Request for Additional Information, Increase in Main Steam Line Turbine Building High Temperature Trip Setpoint Allowable Value
ML033090400
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/10/2003
From: Sands S
NRC/NRR/DLPM/LPD3
To: Kanda W
FirstEnergy Nuclear Operating Co
Sands S, 415-3154, NRR/DLPM
References
TAC MC0342
Download: ML033090400 (4)


Text

November 10, 2003 Mr. William R. Kanda, Vice President - Nuclear FirstEnergy Nuclear Operating Company 10 Center Road P.O. Box 97 Perry, OH 44081

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR LICENSE AMENDMENT REQUEST (LAR), INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE (TAC. NO. MC0342)

Dear Mr. Kanda:

By letter dated August 14, 2003, FirstEnergy Nuclear Operating Company (FENOC), requested approval of a license amendment request (LAR) for the Perry Nuclear Power Plant (PNPP).

The proposed LAR increases the analytical limit and the resulting Technical Specification Allowable Value (AV) related to the setpoint for the main steam line turbine building temperature - high, system isolation function.

During the review, the NRC staff has identified that additional information is needed in order to complete the review. Specific questions are presented in the attached request for additional information (RAI).

The enclosed questions have already been discussed with your staff. In order to accommodate PNPPs needs, please respond to this RAI by December 15, 2003. If you have any questions concerning our review, or additional time is needed to respond to the RAI, please contact me at (301) 415-3154.

Sincerely,

/RA/

Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440 Enclosure : Request for Additional Information cc w/encl: See next page

November 10, 2003 Mr. William R. Kanda, Vice President - Nuclear FirstEnergy Nuclear Operating Company 10 Center Road P.O. Box 97 Perry, OH 44081

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) FOR LICENSE AMENDMENT REQUEST (LAR), INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE (TAC. NO. MC0342)

Dear Mr. Kanda:

By letter dated August 14, 2003, FirstEnergy Nuclear Operating Company (FENOC), requested approval of a license amendment request (LAR) for the Perry Nuclear Power Plant (PNPP).

The proposed LAR increases the analytical limit and the resulting Technical Specification Allowable Value (AV) related to the setpoint for the main steam line turbine building temperature - high, system isolation function.

During the review, the NRC staff has identified that additional information is needed in order to complete the review. Specific questions are presented in the attached request for additional information (RAI).

The enclosed questions have already been discussed with your staff. In order to accommodate PNPPs needs, please respond to this RAI by December 15, 2003. If you have any questions concerning our review, or additional time is needed to respond to the RAI, please contact me at (301) 415-3154.

Sincerely,

/RA/

Stephen P. Sands, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC PDIII-2 r/f AMendiola THarris SSands OGC ACRS GGrant, RIII ADAMS Accession Number: ML033090400 OFFICE PM:LPD3-2 LA:LPD3-2 SC:LPD3-2 NAME SSands THarris DPickett for AMendiola DATE 11/07/03 11/07/03 11/10/03 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit 1 cc:

Mary E. OReilly FirstEnergy Corporation 76 South Main St.

Akron, OH 44308 Resident Inspectors Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4531 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Mr. Vernon K. Higaki Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A210 10 Center Road Perry, OH 44081 Timothy Rausch, Plant Manager FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Zack A. Clayton DERR Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081 Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A200 10 Center Road Perry, OH 44081

REQUEST FOR ADDITIONAL INFORMATION PERRY NUCLEAR POWER PLANT (PNPP)

INCREASE IN MAIN STEAM LINE TURBINE BUILDING HIGH TEMPERATURE TRIP SETPOINT ALLOWABLE VALUE The Nuclear Regulatory Commission (NRC) staff has reviewed the August 14, 2003, FENOC submittal regarding changes to the Perry Nuclear Power Plant license amendment request to increase the main steam line turbine building temperature - high, system isolation function, and has the following questions concerning the submittal:

(1)

Provide a description of the GOTHIC nodal model (include the GOTHIC version number) used to model the building (volumes, flow paths, active heat removal systems and heat structures, and their initial conditions). Identify the model used for the break flow, the model(s) used for heat transfer to structures, and the model used for flow between volumes. If the GOTHIC jet breakup model is used, provide justification to support its use for this application.

(2)

Provide a benchmark of the GOTHIC model to the current COMPARE model using GOTHIC models which closely resemble COMPARE.

(3)

Provide electronic copy(ies) of the GOTHIC input deck(s) (*.GTH) for the model used for the LAR. The staff may perform independent, confirmatory analyses with the CONTAIN 2.0 code. In addition, the input deck should provide the full description of the nodal models and the GOTHIC models used for the LAR.