September 2004 Monthly Operating Report for Point Beach Units 1 and 2
ML042940498
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/12/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0105
Download: ML042940498 (6)


Text

Committed to NuclearExcellene Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC October 12, 2004 NRC 2004-0105 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for September 2004 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, P mt Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region IlIl, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW INPO Records Center I','

6590 Nuclear Road

Telephone: 920.755.2321

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 10/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD September - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,015.4 245,161.3
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,977.7 241,574.4
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 365,470.5 2,498,193.5 112,392,505.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 10/14/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Sectember 2004 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/AN/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other(Explain)

SUMMARY

Unit I average daily power for the month of September was 507.6 MWe.

There were no LERs issued in September for Unit 1.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 10/04/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD September - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6,499.9 239,847.6
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 6,464.9 236,701.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 372,725.5 3,345,495.5 111,846,577.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 10/14/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: September 2004 (Month/Year)

TYPE METHOD OF CACTIONS CTV NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of September was 517.7 MWe.

There were no LERs issued in September for Unit 2.