|
---|
Category:Management Directive
MONTHYEARML17018A1232017-01-17017 January 2017 Management Directive 8.3 Evaluation for Palo Verde Unit 3 Emergency Diesel Generator Failure ML0307105652003-03-12012 March 2003 Meeting Handouts of Review for 2002 -16 Pages 2017-01-17
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] |
Text
Review of 2002
- May 2002 Meeting with NRR
+ Review of Unit 2 Cycle 11
- Clad Performance Strategy
- Dry Cask Storage Update 2
I
Agenda Today
+ CEA Replacement
+ Dry Cask Storage Update Reactivity Management
+ Overview of INPO AFI
+ Palo Verde Actions
- Results 2
Overview
+ INPO Identified
- Reactivity Management AFI
"*REACTOR ENGINEERING
"*OPERATIONS 5
a M-ý LJkIýL Palo Verde Actions
+ NFM/Operations/Training Interface
+ Operations Single Point of Contact
+ Xenon Program
+ Training 6
3
Results
- Improved Inter-Departmental Relationships
- Improved Tools CENTS, RSG, U2 Uprate
- CENTS Implementation Status
CENTS Implementation Status
+ U1, U2 Complete - U3 April 2003
+ SABD Revision 20% Complete
+ Two Events Await U2 SER
- SGTR + LOP + SF
- Long Term FWLB (PSV Operability)
U2 RSG & Power Uprate
- Draft SER 3131 -- Final SER 6130
- SABD Supplement In Progress
- U2C12 Reload Safety Analyses Begun
- Actively Participating in Development of SG Startup Test Program 10 5
Fuel Performance
- Integrated Fuel Clad Strategy:
- Advanced Clad Alloys
- Primary Chemistry
- CRUD/Oxide Software
- Low Duty Core Designs
+ Long Range Fuel Inspection Plan N'I Advanced Clad Alloys
- Westinghouse Decision: Low Tin Zirlo
- Alloy A LTA in U3C1O (Spring 2003)
- First Batches of Standard Zirlo &
Columbia Fuel Rod
- U2Cll, UICll (2002)
- U3ClI In April 2003
+ Fuel Handling Accident Rod Pressure 12 \
Primary Chemistry
+ Additional RCS Cleaning at EOC Shutdown
+ Early Lithium Injection During Startups
+ Elevated-Coordinated Lithium Strategy
- Currently 7.1 pH
- Hold Until Inconel Corrosion Issue Resolved CRUD/Oxide Software
+ Steaming Rate in Core Design Tools
- Screen Patterns Against U3C9 Benchmark
+ APS CRUD/Oxide Model
- Nodal Level/High Duty Ass'y Rod Level
+ Vendor Fuel Duty Model
- Safety Grade Oxide and FDI Calculations 7
Low Duty Core Designs
+ Increase Feed Batch Size
- 104 vs 96 Assemblies
- UlCIO Visuals of P1M316
- U2 Uprate Corrosion Strategy
- Zirlo Clad
- Re-design Lattice Pattern IU, Re-Designed Lattice
+ Current Lattice
- 2 Enrichments
- 12 High Enrichment Rods on Each Face
+ New Lattice
- 3 Enrichments
- Same Assembly Average Enrichment
- All Peripheral Rods Low Enrichment
+ Extensive Design Review 16 8
Long Range Fuel Inspection Plan
+ Unit 2, Beginning Fall 2003
- Zirlo Oxidation (R11, R12, R13)
+ Lithium 3.5 PPM (R11, R12)
- Higher Burnup Leakers CPC Replacement
CPC Replacement Overview
+ Upgrade to Modern Hardware
- 8 CEA Calculators
- Concurrent Software Language Change
- Preserve Original Functionality & Timing
+ First Installation - Fall 2003 Outage 19 CPC Replacement Licensing
- SER on Westinghouse Common-Q
+ Schedule for Formal RA! on PVNGS
- No Impact to Safety &Uncertainty Analyses
- PVNGS Supports Joint Meeting 20 10
CEA Replacement
- Determination of New, Conservative Lifetime i
- Design of New Replacement CEAs
+ Replacement of PLCEAs Review of CEA History
- CEA Finger Failures Observed - 2001
- Cracks in High Fluence CEA Tips
- Root Cause - IASCC, Inadequate Testing
- U21U3 With Small Pellet Less Severe
+ All Full Length CEAs Replaced
- Replaced by Design with Smallest Pellet
+ Lifetime Software Abandoned 22 1I
Determination of New Lifetime
- Investigating Various Options
+ Monitoring YGN Inspections
. Vendor Has Adjusted Software 23 Design of New CEAs
+ Now: Unique Feltmetal Design
+ Want: Industry Standard AgInCd Tips
+ Tip Region Extended 4 Inches
- Hollow AgInCd Slugs 24, 12
Replacement of PLCEAs
- Part Length, Part Strength
- Not Subject to Same Failure Mode
- Reviewing Design Bases
- Full Length, Part Strength
- Transparent to Safety Analysis
- Tech Spec Change Required 25 Dry Cask Storage Update 26 13
Dry Cask Storage Update SCurrent status Unit 2
- Loaded 24 assemblies in first canister March 3
- Shield lid welded March 6
- Completed first vacuum drying period March 8
- March 10 will start 2nd vacuum drying period
.apturing lessons learned from first loading 26
Fuel Loading Schedule
- Complete first canister loading in March, 2003
- Time out for Unit 3 Refueling outage, ends early May, 2003
- Complete Unit 2 campaign in June
- Load 5 casks in Unit 1 later in 2003
+ Plan to load 10 casks per year 27
UMS Amendment 3
- Extended vacuum drying times
- Action statements won't require submersion of Transfer Cask and Canister for cooling
- Increased seismic limit
- Increased PWR fuel enrichment limit
+ Anticipate issuance early May 2003 28