MONTHYEARML0401501832004-01-21021 January 2004 Request for Additional Information for Proposed Amendment Re Turbine Building Service Water Header Isolation Logic Project stage: RAI ML0408505472004-03-17017 March 2004 Response to RAI Related to License Amendment Request 197 to Kewaunee Technical Specifications Project stage: Response to RAI ML0414801582004-05-18018 May 2004 Response to Request for Additional Information Related to License Amendment Request 197 to the Kewaunee Nuclear Power Plant Technical Specifications Project stage: Response to RAI ML0423904602004-08-18018 August 2004 Response to Request for Additional Information Related to License Amendment Request 197 to the Kewaunee Nuclear Power Plant Technical Specifications Project stage: Response to RAI ML0427300902004-09-24024 September 2004 Technical Specification Pages for Amendment No. 177 Turbine Building Service Water Header Isolation (TS) S110810 Project stage: Other ML0416100952004-09-24024 September 2004 Issuance of Amendment No. 177 Re. Revision of TS 3.3.e, Service Water System Project stage: Approval 2004-05-18
[Table View] |
|
---|
Category:Technical Specification
MONTHYEARML16097A4172016-03-29029 March 2016 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14106A4502014-04-0303 April 2014 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14009A3932014-01-0707 January 2014 Supplement 2: License Amendment Request 256, Permanently Defueled License and Technical Specifications ML13108A1832013-04-0505 April 2013 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML12109A2302012-04-10010 April 2012 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML11252A6562011-08-30030 August 2011 License Amendment Request 244, Radiological Accident Analysis and Discussion of Associated Technical Specification Changes, Attachment 4 ML11252A6542011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating Technical Specifications Bases Pages, Attachment 3 ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 ML1011206552010-04-14014 April 2010 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML1011101232010-04-13013 April 2010 License Amendment Request 246: Revision to Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Limitations ML0910607252009-04-0707 April 2009 Submittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0902602992009-01-23023 January 2009 License Amendment Request 247: Emergency Diesel Generator Fuel Oil Technical Specification Changes ML0823200832008-08-14014 August 2008 License Amendment Request 229, Change Technical Specifications to Require Testing Containment Purge and Vent Isolation Valves When the Reactor Is Above Cold Shutdown ML0810700722008-04-0808 April 2008 Transmittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0726201442007-09-14014 September 2007 License Amendment Request 210 - Technical Specification Modifications Regarding Control Room Envelope Habitability ML0712101852007-04-26026 April 2007 Supplement to License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing. ML0701200882007-01-10010 January 2007 License Amendment Request 230 Emergency Diesel Generator Short-Time Load Testing ML0624201332006-08-29029 August 2006 Tech Specs, Correction Amendment 188 ML0615601442006-06-0202 June 2006 Response to NRC Request for Additional Information Re License Amendment Request 218: Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0604504872006-02-0606 February 2006 License Amendment Request - 219, One-Time Extension of Surveillance Requirements ML0602505242006-01-12012 January 2006 License Amendment Request 218 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0517200282005-06-20020 June 2005 (TS) Issuance of Amendment Auxiliary Feedwater System ML0505302282005-02-10010 February 2005 Response to NRC Request for Additional Information License Amendment Request 203 to the Kewaunee Nuclear Power Plant Technical Specifications, Rod Position Indication. ML0435800062004-12-22022 December 2004 Tech Specs - Issuance of Amendment Deletion of Requirements for Submittal of Occupational Radiation Exposure Reports, Reports of Challenges to and Failures of the Pressurizer Power Operated Relief Valves and Safety ML0427300902004-09-24024 September 2004 Technical Specification Pages for Amendment No. 177 Turbine Building Service Water Header Isolation (TS) S110810 ML0423904602004-08-18018 August 2004 Response to Request for Additional Information Related to License Amendment Request 197 to the Kewaunee Nuclear Power Plant Technical Specifications ML0421603022004-07-19019 July 2004 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0416205032004-05-25025 May 2004 License Amendment Request 203 Re Technical Specifications on Rod Position Indication ML0413803552004-05-13013 May 2004 Amd No. 174, Tech Spec, Relocation of Requirements for Hydrogen Monitors ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0402901202004-01-16016 January 2004 License Amendment Request 201 to the Kewaunee Nuclear Power Plant Technical Specifications, Equipment Hatch and Control Room Post Accident Recirculation System. ML0335704692003-12-12012 December 2003 License Amendment Request 198, ILRT 5-Year Extension, NMC Response to NRC Request for Additional Information. ML0332505592003-11-20020 November 2003 Tech Spec Pages for Amendment No. 171, Revising the Reporting Requirements for the Discovery of Defective or Degraded Steam Generator Tubes ML0321706442003-07-25025 July 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0318206132003-06-20020 June 2003 License Amendment Request 198 to Kewaunee TS for One Time Extension of Containment Integrated Leak Rate Test Interval ML0316813912003-06-0909 June 2003 Bases Revisions to the Kewaunee Nuclear Power Plant Technical Specifications 4.4 and 4.12 ML0314205282003-05-15015 May 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0233803042002-11-22022 November 2002 License Amendment Request 189 to Kewaunee TS Regarding Modification of Diesel Generator Inspection Requirements ML0231104142002-10-29029 October 2002 Bases Revision to Kewaunee Nuclear Power Plant TS ML0214402322002-05-0707 May 2002 Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process ML0208805202002-03-19019 March 2002 Bases Revision Technical Specifications 2.2, Safety Limit - Reactor Coolant System Pressure. ML0203103642002-01-0303 January 2002 Bases Revisions to the Kewaunee Power Plant Technical Specifications 2016-03-29
[Table view] Category:Amendment
MONTHYEARML11252A6562011-08-30030 August 2011 License Amendment Request 244, Radiological Accident Analysis and Discussion of Associated Technical Specification Changes, Attachment 4 ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 ML0823200832008-08-14014 August 2008 License Amendment Request 229, Change Technical Specifications to Require Testing Containment Purge and Vent Isolation Valves When the Reactor Is Above Cold Shutdown ML0726201442007-09-14014 September 2007 License Amendment Request 210 - Technical Specification Modifications Regarding Control Room Envelope Habitability ML0712101852007-04-26026 April 2007 Supplement to License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing. ML0624201332006-08-29029 August 2006 Tech Specs, Correction Amendment 188 ML0604504872006-02-0606 February 2006 License Amendment Request - 219, One-Time Extension of Surveillance Requirements ML0602505242006-01-12012 January 2006 License Amendment Request 218 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0517200282005-06-20020 June 2005 (TS) Issuance of Amendment Auxiliary Feedwater System ML0435800062004-12-22022 December 2004 Tech Specs - Issuance of Amendment Deletion of Requirements for Submittal of Occupational Radiation Exposure Reports, Reports of Challenges to and Failures of the Pressurizer Power Operated Relief Valves and Safety ML0427300902004-09-24024 September 2004 Technical Specification Pages for Amendment No. 177 Turbine Building Service Water Header Isolation (TS) S110810 ML0413803552004-05-13013 May 2004 Amd No. 174, Tech Spec, Relocation of Requirements for Hydrogen Monitors ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0402901202004-01-16016 January 2004 License Amendment Request 201 to the Kewaunee Nuclear Power Plant Technical Specifications, Equipment Hatch and Control Room Post Accident Recirculation System. ML0335704692003-12-12012 December 2003 License Amendment Request 198, ILRT 5-Year Extension, NMC Response to NRC Request for Additional Information. ML0332505592003-11-20020 November 2003 Tech Spec Pages for Amendment No. 171, Revising the Reporting Requirements for the Discovery of Defective or Degraded Steam Generator Tubes ML0318206132003-06-20020 June 2003 License Amendment Request 198 to Kewaunee TS for One Time Extension of Containment Integrated Leak Rate Test Interval ML0233803042002-11-22022 November 2002 License Amendment Request 189 to Kewaunee TS Regarding Modification of Diesel Generator Inspection Requirements 2011-08-30
[Table view] |
Text
e. Service Water System
- 1. The reactor shall not be made critical unless the following conditions are satisfied, except for LOW POWER PHYSICS TESTS and except as provided by TS 3.3.e.2.
A. TWO service water trains are OPERABLE with each train consisting of:
- 1. TWO service water pumps
- 2. An OPERABLE flow path consisting of all valves and piping associated with the above train of components and required to function during accident conditions. This flow path shall be capable of taking a suction from the forebay and supplying water to the redundant safeguards headers.
- 3. An OPERABLE turbine building service water header isolation valve and associated isolation logic capable of closing the header isolation valve, or a closed and deactivated turbine building service water header isolation valve.
B. The Forebay Water Level Trip System Is OPERABLE.
- 2. During power operation or recoveryfrom an Inadvertent trip, ONE service water train may be inoperable for a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. If OPERABILITY is not restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, then within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be Initiated to:
- Achieve HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- Achieve HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- Achieve and maintain Reactor Coolant System Tag less than 3500 F by use of alternate heat removal methods within an additional 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
TS 3.3-7 T37imut lb. 177
TABLE TS 4.1-1 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TEST OF INSTRUMENT CHANNELS CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS
- 43. AFW Pump Low Not Applicable Each refueling cycle Each refueling Discharge Pressure Trip cycle
- 44. Axial Flux Difference Weekly Verify AFD within limits for each OPERABLE (AFD) excore channel
- 45. Service Water Turbine Not Applicable Each refueling cycle Each refueling Header Isolation Logic cycle Trip (SW 4 A/B)
Page 7 of 7 Pg77Ai t I1t. 177
The spray additive system may be inoperable for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The containment spray system would still be available and would remove some iodine from the containment atmosphere in the event of a Design Basis Accident. The 72-hour completion Ume takes into account the containment spray system capabilities and the low probability of the worst case Design Basis Accident occurring during this period.
One component cooling water pump together with one component cooling heat exchanger can accommodate the heat removal load either following a loss-of-coolant accident or during normal plant shutdown. If, during the post-accident phase, the component cooling water supply were lost, core and containment cooling could be maintained until repairs were effected.(8)
A total of four service water pumps are installed and a minimum of two are required to operate during the postulated loss-of-coolant accident. (9)The service water valves in the redundant safeguards headers have to be OPERABLE in order for the components that they supply to be considered OPERABLE.
The various trains of equipment referred to in the specifications are separated by their power supplies (i.e.: SI Pump 1A, RHR Pump 1A and Valve SM-4A, etc.). Shared piping and valves are considered to be common to both trains of the systems.
Service Water Header Isolation Logic (TS 3.3.e. A.Z3' The turbine building service water (SW') header isolation logic automaltically closes valves SWV-4A and SW-4B on a Safety Iniection (Sl) signal coincident with a servdicewater low-pressure signal.
Eailure to isolate the turbine building from the service water header durino a de-sin basis accident may result in Insufficient oressure In the containment fan coil 'units disharage Piping or decreased heat removal aoabilitv in other safety-related components. Tlhe isolation logic is only required to function for the SW train aligned to the turbine building header during a design basis accident.
The isolation logic is OPERABLE when turbine buildina service water header isolation valves (SWV-4A and SW-4B1) are capable of automatically closina from a safety iniection signal coincident with a low header pressure signal from the service water header Pressure stitch-es- If either inout into the Isolation logic is inoperable. the Isolation flunction can be returned to OPERABLE statusby tripnpin the affected circuit.
TD urement a chanae In the valve Position by a single active failure when the valve or isolation logic is inoperable, the turbine building service Water header isolation valve is deactivated. Removing or interrupting the valves motiye force deactiYates the isolation valve. De-activation may be accomplished by isolating air to the yalye, removing the supply fuse for the solenoid, or any other means for ensuring the valve cannot be affected by a single active failure.
° USAR Section 9.3 9)USAR Section 9.6 Awrret N. 177 TS B3.3-4 08/200712004a