NLS2004073, Use of Encryption Software for Electronic Transmission of Safeguards Information

From kanterella
Revision as of 15:46, 17 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Use of Encryption Software for Electronic Transmission of Safeguards Information
ML041560300
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/28/2004
From: Edington R
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2004073, RIS-02-015
Download: ML041560300 (3)


Text

Nebraska Public Power District Always there when you need us NLS2004073 May 28, 2004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

References:

1. 10 CFR 73.21
2. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2002-15

Subject:

Use of Encryption Software for Electronic Transmission of Safeguards Information, Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46 The purpose of this letter is to request approval for Nebraska Public Power District (NPPD) to process and transmit Safeguards Information (SGI) using PGP Software Corporate Desktop Version 8.0 or the latest validated version, developed with PGP Software Development Kit (SDK) 3.0.3, pursuant to the requirements of 10 CFR 73.21(g)(3). The National Institute of Standards and Technology Certificate 394 validates compliance of this SDK with FIPS 140-2 requirements.

An information protection system for SGI that meets the requirements of 10 CFR 73.21(b) through (i) has been established and is being maintained. Prior to the first use of encryption software for SGI material, written procedures shall be in place to describe, as a minimum: access controls; where and when encrypted communications can be made; how encryption keys, codes and passwords will be protected from compromise; actions to be taken if the encryption keys, codes or passwords are, or are suspected to have been, compromised (for example, notification of all authorized users); and how the identity and access authorization of the recipient will be verified.

NPPD intends to exchange SGI with the NRC, Nuclear Energy Institute (NEI), and other SGI holders who have received NRC approval to use PGP software. Mr. Marty Faulkner, Security Manager, is responsible for the overall implementation of the SGI encryption program at NPPD. Mr. Patrick Carlock, Security Operations Supervisor, is responsible for collecting, safeguarding, and dissemination the software tools needed for encryption and disseminating the software tools needed for encryption and decryption of SGI.

04 COOPER NUCLEARSTATION P.O. Box 98 / Brwnville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS2004073 Page 2 Pursuant to 10 CFR 73.21 (g)(3), the transmission of encrypted material to other authorized SGI holders, who have received NRC approval to use PGP software, would be considered a protected telecommunications system. The transmission and dissemination of unencrypted SGI is subject to the provisions of 10 CFR 73.21(g)(1) and (2).

Should you have any questions or require additional information, please contact Mr. Paul Fleming, Licensing Manager at 402-825-2774.

iUt; /e Randall K. Edington Vice President-Nuclear and Chief Nuclear Officer

/nr cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC NPG Distribution CNS Records Scott Morris USNRC, Office of Nuclear Security and Incident Response, Reactor Security Section Lynn Silvious USNRC, Office of Nuclear Security and Incident Response, Information Security Section Louis Grosman USNRC, Office of the Chief Information Officer James Davis, Nuclear Energy Institute

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© Correspondence Number: NLS2004073 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE Prior to the first use of encryption software for SGI material, written procedures shall be in place to describe, as a minimum: access controls; where and when encrypted communications can be made; how Prior to first use for encryption keys, codes and passwords will be protected from SGI material.

compromise; actions to be taken if the encryption keys, codes or passwords are, or are suspected to have been, compromised (for example, notification of all authorized users); and how the identity and access authorization of the recipient will be verified.

4 4

4 4

4 4

t 4

PROCEDURE 0.42 l REVISION 15 l PAGE 18 OF 24 l