ML033030109
ML033030109 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 10/29/2003 |
From: | Grace Kim NRC/OGC |
To: | Langer M US Federal Judiciary, Court of Appeals, for the District of Columbia Circuit |
References | |
03-1184 | |
Download: ML033030109 (3) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Legal-Correspondence
MONTHYEARML24141A1482024-05-17017 May 2024
[Table view]05.17.24 Supplemental Excerpts of Record ML24088A0252024-03-27027 March 2024 03.27.24 Respondents Motion for Extension ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML23354A0362023-12-19019 December 2023 12.19.23 Respondents Second 28(j) Letter ML23192A0252023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 3 (9th Cir.)(Case No. 23-852) ML23192A0212023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 1 (9th Cir.)(Case No. 23-852) ML23192A0192023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Index (9th Cir.)(Case No. 23-852) ML23192A0232023-07-0303 July 2023 7-3-23 Petitioners Excerpts of Record Volume 2 (9th Cir.)(Case No. 23-852) ML23161A0012023-06-0606 June 2023 6-6-23 Respondents Motion to Extend the Time to File the Certified Index (9th Cir.)(Case No. 23-852) ML23144A2482023-05-17017 May 2023 5-17-23 Motion to Intervene Filed by Pge (9th Cir.)(No. 23-852) ML23136A0132023-05-10010 May 2023 5-10-23 Slompf Mediation Questionnaire (9th Cir.)(Case No. 23-852) ML21067A4142021-03-0808 March 2021 3-8-21 Mandate from 9th Circuit - Public Watchdogs V NRC 9th Cir 20-70899(Filed) ML18337A0642018-11-26026 November 2018 Court Mandate - 11-26-2018 - Foe V NRC - DC Cir 16-1004 ML16314B6872016-11-0909 November 2016 Intervenors' Request for Documents and Records from the Nuclear Relation to Geology and Seismicity ML16057A1982016-02-25025 February 2016 Federal Respondent'S Response to Opposition to Petitioner'S Motion to Hold the Case in Abeyance 2-25-16 ML16043A4972016-02-11011 February 2016 Petitioners Certificate Parties 2-11-16 ML15012A5462014-12-12012 December 2014 14-1213(D.C.Cir.) Certified Index of Record (Filed) ML15007A5122014-12-0101 December 2014 Petitioner'S Filing of the Underlying Decision from Which the Petition Arises ML12137A0242012-05-15015 May 2012 Diablo Canyon - May Hearing File Update ML1030200242010-10-28028 October 2010 San Luis Obispo Mothers for Peace V. USNRC; No. 08-75058 - Oral Argument Scheduled for November 4, 2010 Before Judges Reinhardt, Thomas & Chief Judge Restani of the International Court of Trade ML0717601352007-05-0303 May 2007 5/3/2007 - Petitioner'S Reply to Respondents' Opposition to Motion for Attorneys Fees and Costs Between San Luis Obispo Mother for Peace V. USNRC and Pacific Gas & Electric Co; No. 03-74628 ML0717601492007-02-14014 February 2007 2/14/2007 - Corrected Petitioners Motion for Attorney'S Fees and Costs, Errata Sheet and Additional Declarations; No. 03-74628 ML0703305102006-11-17017 November 2006 No. 06-466; Letter from the Honorable William K. Suter Granting the Extension of Time ML0703304402006-11-16016 November 2006 No. 06-466; Letter to the Honorable William K. Suter Petition for a Writ of Certiorari ML0703304422006-10-25025 October 2006 Corrected Letter from the Honorable William K. Suter for the Extension of Time No. 06-466 ML0703304442006-10-23023 October 2006 Letter from William K. Suter, Clerk Response to the Petition for a Writ of Certiorari Granting Extension of Time ML0703305212006-10-20020 October 2006 Letter to the Honorable William K. Suter, Regarding Pacific Gas & Electric Company V. San Luis Obispo Mother for Peace, Et At. S. Ct No. 06-466 ML0703305182006-10-20020 October 2006 Letter to U.S. Supreme Court Docket No. 06-466 Requesting a 29-Day Extension of Time for Filing an Opposition to the Petition for Certiorari ML0622301182006-07-0606 July 2006 Reply to Petitioners' Response to Government'S Motion for Extension of Time within Which to File a Petition for Rehearing or Rehearing En Banc, Dated 07/06/2006 ML0622301172006-07-0505 July 2006 Petitioners' Response to Us Nrc'S Motion for Extension of Time to File Petition for Rehearing, Dated 07/05/2006 ML0622301232006-06-29029 June 2006 Federal Respondents' Motion for Extension of Time in Which to File a Petition for Rehearing En Banc, Dated 06/29/2006 ML0622301222006-06-0202 June 2006 Petition for Review of an Order of the Nuclear Regulatory Commission, Filed 06/02/2006 ML0533202202005-11-17017 November 2005 Federal Respondents' Fifth Filing Under Frap 28J, Dated 11/17/05 ML0531801412005-11-0909 November 2005 Federal Respondents' Fourth Filing Under Frap 28J, Dated 11/9/05 ML0533202592005-10-11011 October 2005 Federal Respondents' Second Filing Under Frap 28J, Dated 10/11/05 ML0503101152005-01-12012 January 2005 Original Mandate Transmitted to NRC, Dated 01/12/05 ML0436502262004-11-24024 November 2004 Letter to Court Clerk from G. Kim Clarification of a Post-Oral Argument Letter, Dated 11/24/04 ML0436502302004-11-19019 November 2004 Letter to Court Clerk from R. Mcdiarmid Information of e-mail Messages, Dated 11/19/04 ML0436502382004-11-15015 November 2004 Facsimile Message to Courtroom Deputy Clerk from G. Kim Oral Argument Schedules 11/19/04 ML0436502342004-11-15015 November 2004 Letter to Court Clerk from R. Mcdiarmid Oral Argument for 11/19/04, Dated 11/15/04 ML0421802322004-07-30030 July 2004 Errata Re Eighth and Final Fee Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for Winston & Strawn ML0421702892004-07-26026 July 2004 Final Application of Pricewaterhousecoopers Llp for Allowance and Payment of Compensation and Reimbursement of Expenses (September 1, 2002 Through February 28, 2003) ML0421004272004-07-21021 July 2004 Notice of Motion and the California Power Exchange Corporation Motion for Authority to Amend Prepetition Claim, Memorandum of Points and Authorities, Declaration of Marc S. Cohen in Support Thereof ML0421004302004-07-20020 July 2004 Notice of Application & California Power Exchange Corporation'S Application for Payment of Professional Compensation & Reimbursement of Expenses Under 11 U.S.C. 503(b)(3) & (4); Memorandum of Points and Authorities; Declarations of Cohen, R ML0420202962004-07-12012 July 2004 Eighth and Final Application for Allowance of Fees and Expenses of Winston & Strawn Llp (August 16, 2001 Through April 12, 2004) ML0420203032004-07-12012 July 2004 Exhibits in Support of Motion of the City of Palo Alto for Order Directing Payment of Reasonable Attorneys' Fees and Costs Pursuant to Section 503(b)(3)(D), 503(b)(3)(F) and 503(b)(4) ML0420302692004-07-12012 July 2004 Ninth Interim and Final Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (April 11, 2001 Through April 12, 2004); Declaration of Thomas E. Lumsden in Support Thereof ML0421004192004-07-0404 July 2004 Appendix of Exhibits in Support of the California Power Exchange Corporation'S Application for Payment of Professional Compensation and Reimbursement of Expenses Under 11 U.S.C. 503(b)(3) and (4) ML0416706302004-06-0707 June 2004 Modesto Irrigation District'S Response to Debtor'S Objection to Claim ML0415902522004-05-28028 May 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1 Through April 12, 2004 2024-05-17 Category:Legal-Correspondence/Maintenance MONTHYEARML0533202202005-11-17017 November 2005
[Table view]Federal Respondents' Fifth Filing Under Frap 28J, Dated 11/17/05 ML0531801412005-11-0909 November 2005 Federal Respondents' Fourth Filing Under Frap 28J, Dated 11/9/05 ML0533202592005-10-11011 October 2005 Federal Respondents' Second Filing Under Frap 28J, Dated 10/11/05 ML0503101152005-01-12012 January 2005 Original Mandate Transmitted to NRC, Dated 01/12/05 ML0436502262004-11-24024 November 2004 Letter to Court Clerk from G. Kim Clarification of a Post-Oral Argument Letter, Dated 11/24/04 ML0436502302004-11-19019 November 2004 Letter to Court Clerk from R. Mcdiarmid Information of e-mail Messages, Dated 11/19/04 ML0436502382004-11-15015 November 2004 Facsimile Message to Courtroom Deputy Clerk from G. Kim Oral Argument Schedules 11/19/04 ML0436502342004-11-15015 November 2004 Letter to Court Clerk from R. Mcdiarmid Oral Argument for 11/19/04, Dated 11/15/04 ML0421802322004-07-30030 July 2004 Errata Re Eighth and Final Fee Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for Winston & Strawn ML0421702892004-07-26026 July 2004 Final Application of Pricewaterhousecoopers Llp for Allowance and Payment of Compensation and Reimbursement of Expenses (September 1, 2002 Through February 28, 2003) ML0421004272004-07-21021 July 2004 Notice of Motion and the California Power Exchange Corporation Motion for Authority to Amend Prepetition Claim, Memorandum of Points and Authorities, Declaration of Marc S. Cohen in Support Thereof ML0421004302004-07-20020 July 2004 Notice of Application & California Power Exchange Corporation'S Application for Payment of Professional Compensation & Reimbursement of Expenses Under 11 U.S.C. 503(b)(3) & (4); Memorandum of Points and Authorities; Declarations of Cohen, R ML0420302692004-07-12012 July 2004 Ninth Interim and Final Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (April 11, 2001 Through April 12, 2004); Declaration of Thomas E. Lumsden in Support Thereof ML0420203032004-07-12012 July 2004 Exhibits in Support of Motion of the City of Palo Alto for Order Directing Payment of Reasonable Attorneys' Fees and Costs Pursuant to Section 503(b)(3)(D), 503(b)(3)(F) and 503(b)(4) ML0420202962004-07-12012 July 2004 Eighth and Final Application for Allowance of Fees and Expenses of Winston & Strawn Llp (August 16, 2001 Through April 12, 2004) ML0421004192004-07-0404 July 2004 Appendix of Exhibits in Support of the California Power Exchange Corporation'S Application for Payment of Professional Compensation and Reimbursement of Expenses Under 11 U.S.C. 503(b)(3) and (4) ML0416706302004-06-0707 June 2004 Modesto Irrigation District'S Response to Debtor'S Objection to Claim ML0416001862004-05-28028 May 2004 Cooley Godward Llp'S Thirty-Fifth Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1, 2004 - April 12, 2004 ML0416005722004-05-28028 May 2004 Rothschild Inc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1, 2004 - April 12, 2004 ML0416005602004-05-28028 May 2004 Deloitte & Touche Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses (March 1, 2004 to April 12, 2004) ML0415902522004-05-28028 May 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1 Through April 12, 2004 ML0415603342004-05-27027 May 2004 Howard, Rice, Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1, 2004 Through April 12, 2004 ML0415603072004-05-26026 May 2004 FTI Consulting Inc. Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1, 2004 to April 12, 2004 ML0415508302004-05-26026 May 2004 Steefel, Levitt & Weiss'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1-12 2004 ML0415603352004-05-25025 May 2004 Innisfree M&A Incorporated'S Fourth Interim Cover Sheet Application for Allowance and Payment of Compensation and Reimbursement of Expenses for the Period January 1, 2004 - April 12, 2004 ML0415902482004-05-25025 May 2004 Milbank, Tweed, Hadley & Mccloy Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1, 2004 Through April 12, 2004 ML0415404112004-05-24024 May 2004 Winston & Strawn Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1.2004 Through April 12 2004 ML0414900892004-05-21021 May 2004 Heller Ehrman White & Mcauliffe Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1, 2004, Through April 12, 2004 ML0415903242004-05-21021 May 2004 Public Policy Advocates Llc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for April 1, 2004 Through April 12, 2004 ML0414701812004-05-20020 May 2004 Legc, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1. 2004 to April 12 200 ML0413203762004-04-30030 April 2004 Saybrook Capital, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for March 1 Through March 31, 2004 ML0412705072004-04-30030 April 2004 Steefel, Levitt & Weiss'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period March 1-31, 2004 ML0413303832004-04-30030 April 2004 Rothschild Inc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period March 1, 2004 - March 31, 2004 ML0413303802004-04-30030 April 2004 Howard, Rice, Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for March. 2004 ML0413203702004-04-30030 April 2004 FTI Consulting Inc. Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for March 1, 2004 to March 31, 2004 ML0413202012004-04-30030 April 2004 Cooley Godward Llp'S Thirty-Fourth Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period March 1, 2004 - March 31, 2004 ML0413203752004-04-30030 April 2004 Heller Ehrman White & Mcauliffe Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period March 1, 2004, Through March 31, 2004 ML0412700262004-04-29029 April 2004 Winston & Strawn Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period, March 1. 2004 Through March 31. 2004 ML0412700412004-04-27027 April 2004 Keker & Van Nest'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period March 1, 2004 to March 31, 2004 ML0414701802004-04-23023 April 2004 Milbank, Tweed, Hadley & Mccloy Llp'S Cover Sheet - Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for March 2004 ML0412102292004-04-22022 April 2004 Lecg, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period 03/01-31/2004 ML0414701852004-04-15015 April 2004 Public Policy Advocates Llc'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for March 1, 2004 Through March 31, 2004 ML0414102072004-04-12012 April 2004 Keker & Van Nest'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period April 1, 2004 to April 12, 2004 ML0410703992004-03-31031 March 2004 FTI Consulting Inc. Cover Sheet Applications for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February 1, 2004 to February 29, 2004 ML0409804962004-03-31031 March 2004 Cooley Godward Llp'S Thirty-Third Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004 - February 29, 2004 ML0409704632004-03-30030 March 2004 Howard, Rice, Nemerovski, Canady, Falk & Rabkin Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February, 2004 ML0409704442004-03-30030 March 2004 Deloitte & Touche Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses (February 1, 2004, to February 29, 2004) ML0409704382004-03-29029 March 2004 Lecg, LLC Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004 to February 29, 2004 ML0409703622004-03-29029 March 2004 Skadden, Arps, Slate, Meagher & Flom Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004 Through February 29, 2004 ML0409805892004-03-26026 March 2004 Milbank, Tweed, Hadley & Mccloy Llp'S Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for February 2004 2005-11-09 Category:Status Report MONTHYEARDCL-22-080, Material Status Report for the Period Ending August 31, 20222022-09-28028 September 2022
[Table view]Material Status Report for the Period Ending August 31, 2022 DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-20-086, Material Status Report for the Period Ending August 31, 20202020-10-14014 October 2020 Material Status Report for the Period Ending August 31, 2020 DCL-19-085, Material Status Report for the Period Ending August 31, 20192019-10-17017 October 2019 Material Status Report for the Period Ending August 31, 2019 ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 DCL-16-025, Sixth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-29029 February 2016 Sixth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-01-0505 January 2016 Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events DCL-16-002, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-01-0505 January 2016 Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) DCL-15-098, Pacific Gas and Electric Company'S Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-26026 August 2015 Pacific Gas and Electric Company'S Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) DCL-15-099, Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) DCL-15-026, Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-23023 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) DCL-15-028, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-23023 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) DCL-14-015, Second Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-26026 February 2014 Second Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) DCL-13-080, Pacific Gas and Electric Company'S First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-22022 August 2013 Pacific Gas and Electric Company'S First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) DCL-13-033, Decommissioning Funding Report2013-04-0101 April 2013 Decommissioning Funding Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML0623700082006-05-0202 May 2006 SG Tube Inspection Summary, Table 2 & 3 ML0403400592004-01-28028 January 2004 Second 90-day Status Report for Ncpa V. NRC, No. 03-1184, Dated 01/28/04 ML0330301092003-10-29029 October 2003 Letter to M. Langer, Enclosing First 90-Day Status Report in Case 03-11284 ML0330300722003-10-29029 October 2003 Cover Letter to M. Langer Enclosing 90-Day Status Report, Dated 10/29/03 ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007922002-01-24024 January 2002 E-Mail from Allen Hiser to NRR Re Vhp Nozzle Status Report Update ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2022-09-28 |
Text
October 29, 2003 Mark J. Langer, Clerk U. S. Court of Appeals E. Barrett Prettyman U.S. Courthouse 333 Constitution Ave., N.W.
Washington, D.C. 20001 RE: NCPA v. NRC, No. 03-1184
Dear Mr. Langer:
Enclosed you will find an original and one copy of the first 90-day Status Report in the above-reference case. Please date stamp the enclosed copy of this letter to indicate date of receipt, and return the copy to me in the enclosed envelope, postage pre-paid, at your convenience.
Respectfully submitted,
/RA/
Grace H. Kim Senior Attorney Office of the General Counsel
Enclosure:
As stated cc: service list
UNITED STATES COURT OF APPEALS DISTRICT OF COLUMBIA CIRCUIT Northern California Power Agency )
)
Petitioner, )
)
- v. ) No. 03-1038
)
U.S. Nuclear Regulatory Commission )
and United States of America, )
)
Respondents. )
__________________________________ )
STATUS REPORT This status report is filed pursuant to this Courts Order dated August 1, 2003, which granted Petitioners motion to suspend the briefing schedule and hold proceedings in this case in abeyance, pending resolution of the proposed settlement in Intervenor Pacific Gas and Electric Companys (PG&E) Chapter 11 bankruptcy case, and directed Respondent Nuclear Regulatory Commission (NRC) to file status reports at 90-day intervals beginning 90 days from the date of the Order. The attached letter from PG&Es counsel details the current status of the proposed settlement agreement in PG&Es bankruptcy case.
Respectfully submitted,
_________/RA/___________
Grace H. Kim Senior Attorney Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 415-3605
CERTIFICATE OF SERVICE I hereby certify that on October 29, 2003, copies of the foregoing Status Report were served by mail, postage prepaid, upon the following counsel:
David A. Repka, Esq.
Brooke Poole, Esq.
Winston & Strawn LLP 1400 L Street, N.W.
Washington, D.C. 20005-3502 Robert C. McDiarmid, Esq.
Ben Finkelstein, Esq.
Andrea G. Lonian, Esq.
Spiegel & McDiarmid 1333 New Hampshire Avenue, N.W.
James D. Pembroke, Esq.
Lisa S. Gast, Esq.
Duncan, Weinberg, Genzer & Pembroke, P.C.
1615 M Street, N.W., Suite 800 Washington, D.C. 20036-3203
_________/RA/________________
Grace H. Kim