Letter Sequence RAI |
---|
|
|
MONTHYEARML0330904002003-11-10010 November 2003 Request for Additional Information, Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0335000942004-01-0606 January 2004 Request for Additional Information for License Amendment Request, Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0402006692004-01-16016 January 2004 RAI, Increase in Main Steamline Turbine Building High Temperature Trip Setpoint Allowable Value (Tac. No. MC0342) Project stage: RAI ML0403701412004-01-22022 January 2004 Response to RAI Regarding License Amendment Request to Increase Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: Response to RAI ML0408605702004-03-31031 March 2004 Request for Additional Information (Rai), Review of License Amendment Request to Increase the Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: RAI ML0413402602004-05-0606 May 2004 Response to Second Request for Additional Information Regarding License Amendment Request to Increase Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value Project stage: Request ML0418106862004-07-0909 July 2004 Amendment, Primary Containment and Drywell Isolation Instrumentation Project stage: Other ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature Project stage: Approval ML0423606802004-08-26026 August 2004 Letter, Correction to Safety Evaluation Report in Support of License Amendment 130. TAC No. MC0342 Project stage: Approval 2004-01-06
[Table View] |
Similar Documents at Perry |
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML22234A1482022-08-22022 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22182A4442022-07-0202 July 2022 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010 ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22130A5662022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML21168A0662021-06-17017 June 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010 ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 ML21020A0392021-01-20020 January 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000440/2021010 ML20325A2782020-11-20020 November 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Part 73 Force-on-Force Exemption ML20289A1012020-10-0505 October 2020 NRR E-mail Capture - Final 2nd Round RAI - Perry Request for Relief - Proposed Alternative Request IR-056, Rev. 3 ML20191A0192020-07-0101 July 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Extension to License Expiration Date by Recapturing Low-Power Testing Time ML20133K0632020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20127H8692020-05-0606 May 2020 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request IR-054, Rev. 2 ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML19035A6552019-02-19019 February 2019 Request for Additional Information Related to the Deferral of Actions Related to Beyond-Design-Basis Flooding Hazard Reevaluations for Perry Nuclear Power Plant. ML18277A2372018-10-0202 October 2018 NRR E-mail Capture - RAI Related to Perry Request for Alternative PR-2 ML18271A2082018-09-27027 September 2018 NRR E-mail Capture - RAI Related to Request to Revise Perry'S Technical Specifications to Extend Containment Leak Rate Test Intervals ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18009A0112018-01-0808 January 2018 NRR E-mail Capture - Final RAI for Perry LAR Related to AST Implementation ML18008A0282017-12-13013 December 2017 NRR E-mail Capture - Draft RAI for Perry LAR to Revise TSs for AST ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17160A1102017-06-0707 June 2017 17 Perry Nuclear Power Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17143A3592017-05-22022 May 2017 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000440/2017008 (Njfa) ML17115A4212017-04-25025 April 2017 NRR E-mail Capture - Withdrawal of Draft RAI Regarding Perry'S LAR Re TSTF-501, Revision 1 ML17114A1532017-04-0606 April 2017 NRR E-mail Capture - Draft RAI for Perry LAR Re TSTF-501, Revision 1 ML16364A2482016-12-28028 December 2016 Notification of NRC Baseline Inspection and Request for Information 05000440/2017001 ML16327A0182016-11-23023 November 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation and Drain Down of the Reactor Cavity Portion of the Upper Containment Pool (TAC MF7476) (L-16-083) ML16279A0432016-10-0606 October 2016 Request for Additional Information Related to License Amendment Request for Upper Containment Pool Gate Installation During Modes 1, 2, & Drain Down of Upper Containment Pool During Mode 3 IR 05000440/20215012016-04-19019 April 2016 Perry Nuclear Power Plant - Request for Additional Information Regarding VIO 05000440/215010-01 ML16067A2812016-03-10010 March 2016 Request for Additional Information Related to Emergency Action Level Scheme Change License Amendment Request (CAC No. MF7046)(L-15-257) ML16064A2792016-03-0101 March 2016 NRR E-mail Capture - Perry EAL Scheme Change LAR (CAC No. MF7046) Draft Request for Additional Information IR 05000440/20150102016-02-0101 February 2016 Ltr. 02/01/16 Request for Additional Information VIO 05000440/2015010-01. (Jgc) ML15351A0312015-12-18018 December 2015 Request for Additional Information Related to Application for Transfer of Control of License and Conforming License Amendment (CAC No. MF6412)(L-15-195) ML15096A0512015-04-13013 April 2015 Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies ML15034A6132015-03-0303 March 2015 Request for Additional Information Regarding Phase 2 Staffing Assessment Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Request Regarding Near-Term Task Force Recommendation 9.3 ML15022A1802015-01-21021 January 2015 Request for Inspection ML15012A6572015-01-20020 January 2015 Request for Additional Information Concerning Changes to Safety Limit Minimum Critical Power Ratio During Single Loop Operation (TAC No. Mf 5007)(L-14-325) ML15014A2832015-01-15015 January 2015 Request for Additional Information Concerning Alternative Accident Source Term Design Bases (TAC No. MF3197)(L-13-306) ML14323A6662014-12-0303 December 2014 Request for Additional Information Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML14232A2252014-09-0909 September 2014 Request for Additional Information Concerning Relocation of Surveillance Frequencies to Control Licensee Control (TAC No. MF3720)(L-14-106) 2023-08-15
[Table view] |
Text
November 10, 2003 Mr. William R. Kanda, Vice President - Nuclear FirstEnergy Nuclear Operating Company 10 Center Road P.O. Box 97 Perry, OH 44081
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR LICENSE AMENDMENT REQUEST (LAR), INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE (TAC. NO. MC0342)
Dear Mr. Kanda:
By letter dated August 14, 2003, FirstEnergy Nuclear Operating Company (FENOC), requested approval of a license amendment request (LAR) for the Perry Nuclear Power Plant (PNPP).
The proposed LAR increases the analytical limit and the resulting Technical Specification Allowable Value (AV) related to the setpoint for the main steam line turbine building temperature - high, system isolation function.
During the review, the NRC staff has identified that additional information is needed in order to complete the review. Specific questions are presented in the attached request for additional information (RAI).
The enclosed questions have already been discussed with your staff. In order to accommodate PNPPs needs, please respond to this RAI by December 15, 2003. If you have any questions concerning our review, or additional time is needed to respond to the RAI, please contact me at (301) 415-3154.
Sincerely,
/RA/
Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440 Enclosure : Request for Additional Information cc w/encl: See next page
November 10, 2003 Mr. William R. Kanda, Vice President - Nuclear FirstEnergy Nuclear Operating Company 10 Center Road P.O. Box 97 Perry, OH 44081
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR LICENSE AMENDMENT REQUEST (LAR), INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE (TAC. NO. MC0342)
Dear Mr. Kanda:
By letter dated August 14, 2003, FirstEnergy Nuclear Operating Company (FENOC), requested approval of a license amendment request (LAR) for the Perry Nuclear Power Plant (PNPP).
The proposed LAR increases the analytical limit and the resulting Technical Specification Allowable Value (AV) related to the setpoint for the main steam line turbine building temperature - high, system isolation function.
During the review, the NRC staff has identified that additional information is needed in order to complete the review. Specific questions are presented in the attached request for additional information (RAI).
The enclosed questions have already been discussed with your staff. In order to accommodate PNPPs needs, please respond to this RAI by December 15, 2003. If you have any questions concerning our review, or additional time is needed to respond to the RAI, please contact me at (301) 415-3154.
Sincerely,
/RA/
Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIII-2 r/f AMendiola THarris SSands OGC ACRS GGrant, RIII ADAMS Accession Number: ML033090400 OFFICE PM:LPD3-2 LA:LPD3-2 SC:LPD3-2 NAME SSands THarris DPickett for AMendiola DATE 11/07/03 11/07/03 11/10/03 OFFICIAL RECORD COPY
Perry Nuclear Power Plant, Unit 1 cc:
Mary E. OReilly Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St. 2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident Inspectors Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Dennis Clum Regional Administrator, Region III Radiological Assistance Section Supervisor U.S. Nuclear Regulatory Commission Bureau of Radiation Protection 801 Warrenville Road Ohio Department of Health Lisle, IL 60532-4531 P.O. Box 118 Columbus, OH 43266-0118 Sue Hiatt OCRE Interim Representative Zack A. Clayton 8275 Munson DERR Mentor, OH 44060 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Mr. Vernon K. Higaki P.O. Box 1049 Manager - Regulatory Affairs Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Chairman P.O. Box 97, A210 Perry Township Board of Trustees 10 Center Road 3750 Center Road, Box 65 Perry, OH 44081 Perry, OH 44081 Timothy Rausch, Plant Manager Daniel Z. Fisher FirstEnergy Nuclear Operating Company Transportation Department Perry Nuclear Power Plant Public Utilities Commission P.O. Box 97, SB306 180 East Broad Street Perry, OH 44081 Columbus, OH 43215-3793 Mayor, Village of North Perry Mr. William R. Kanda North Perry Village Hall Vice President - Nuclear, Perry 4778 Lockwood Road FirstEnergy Nuclear Operating Company North Perry Village, OH 44081 Perry Nuclear Power Plant P.O. Box 97, A200 Donna Owens, Director 10 Center Road Ohio Department of Commerce Perry, OH 44081 Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009
REQUEST FOR ADDITIONAL INFORMATION PERRY NUCLEAR POWER PLANT (PNPP)
INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE The Nuclear Regulatory Commission (NRC) staff has reviewed the August 14, 2003, FENOC submittal regarding changes to the Perry Nuclear Power Plant license amendment request to increase the main steam line turbine building temperature - high, system isolation function, and has the following questions concerning the submittal:
(1) Provide a description of the GOTHIC nodal model (include the GOTHIC version number) used to model the building (volumes, flow paths, active heat removal systems and heat structures, and their initial conditions). Identify the model used for the break flow, the model(s) used for heat transfer to structures, and the model used for flow between volumes. If the GOTHIC jet breakup model is used, provide justification to support its use for this application.
(2) Provide a benchmark of the GOTHIC model to the current COMPARE model using GOTHIC models which closely resemble COMPARE.
(3) Provide electronic copy(ies) of the GOTHIC input deck(s) (*.GTH) for the model used for the LAR. The staff may perform independent, confirmatory analyses with the CONTAIN 2.0 code. In addition, the input deck should provide the full description of the nodal models and the GOTHIC models used for the LAR.