Technical Specification Pages for Amendment No. 206 Proposed Change to Loss-of-Power Instrumentation Technical Specifications (Tac No. MB5384)
ML030440064
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/11/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB5384
Download: ML030440064 (3)


Text

EDG LOPS 3.3.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Be in Mode 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met. D.2 Be in Mode 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. Required Action and E.1 Enter applicable Immediately associated Completion Condition(s) and Time of Condition B Required Action for not met. EDG made inoperable by EDG LOPS.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1 --------------------- NOTE------------------

When EDG LOPS instrumentation is placed in an inoperable status solely for performance of this Surveillance, entry into associated Conditions and Required Actions is not required provided the applicable Conditions(s) and Required Actions for the EDG made inoperable by EDG LOPS are entered.

Perform CHANNEL FUNCTIONAL TEST. 31 days SR 3.3.8.2 ------------------ NOTE---------------------

Voltage sensors may be excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION with setpoint 18 months Allowable Value as follows:

a. Degraded voltage Ž 3933 and
  • 3970 V with a time delay of 5.0 seconds

+/- 0.5 seconds; and

b. Sudden loss of voltage from full voltage to 0.0 V with a time delay of 7.8 seconds +/- 0.55 seconds at 0.0 V.

Crystal River Unit 3 3.3-21 Amendment No. 206

EDG LOPS B 3.3.8 BASES ACTIONS D.1 and D.2 (continued)

If the inoperable channel cannot be restored to OPERABLE status within the associated Completion Time, the plant must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required MODES from full power conditions in an orderly manner and without challenging plant systems.

E.1 Condition E is the default Condition should Required Action A.1 or B.1 not be met within the associated Completion Time.

Required Action E.1 ensures that Required Actions for affected diesel generator inoperabilities are initiated.

Depending on MODE, the Actions specified in LCO 3.8.1, "AC Sources-Operating," or LCO 3.8.2, are required to be entered immediately.

SURVEILLANCE SR 3.3.8.1 REQUIREMENTS A CHANNEL FUNCTIONAL TEST is performed on each required EDG LOPS channel to ensure the entire channel will perform the intended function. This test ensures functionality of each channel to output relays.

The Frequency of 31 days is considered reasonable based on the reliability of the components and on operating experience.

A Note has been added to allow performance of the SR without taking the ACTIONS for inoperable instrumentation channels although during this time period the relay instrumentation cannot initiate a diesel start. This allowance is based on the assumption that the EDG is maintained inoperable during this functional test and the appropriate actions for the inoperable EDG are entered.

(continued)

Crystal River Unit 3 B 3.3-71 Amendment No. 206