ML042120452

From kanterella
Revision as of 01:14, 17 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Meeting with Arizona Public Service Company - Predecisional Enforcement - August 20, 2004
ML042120452
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/30/2004
From: Gody A
NRC Region 4
To:
References
EA-04-100
Download: ML042120452 (7)


Text

July 30, 2004

SUBJECT:

MEETING WITH ARIZONA PUBLIC SERVICE COMPANY FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3 DOCKET: 50-528; 50-529; 50-530 EA: EA-04-100 DATE & TIME: Friday, August 20, 2004 1-2:30 p.m.

LOCATION: Nuclear Regulatory Commission, Region IV Technical Training Conference Room 611 Ryan Plaza Drive, Suite 611 Arlington, Texas 76011 PURPOSE: The purpose of this meeting is a predecisional enforcement conference to discuss an apparent willful violation of 10 CFR Part 50, Appendix B, Criterion XVI, as described in the NRC Inspection Report 05000528; 529; 530/2004-011 dated July 8, 2004, to Arizona Public Service Company.

CATEGORY: Not Applicable. This meeting is closed to public observation because it is based, in part, on an investigation report that has not been made public.

PARTICIPANTS: Participants from the NRC include members of Region IV and the Office of Nuclear Reactor Regulation (NRR).

NRC B. Mallett, Regional Administrator M. Vasquez, Enforcement Specialist D. Chamberlain, Director, Division of Reactor Safety V. Ordaz, Acting Deputy Director, Division of Reactor Safety A. Howell, Director, Division of Reactor Projects C. Marschall, Acting Deputy Director, Division of Reactor Projects T. Pruett, Chief, Projects Branch D, Division of Reactor Projects

Arizona Public Power Company August 20, 2004 Meeting D. Powers, Senior Technical Analyst, Division of Reactor Safety C. Paulk, Senior Projects Engineer, Division of Reactor Projects P. Gage, Senior Operations Engineer, Operations Branch J. Drake, Operations Engineer, Operations Branch K. Clayton, Operations Engineer, Operations Branch Victor Gonzalez, Mexico Comision Nacional de Seguridad Nuclear y Salvaguardias UTILITY G. Overbeck, Senior Vice President, Nuclear S. Bauer, Department Leader, Regulatory Affairs J. Gutierrez, Senior Consultant, Morgan Lewis M. Berryman, Operator M. OConnor, Operator R. Huffman, Operator MEETING CONTACT: A. Gody, NRC, RIV 817-860-8159 ATG@nrc.gov DISTRIBUTION:

Gregg R. Overbeck, Senior Vice President, Nuclear Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034 Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040

Arizona Public Power Company August 20, 2004 Meeting M. Dwayne Carnes, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Cheryl Adams Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, CA 92672 Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326

Arizona Public Power Company August 20, 2004 Meeting E-Mail To:

(BM, GS, DDC, VO, ATH, CSM, TWP, CJP, PCG, KC) NRC Attendees OEWEB S. Bogle (for predecisional enf. or regulatory conferences)

PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT JWC1 J. Craig, Associate Director for Inspections & Programs OEMAIL D/OE RLF2 R. Franovich, NRR Enforcement Coordinator TXR T. Reis JLD J. Dixon-Herrity, RIV EDO Coordinator

( ) Mel Fields, Project Manager, NRR

( ) G. Warnick, Senior Resident Inspector VLD V. Dricks, PAO (also on concurrence)

WAM W. Maier, RSLO (also on concurrence)

GFS G. Sanborn, EO GMV M. Vasquez, ES (SHL S. Lewis, OGC JAC1, CJG RA Secretaries LAO, DLF, MJS DRP Division LMB, NLH, JLH2 DRS Division CMS, JAK, BST1 DNMS Division JLP J. Pellet, IRM LPL P. Longdo ADAMS: :Yes

  • No Initials: _ATG_____
Publicly Available
  • Non-Publicly Available
  • Sensitive : Non-Sensitive OE:OB C:OB D:ACES PAO RSLO D:DRS JFDrake/lmb ATGody GFSanborn VDricks WMaier DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/ /RA/

7/30/04 7/30/04 7/30/04 7/30/04 7/30/04 7/30/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax