September 2003 Monthly Operating Report for Point Beach
ML032950469
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/13/2003
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2003-0093
Download: ML032950469 (5)


Text

Nuac Committed to Nuclear Excellen, Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0093 GL 97-02 October 13, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORT - September 2003 In accordance with Technical Specification 5.6.3, attached is the Monthly Operating Report for September 2003 for the Point Beach Nuclear Plant. Nuclear Management Company has not made new or revised commitments in this letter or the attachment.

ag.Sa Sit ce President KML

Attachment:

NRC Monthly Report: September 2003 cc: Regional Administrator, Region III, USNRC NRC Resident Inspector - Point Beach Nuclear Plant Project Manager, Point Beach Nuclear Plant, NRR, USNRC J. D.Loock, PSCW 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 LZC69Y

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 10/06/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD September - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,337.5 237,936.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 6,329.2 234,387.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 366,330.0 3,219,164.5 108,770,473.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit I DATE: 10/13/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: Senternber 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (I) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit I average daily power for the month of September was 508.8 MWe.

There was one LER on Unit I in the month of September: LER 2003-002-00, Unit 1 Reactor Trip Due to Failure of IG06 Rod Drive MG Voltage Regulator

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 10/06/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD September - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,447.6 232,200.7
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 6,394.7 229,160.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 324,441.0 3,184,359.5 107,972,163.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 10/13/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: Sentember 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (I) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of September was 450.6 MWe.

There were no LERs on Unit 2 in the month of September.