April 2004 Revised Monthly Operating Report for Point Beach, Units 1 and 2
ML041740740
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/04/2004
From: Vanmiddlesworth G
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0061
Download: ML041740740 (9)


Text

N Committed to Nuclear M__

Excellen Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC June 4, 2004 NRC 2004-0061 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report

Reference:

1) Revised Monthly Operating Report forApril 2004.

In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for May 2004 for the Point Beach Nuclear Plant, Units 1 and 2.

Reference 1 is a revision to the outage hours on the April Monthly Operating Report for Unit 1. Enclosure 2 contains the revised operating report for Unit 1.

This letter contains no new commitments and revisions to existing commitments.

Ga . Van Middlesworth Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosures cc: Administrator, Region l1l, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 06/02/04 COMPLETED BY Kin M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2004

2. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,234.0 242,379.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 2,233.5 238,830.2
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWWH) 0.0 1,128,487.0 111,022,799.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 06/02/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: May 2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS 01 04/03/04 S 1413.5 C 4 U1R28 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 remained in scheduled refueling outage for the month of May.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 06/02/04 COMPLETED BY Kin M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD May - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 668.9 3,571.9 236,919.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 633.9 3,536.9 233,773.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 325,084.0 1,834,195.0 110,335,276.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 06/02/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Mav 2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS See Summary section below 1 05/15 F 110.1 H 2 A Root Cause Evaluation is being conducted. RCE 00259 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of May was 436.9 MWe.

Unit 2 was taken off line on May 15 after a diver was drawn towards the plant intake structure in Lake Michigan while performing scheduled inspections.

There was one LER issued in May for unit 2; LER 2004-001-00, Safety Injection System Accumulator Operated With Fluid Level Out Of Specification High.

ENCLOSURE 2 REVISED UNIT 1 APRIL 2004 MONTHLY OPERATING REPORT 2 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 05/21/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD April - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 50.0 2,234.0 242,379.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 49.5 2,233.5 238,830.2
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 20,584.5 1,130,453.0 111,024,765.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 05/04/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Anril 2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE, NO. DATE F: FORCED DURATION REASON (1) SHUTITING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS 01 04/03/04 S 669.5 C 1 U1R28 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMMARY:

While preparing to inspect the Unit 1 Steam Generator on Friday April 9, 2004, the scheduled sequence for Steam Generator nozzle dam installation was not followed.

There were no LERs for Unit 1 in the month of April.