ON indication and normal running

amps.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Yes No Verify flow on FI-7368 & FI-7378 SPRAY PP Verify on FI-7368, SPR PP A DISCH FLOW,

DISCH FLOW. and FI-7378, SPR PP B DISCH FLOW, are

> 2500 gpm.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

Yes No Stop all RCPs. A, B, & C RCP indicate OFF by green light

ON and 0 running amps.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

Monday, August 26, 2002 Page 7 of 9

JPM QUESTIONS

Monday, August 26, 2002 Page 8 of 9

JPM NO: JPSF-019

DESCRIPTION: MANUALLY INITIATE REACTOR BUILDING SPRAY

IC SET:

INSTRUCTIONS:

COMMENTS:

Monday, August 26, 2002 Page 9 of 9

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPSF-046

TRANSFER IN-SERVICE CHARGING PUMP (NRC)

APPROVAL: DOW APPROVAL DATE: 6/24/2002

REV NO: 1

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-022-05-01 RESPOND TO LOSS OF REACTOR COOLANT MAKEUP (CHARGING)

TASK STANDARD:

'A' Charging pump running. 'C' Charging pump secured within one minute of the start of 'C' Charging

pump. The use of applicable Human Performance Tools (3-way communications, self checking, peer

checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

SIMULATOR PERFORM

REFERENCES: SOP-102

TOOLS:

EVALUATION TIME 5 TIME CRITICAL NO 10CFR55: 45(a)8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The plant is operating at 100% power. It is necessary to start "C"

charging pump on "A" Train in order to equalize run time.

INITIATING CUES: CRS directs NROATC to place 'C' charging pump in service on 'A' train

and remove 'A' charging pump, per SOP-102,Section III.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No Yes Verify MCB lineup for aligning charging pump Complete applicable (MCB) portions of

"C" to "A" Train. SOP-102 Att. VA.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Verify local lineup for aligning charging pump AB operator reports Attachment VA of

"C" to "A" Train. SOP-102 complete with the exception of

charging pump breakers.

CUES: SAT

Booth operator cues examinee that local lineup for aligning charging pump 'C' to 'A' UNSAT

train per Attachment VA is complete with exception of charging pump breakers.

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Yes Yes Directs IB operator to rack up "C" charging IB operator reports "C" charging pump

pump on "A" train. racked up on "A" train.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No Yes Ensure the Charging pump 'C' Auxiliary Oil Verifies XPP-43C-PP1, CHG PP C AUX OIL

pump is running. PP, switch in AUTO and red light ON.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No Yes Ensure 'A' Train CCW is operating per Verifies that 'A' CCW pp is running via red

SOP-118. light ON and amp indication.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Ensure 'A' Train chill water is running. Verifies that 'A' Train Chill Water is running

via red light ON on 'A' Train Chiller and

Chill Water PP, and green light OFF.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

Yes Yes Start 'C' charging pump. "C" charging pump (Train A) indicates red

light ON, green light OFF, and normal

running amps.

CUES: SAT

UNSAT

THIS IS THE START OF THE TIME CRITICAL PORTION RECORD TIME_______________

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No No Verify XPP-43C-PP1 stops automatically when Verifies green OFF light is lit and red

charging pump comes up to full speed. AUTO light is deenergized.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No No Monitor current and discharge pressure for Ensures current between 30 and 50 amps

proper pump operation. and ensures PI-121, CHG PRESS PSIG, is

between 2650 and 2850 psig.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

Yes Yes Verifies CCW flow to 'C' charging pump. XVG-9684C, CCW TO CHG PP C indicates

red light OFF, green light ON. CCW TO

CHG PP C VLV NOT FULL OPEN

annunciator in alarm.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Yes Yes Stops "C" charging pump. Takes "C" charging pump switch to STOP

position. Verifies green light ON for BKR

OPEN indication on "C" charging pump

(within 1 minute).

CUES: SAT

UNSAT

THIS IS THE END OF THE TIME CRITICAL PORTION RECORD TIME__________

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No No Informs CRS of failure on 'C' charging pump. Informs CRS of failure of CCW valve to 'C'

charging pump (XVG-9684C) to open.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPSF-046

DESCRIPTION: TRANSFER IN-SERVICE CHARGING PUMP (NRC)

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPPF-012

LOCALLY START AN EMERGENCY D/G DURING A

LOSS OF OFFSITE POWER (WITH FAILURE OF FIELD TO

FLASH)

APPROVAL: DOW APPROVAL DATE: 6/19/2002

REV NO: 7

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

064-002-01-04 MANUALLY START A DIESEL GENERATOR LOCALLY

TASK STANDARD:

Diesel Generator 'A' is started locally with frequency 60 Hz and Voltage 7200 Volts. The use of

applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic

alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

PLANT SIMULATE

REFERENCES: EOP-6.0

TOOLS: EOP-6.0 ATTACHMENT 1

EVALUATION TIME 20 TIME CRITICAL No 10CFR55: 45(a)8

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Diesel 'A' fails to start on a loss of AC power. EOP-6.0: Attachment 1,

Step 1 has been completed.

INITIATING CUES: Control Room Operator directs starting the "A" D/G per Attachment 1 of

EOP-6.0.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No Yes At the diesel generator local control panel, Alarms and indications monitored on local

monitor the alarms and indications to control panel, XCX-5201. START FAILURE

determine start failure (DG-436). annunciator in alarm.

CUES: SAT

Examiner informs operator that there is a "start failure" annunciator (Window 6-1) UNSAT

and the engine has not started. No other alarms are present. If asked about D/G air

and fuel parameters, inform operator that starting air tank pressure is 400#, fuel oil

system is normal and there are no flags on the relay panel.

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No Yes Ensure VOLTAGE REGULATOR is in AUTO. Operator verifies VOLTAGE REGULATOR

is in AUTO position.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No Yes Momentarily depress GEN RELAYS RESET Operator depresses GEN RELAYS RESET

pushbutton. pushbutton.

CUES: SAT

Cue Operator that D/G did not start after GEN RELAYS RESET pushbutton is UNSAT

depressed.

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No Yes Notifies control room to place EXCITER Switch Control Room notifies operator EXCITER

to RESET. Switch placed in RESET position.

CUES: SAT

Cue Operator that D/G did not start after EXCITER Switch taken to RESET by Control UNSAT

Room.

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No Yes Attempt to start the Diesel Generator by START FAILURE annunciator clears. D/G

depressing the ENGINE SHUTDOWN RESET engine does not start. START FAILURE

pushbutton annunciator alarms 7 seconds after it

clears.

CUES: SAT

Cue Operator that D/G did not start after the ENGINE SHUTDOWN RESET switch UNSAT

was placed in RESET by Control Room. Cue Operator the START FAILURE

annunciator clears, but reenergizes 7 seconds later.

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Yes Yes Place REMOTE/LOCAL/MAINT Switch in Local control switch indicates LOCAL .

LOCAL.

CUES: SAT

This is critical because it permits local voltage adjustment. Since diesel did not start, UNSAT

operator should go to Step 9. This is the alternative path aspect of this JPM.

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No Yes Momentarily depress the EMERG START EMERG START pushbutton depressed.

pushbutton.

CUES: SAT

Cue operator that there is no change in indicators when the EMERG START UNSAT

pushbutton is depressed.

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Yes Yes Attempt to manual start using the Main Air Operator engages spanner wrench and

Start Valve manual start (on either end of DG depresses air start valve XVM-10996A or

Engine). XVM-10996B for at least 5 seconds.

CUES: SAT

Cue operator that engine is cranking, starts to accelerate within five seconds. UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

No Yes Observe diesel generator starts and Operator observes tachometer. 'A' D/G

accelerates to 514 rpm. tachometer indicates ~ 510 RPM.

CUES: SAT

By pointing to the approximate center of the green band on the ENGINE UNSAT

TACHOMETER, cue operator that the D/G engine RPM ~ 510 RPM.

Cue operator that READY FOR LOAD light is NOT lit if "REQUESTED".

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No Yes Verifies D/G voltage 6840-7344 Volts. D/G 'A' AC VOLTMETER indicates 0 Volts.

CUES: SAT

Cue operator that the voltage and frequency are zero if requested. If operator UNSAT

points to either VOLTMETER GENERATOR or VOLTMETER BUS to determine

voltage, always inform operator voltage is ZERO by pointing to 0 on gauge. (These

indicators do not work unless the SYNCHROSCOPE is ON.)

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Yes Yes Momentarily rotate the FIELD FLASH Switch to Operator rotates FIELD FLASH Switch to

FLASH. FLASH. D/G 'A' AC Voltmeter indicates

6900 Volts.

CUES: SAT

If operator correctly takes FIELD FLASH switch to FLASH, by pointing to just above UNSAT

the bottom red mark, inform operator that voltage is 6900 V.

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No Yes Depress EMERG START RESET Pushbutton. EMERG START RESET Pushbutton

depressed.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

No Yes Reset annunciators on XCX-5201. Annunciator reset pushbutton depressed

on XCX-5201.

CUES: SAT

Cue operator that all alarms on XCX5201 are clear except LOCAL CONTROL. UNSAT

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

Yes Yes Depress TEST START Pushbutton Operator depresses TEST START

Pushbutton.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

Yes Yes Verify D/G output breaker closed. Verifies D/G 'A' breaker indicates red light

ON.

CUES: SAT

Cue operator that breaker's red light is lit ONLY after the operator indicates he will UNSAT

check that indication.

COMMENTS:

CR SEQ STEP: 16 STEP STANDARD:

No Yes Using the AUTO VOLTAGE CONTROL Operator adjusts voltage control switch

RAISE-LOWER switch, adjust voltage to 7200 until voltage of approximately 7200 Volts

Volts. is observed.

CUES: SAT

Cue operator that voltage is 6900 V before adjustment and 7200 V after correct UNSAT

adjustment.

COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

No Yes Adjust frequency to 60 Hz using GOVERNOR Operator positions governor switch to

RAISE-LOWER switch raise to adjust frequency until 60 hz is

observed on the frequency meter.

CUES: SAT

Cue operator that frequency is 59.5 Hz before adjustment and 60 Hz after correct UNSAT

adjustment.

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPPF-012

DESCRIPTION: LOCALLY START AN EMERGENCY D/G DURING A LOSS OF OFFSITE POWER

(WITH FAILURE OF FIELD TO FLASH)

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPPF-049

(NRC EXAM MODIFIED VERSION OF JPPF-047)

CONTROL ROOM EVACUATION (DUTIES OF BOP

OPERATOR)

APPROVAL: TRH APPROVAL DATE: 7/18/2002

REV NO: 0

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

000-068-05-01 PERFORM CONTROL ROOM EVACUATION

TASK STANDARD:

AOP-600.1 ATT. II performed with the following complete: 1. All MFPs have been tripped, 2. Rod

Drive MG set feeder breakers have been tripped, 3. RCP "B" or "C" Breaker has been tripped ('A'

RCP is tripped already), 4. Two condensate pumps have been tripped, 5. Three FWBP's have been

tripped. The use of applicable Human Performance Tools (3-way communications, self checking, peer

checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

PLANT SIMULATE

REFERENCES:

TOOLS: AOP-600.1, ATT. II, STEPS 10-12

EVALUATION TIME 14 TIME CRITICAL No 10CFR55: 45(a)13

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: The plant is operating at 100% power, with all controls in automatic. A

bomb threat has been received in the control room. The SS has directed

a control room evacuation. AC power is available to both ESF Buses.

INITIATING CUES: The Control Room Supervisor directs the BOP Operator to perform ATT. 2

of AOP-600.1, Steps 10 through 12.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No Yes Verifies reactor has been tripped. Calls control room and verifies reactor has

been tripped.

CUES: SAT

Examiner cues examinee that the reactor has been tripped. UNSAT

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

Yes Yes Locally trip all MFPs (436' TB). Pulls MFP "PULL TO TRIP" handle on front

standard for MFP's "A" "B" & "C". Verifies

trip by noting RPM decrease locally OR

trips MFPs from local DCS station.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

Yes Yes Trips ROD DRIVE M/G SET "B" - Trips rod drive MG set "B" bkr 06C at

XMG0001B-CR, XSW1B1 06C. XSW-1B1 by pushing on red TRIP

pushbutton on left side on front of

breaker. Verifies a green "OPEN" flag

results and red light OFF, green light ON.

CUES: SAT

Instructor provides feedback of "no change in status" if examinee indicates he/she UNSAT

would trip a 480V breaker using the TRIP Pushbutton on the right side of the

breaker. This p/b only works when the breaker is racked out to the "test" position.

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No Yes Check status of XSW1A 06 FD WTR Verifies that the "A" FWBP, bkr 06 is

BOOSTER PUMP A XPP0028A-FW breaker. closed by observing red light on outside of

cubicle door.

CUES: SAT

Examiner informs examinee that the "A" FWBP, bkr 06 red light is lit. UNSAT

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

No Yes Checks status of XSW1A 09, Rx COOLANT Checks RCP "A" breaker at XSW1A 09.

PUMP A XPP0030A-RC. Verifies a green light on outside of cubicle

floor.

CUES: SAT

Cue examinee that RCP "A" Bkr has a green light lit on front of cubicle. (Note: This UNSAT

will "setup" alternate path portion of this JPM. Examinee will have to leave either 'B'

or 'C' RCP running in Step 12.6.)

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

No Yes Check status of XSW1A 07, COND PUMP A Verifies that the "A" condensate pump bkr

XPP0042A-CO breaker. 07 is closed by observing red light on

outside of cubicle door.

CUES: SAT

Examiner informs examinee that the "A" condensate pump breaker red light is lit. UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

Yes Yes Trips XSW1B 09, COND PUMP B Trips breaker XSW1B 09 for Cond Pump

XPP0042B-CO breaker. "B" by pushing the "MANUAL TRIP" lever

on front of breaker (inside cubicle door).

Verifies a green light on outside of cubicle

door results.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

Yes Yes Trips XSW1C 06, COND PUMP C Trips bkr XSW1C 06 for Cond Pump "C" by

XPP0042C-CO breaker. pushing the "MANUAL TRIP" lever on

front of breaker (inside cubicle door).

Verifies a green light on outside of cubicle

door results.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Yes Yes Trips XSW1B 06, FD WTR BOOSTER PUMP B Trips the FWBP "B" bkr 06 manually at

XPP0028B-FW breaker. XSW-1B by pushing the "MANUAL TRIP"

lever on front of breaker (inside cubicle

door). Verifies a green light on outside of

cubicle door results.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

Yes Yes Trips XSW1B 13, FD WTR BOOSTER PUMP D Trips the FWBP "D" bkr 13 manually at

XPP0028D-FW breaker. XSW-1B by pushing the "MANUAL TRIP"

lever on front of breaker (inside cubicle

door). Verifies a green light on outside of

cubicle door results.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Yes Yes Trips XSW1C 08, FD WTR BOOSTER PUMP C Trips the FWBP "C" bkr 08 manually at

XPP0028C-FW breaker. the FWBP "C" breaker. XSW-1C by pushing the "MANUAL TRIP"

lever on front of breaker (inside cubicle

door). Verifies a green light on outside of

cubicle door results.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

Yes Yes Trips XSW1B 07, Rx COOLANT PUMP B Trips the RCP "B" bkr 07 at XSW-1B (OR

XPP0030B-RC "OR" XSW1C 03, Rx COOLANT RCP "C" bkr 03 at XSW-1C) by pushing the

PUMP C XPP0030C-RC breaker. "MANUAL TRIP" lever on front of breaker

(inside cubicle door). Verifies a green

light on outside of cubicle door results.

CUES: SAT

This is the alternative path portion of this JPM. UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM NO: JPPF-049

DESCRIPTION: (NRC EXAM MODIFIED VERSION OF JPPF-047) CONTROL ROOM EVACUATION

(DUTIES OF BOP OPERATOR)

IC SET:

INSTRUCTIONS:

COMMENTS:

V.C. SUMMER NUCLEAR STATION

JOB PERFORMANCE MEASURE

JPM NO: JPPF-NRC

ESTABLISH DEMINERALIZED WATER ALTERNATE

COOLING TO CHARGING PUMPS (FAILURE OF CHILLED

WATER SUPPLY).

APPROVAL: DOW APPROVAL DATE: 6/19/2002

REV NO: 4

CANDIDATE

EXAMINER:

THIS JPM IS APPROVED

TASK:

004-001-04-04 ESTABLISH DEMINERALIZED WATER ALTERNATE COOLING TO CHARGING

PUMPS

TASK STANDARD:

Examinee has recognized the damage to the piping in chill water system. Demineralized Water alternate

cooling is provided to "B" charging pump in accordance with AOP-118.1, Attachment 2 and 2B. The

use of applicable Human Performance Tools (3-way communications, self checking, peer checking,

phonetic alphabet, etc) and industrial safety practices meets expectations.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD

PLANT SIMULATE

REFERENCES:

TOOLS: AOP-118.1 ATT. 1, 1B, 2, and 2B

FLASHLIGHT

EVALUATION TIME 15 TIME CRITICAL No 10CFR55: 45(a)12

CANDIDATE: TIME START:

TIME FINISH:

PERFORMANCE RATING: SAT: UNSAT:

QUESTION GRADE: PERFORMANCE

EXAMINER:

SIGNATURE DATE

COMMENTS:

OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

READ TO OPERATOR:

WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING

CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED

AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I

WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE

INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB

PERFORMANCE MEASURE WILL BE SATISFIED.

INITIAL CONDITION: Total loss of Component Cooling Water with CRS implementing AOP-118.1

Chilled Water System, Demineralized Water System, and Fire Service

System are all available for CHG/SI pump alternate cooling per AOP-118.1

INITIATING CUES: The CRS directs you, the ABLL watch, to establish alternate cooling to

the "B" Charging Pump, using chilled water per AOP-118.1, Attachment 1

and 1B.

HAND THIS PAPER BACK TO YOUR

EVALUATOR WHEN YOU FEEL THAT YOU

HAVE SATISFACTORILY COMPLETED THE

ASSIGNED TASK.

STEPS

CR SEQ STEP: 1 STEP STANDARD:

No Yes Obtain cooling supply hoses and hose fittings Cooling supply hose and connections

(AB-400) obtained from dedicated gang box

(AB-400)

CUES: SAT

Have operator point out hoses and discuss how the lines would be connected, UNSAT

versus removing the equipment out of the Gang Box

COMMENTS:

CR SEQ STEP: 2 STEP STANDARD:

No No Connect cooling supply hose to Cooling supply hose connected to

IPX099062B-HR-VU, for 'B' Charging pump IPX09062B-HR-VU, HIGH ROOT TO

(AB-400) IPX9062B, (AB-400)

CUES: SAT

When operator attempts to remove 3/4" female cap, prompt them that the pipe UNSAT

shears flush with the insulation when pressure is applied to the cap for removal.

COMMENTS:

CR SEQ STEP: 3 STEP STANDARD:

No No Operator determines that Chilled Water Operator correctly determines that ATT. 1

System cannot be used due to damaged and 1B are no longer appropriate.

connection.

CUES: SAT

The operator should determine that the next viable option is to use Demineralized UNSAT

Water. They may either make that determination on their own, or simply report to

the Control Room of the problem encountered. If the Control Room is notified, the

operator should be cued to now use ATT 2 and 2B to supply the "B" Charging Pump

from Demineralized Water.

COMMENTS:

CR SEQ STEP: 4 STEP STANDARD:

No No Obtain cooling supply hoses and hose fittings Cooling supply hose and connections

to support Demineralized Water System obtained from dedicated gang box

connection (AB-400) (AB-400)

CUES: SAT

Have operator point out hoses and discuss how the lines would be connected, UNSAT

versus removing the equipment out of the Gang Box

COMMENTS:

CR SEQ STEP: 5 STEP STANDARD:

Yes Yes Connect cooling supply hose to Cooling supply hose connected to

XVT19647B-CC, for 'B' Charging pump XVT19647B-CC, CHG PP B OIL CLR ALT

(AB-400) CLG WTR SUPPLY VLV, (AB-400)

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 6 STEP STANDARD:

Yes Yes Connect cooling supply hose to Cooling supply hose connected to

XVT18783-DN, Demin WTR Washdown VLV XVT18783-DN, AB DEMINERALIZED

WATER WASHDOWN VALVE, (AB-388 at

bottom of ladder to 400' level).

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 7 STEP STANDARD:

No Yes Connect Drain Hose between CHG/SI pump Drain hose connected to XVT19648B-CC,

return valve and floordrain (AB-400) CHG PP B OIL CLR ALT CLG WTR RETURN

VLV, and directed to a floor drain.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 8 STEP STANDARD:

No Yes Check XVG09657B-CC (AB-400) valve Removes the locking device attempts to

position and record AS FOUND on attachment. turn XVG0965BA-CC in the clockwise

direction and records valve position on the

attachment.

CUES: SAT

The following steps pertain to completing valve lineup on Attachment 2B of UNSAT

AOP-118.1. Cue examinee that XVG09657B-CC turns freely in the clockwise

direction.

COMMENTS:

CR SEQ STEP: 9 STEP STANDARD:

Yes Yes Close XVG09657B-CC. Closes XVG09657B-CC, CHG PP B OIL

CLR CCW INLET VLV by rotating the valve

handwheel fully in the clockwise

direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 10 STEP STANDARD:

No Yes Check XVT19647B-CC (AB-400) valve Attempts to turn XVT19647B-CC in the

position and record AS FOUND on attachment. clockwise direction and records valve

position on the attachment.

CUES: SAT

Cue examinee that XVT19647B-CC does not move in the clockwise direction. UNSAT

COMMENTS:

CR SEQ STEP: 11 STEP STANDARD:

Yes Yes Open XVT19647B-CC. Opens XVT19647B-CC, CHG PP B OIL

CLR ALT CLG WTR SUPPLY VLV, by

rotating the valve handwheel fully in the

counter-clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 12 STEP STANDARD:

No Yes Check XVT09685B-CC (AB-400) valve Removes the locking device and attempts

position and record AS FOUND on attachment. to turn XVT09685B-CC in the clockwise

direction.

CUES: SAT

Cue examinee that XVT09685B-CC turns freely in the clockwise direction. Student UNSAT

may choose to determine throttled position of the valve. 3.75 turns open.

COMMENTS:

CR SEQ STEP: 13 STEP STANDARD:

Yes Yes Close XVT09685B-CC. Closes XVT09685B-CC, CHG PP B OIL

CLR CCW OUTLET VALVE, by rotating the

valve handwheel fully in the clockwise

direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 14 STEP STANDARD:

No Yes Check XVT19648B-CC (AB-400) valve Attempts to turn XVT19648B-CC in the

position and record AS FOUND on attachment. clockwise direction.

CUES: SAT

Cue examinee that XVT19648B-CC does not move in the clockwise direction. UNSAT

COMMENTS:

CR SEQ STEP: 15 STEP STANDARD:

Yes Yes Open XVT19648B-CC. Opens XVT19648B-CC, CHG PP B OIL

CLR ALT CLG WTR RETURN VLV, by

rotating the valve handwheel in the fully

counter-clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 16 STEP STANDARD:

No Yes Check XVT09530B-CC (AB-388) valve Removes the locking device and attempts

position and record AS FOUND on attachment. to turn XVT09530B-CC in the clockwise

direction.

CUES: SAT

Cue examinee that XVT09530B-CC turns freely in the clockwise direction. UNSAT

COMMENTS:

CR SEQ STEP: 17 STEP STANDARD:

Yes Yes Close XVT09530B-CC. Closes XVT09530B-CC, CCW SPLY TO

CHG PP B OIL CLR BYP VALVE, by

rotating the valve handwheel in the fully

clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 18 STEP STANDARD:

No Yes Check XVT19654B-CC (AB-388) valve Removes the locking device and attempts

position and record on attachment. to turn XVT19654B-CC in the clockwise

direction.

CUES: SAT

      • Valve is in a contaminated area, but the valve can be simulated checked without UNSAT

entering contaminated area***Cue examinee that XVT19654B-CC turns freely in the

clockwise direction.

COMMENTS:

CR SEQ STEP: 19 STEP STANDARD:

Yes Yes Open XVT19654B-CC. Opens XVT19654B-CC, CHG/SI PUMP A

OIL CLR CLG WTR INLET VLV, by rotating

the valve handwheel in the fully

counter-clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 20 STEP STANDARD:

No Yes Check XVT19655B-CC (AB-388) valve Removes the locking device and attempts

position and record AS FOUND on attachment. to turn XVT19655B-CC in the clockwise

direction.

CUES: SAT

      • Valve is in a contaminate area, but the valve can be simulated checked without UNSAT

entering the contaminate area.Cue examinee that XVT19655B-CC turns freely in the

clockwise direction. Student may choose to determine AS FOUND throttled

position. 1.0 turns open.

COMMENTS:

CR SEQ STEP: 21 STEP STANDARD:

Yes Yes Open XVT19655A-CC. Opens XVT19655A-CC, CHG/SI PUMP A

GB OIL CLR CLG WTR IN VLV, by rotating

the valve handwheel fully in the

counter-clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

CR SEQ STEP: 22 STEP STANDARD:

No Yes Check XVT18783-DN (AB-388) valve position Attempts to turn XVT18783-DN in the

and record AS FOUND on attachment. clockwise direction.

CUES: SAT

Cue examinee that XVT18783B-DN does not move in the clockwise direction. UNSAT

COMMENTS:

CR SEQ STEP: 23 STEP STANDARD:

No Yes Verify flow from the alternate cooling drain Observes water flowing from

hose XVT19648B-CC, CHG PP B OIL CLR ALT

CLG WTR RETURN VLV.

CUES: SAT

Cue operator that clear water is flowing from XVT19648B-CC if previous steps to UNSAT

align system were performed per the performance standards.

COMMENTS:

CR SEQ STEP: 24 STEP STANDARD:

Yes Yes Open XVT18783-DN. Opens XVT18783-DN, AB

DEMINERALIZED WATER WASHDOWN

VALVE, by rotating the valve handwheel

fully in the counter-clockwise direction.

CUES: SAT

UNSAT

COMMENTS:

Examiner ends JPM at this point.

JPM QUESTIONS

JPM NO: JPPF-NRC

DESCRIPTION: ESTABLISH DEMINERALIZED WATER ALTERNATE COOLING TO CHARGING PUMPS

(FAILURE OF CHILLED WATER SUPPLY).

IC SET:

INSTRUCTIONS:

COMMENTS: